Ack Receipt of Transmitting Copy of Third Quarterly Status Rept of CE Cspu
ML20151K355
Person / Time
Site: 07000036
Issue date: 07/25/1997
From: Weber M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Sharkey R
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
TAC-L30988, NUDOCS 9708060064
Download: ML20151K355 (2)


Text

_ _ _.

July 25, 1997 1

Mr. Robert W. Sharkey, Manager Regulatory Compliance Combustion Engineering, Inc.

3300 State Road P Hematite. MO 63047

SUBJECT:

CRITICALITY SAFETY PROGRAM UPDATE (TAC NO. L30988) i

Dear Mr. Sharkey:

This acknowledges receipt of your letter of June 27, 1997, transmitting a copy of the third quarterly status report of Combustion Engineering's (CE) i Criticality Safety Program update (CSPU).

4 CE*s CSPU plan was submitted on September 20. 1996, and is designed to formalize and strengthen CE's nuclear criticality safety program at the Hematite Missouri site.

In that plan, you committed to submit a progress report of the implementation of the CSPU on a quarterly basis.

j We are please to know from your June letter that the progress on the CSPU is essentially on schedule except a 10-month extension for the completion of Automate Change Management Process under the task of configuration control.

However, this extension will not alter the final completion date of that task.

Your cooperation in keeping us informed of the progress of the CSPU is appreciated.

4 Sincerely, i

Original signed by: Madams for i

Michael F. Weber. Chief Licensing Branch 1

Division of Fuel Cycle Safety and Safeguards NMSS i

Docket 70-36 License SNM-33 j

i Distribution Docket 70-36 PUBLIC NRC File Center FCSS R/F Region III FCLB R/F GShear. RIII NMSS R/F 4

HFelsher TReidinger RIII i

[G:\\cehss]

OFC FCLB C

FCLB C-FCLB FCLB nj g D

NAME SSoong 4 L PShea M KHardin NI MWeber DATE 7/A/97 7 6 % //97 7/ 2 //97 7/

/97 C = COVER E

  • COVER & ENCLOSURE N = NO COPY 0FFICIAL RECORD COPY 9700060064 970725 PDR ADOCK 07000036 HC HilCENTER COPY

~.

_ - ~. -

-. ~

~ pnyou

['

lt UNITED STATES E

NUCLEAR REGULATORY COMMISSION If WASHINGTON, D.C. 20555-0001

\\,.....f July 25,1997 Mr. Robert W. Sharkey, Manager Regulatory Compliance i

Combustion Engineering. Inc.

3300 State Road P Hematite, MO 63047

SUBJECT:

CRITICALITY SAFETY PROGRAM UPDATE (TAC NO. L30988)

Dear Mr. Sharkey:

This acknowledges receipt of your letter of June 27. 1997, transmitting a copy of the third quarterly status report of Combustion Engineering's (CE)

Criticality Safety Program update (CSPU).

CE's CSPU plan was submitted on September 20. 1996, and is designed to formalize and strengthen CE's nuclear criticality safety program at the Hematite, Missouri site.

In that plan you committed to submit a progress report of the implementation of the CSPU on a quarterly basis.

We are.please to know from your June letter that the progress on the CSPU is essentially on schedule except a 10-month extension for the completion of Automate Change Management Process under the task of configuration control.

However, this extension will not alter the final completion date of that task.

Your cooperation in keeping us informed of the progress of the CSPU is appreciated.

Sincerely,-

f[ *c t; OChr-)

/tr Michael F. Weber Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-36 License SNM-33

,,. -,. - -