ML20151K310
| ML20151K310 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/25/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20151K317 | List: |
| References | |
| NUDOCS 8808030161 | |
| Download: ML20151K310 (2) | |
See also: IR 05000313/1988017
Text
.
.
. ..
JUL 2 51988
-
Docket No. 50-313
License No. DPR-51
Arkansas Power & Light Company
ATTN:
Mr. Gene Campbell
Vice President, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT N0. 50-313/88-17
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted
by L. Lawyer on May 31 - June 10,1988.
The inspection included a review of
Emergency Operating Procedures for your Arkansas Nuclear One Unit 1.
At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
Although deficiencies were identified, the Emergency Operating
Procedures were found to be adequate for continued operation of the facility.
The enclosed inspection report documents the disputed recommendations (see
asterisked items in Appendix B.9.b, Appendix C.3.b, 7.i, and 14.a).
These were
discussed in the exit meeting.
To define clearly Arkansas Power & Light Company's position on the disputed
items and plans for corrective action on the remaining inspection findings, we
request that AP&L respond in writing to this report.
Within 30 days of the date
of this letter, NRC requests that AP&L respond with a statement of intended
corrective action for each of the findings from this inspection and the dates
that action will be completed.
The response requested by this letter and its enclosure is not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub L. No.96-511.
RIV:C:
~
D:DRS 'f
D:DRP%
.
JLMil y,n
UCallan
JEGagl (rdo
? h/ ($
f1/>/, 80
l N1988
I
i({
8808030161 880725
ADOCK 05000313
0
,
_ _ _ _ _ _ _ _ - _ _ _ _
.
,
a
.
Arkansas Power & Light Company
-2-
Should you have any questions concerning this letter, please contact us.
Sincerely,
Orisinal signed Hy
I. J. Catbn
L. J. Callan, Director
DivisionofReactorProjects
Enclosures:
1.
NRC Inspection Report
50-313;368/88-17
2.
Appendix A - Procedures Reviewed
3.
Appendix B - Technical Comments
4.
Appendix C - Writer's Guide and
Human Factors Discrepancies
5.
Appendix 0 - Nomenclature Discrepancies
Identified by NRC C0P Inspection Team
6.
Appendix E - List of Abbreviations
cc w/ enclosure:
Arkansas Nuclear One
ATTN: J. M. Levine, Executive Director
Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bcc to DMB (IE01)
bcc distrib, by RIV:
- RRI
R. D. Martin, RA
RPSB-DRSS
- Section Chief (DRP/A)
- Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
'
- RSTS Operator
- ProjectEngineer
- C. Harbuck, NRR Project Manager
- R. Hall
i
- DRS
- TSS
W. Regan, NRR
R. Gallo, RI
C. Julian, RII
G. Wright, RIII
J. Gagliardo, RIV
R. Zimmerman, RV
'
- w/766
l
I