Deficiency Rept CP-85-052 Re Cable Tray Hanger Reverification Program.Initially Reported on 851220. Applicable Procedures & Field Verification Methods & Validation of Cable Tray Hangers Will Be Complete by 880930
ML20151K320
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/26/1988
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-85-052, CP-85-52, TXX-88546, NUDOCS 8808030162
Download: ML20151K320 (2)


Text

- . __ .

~ -

. r M

?E Log # TXX-88546 File # 10110 r x 903.9 7UELECTRIC - Ref # 10CFR50.55(e) s)"",Lcg, July 26, 1988 U. 5. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NO. 50-445 CABLE TRAY HANGER REVERIFICATION PROGRAM SDAR: CP-85-052 (SUPPLEMENTAL REPORT)

Gentlemen:

On December 20, 1985, we notified you via our report TXX-4657 of a reportable deficiency regarding the Cable Tray llanger Reverification Program. Our letter logged TXX-6435, dated May 13, 1987, identified this issue as one for which the original completion date for the implementation of corrective actions was fuel load (based on a previous fuel load date) and the imple m ,iation of these actions was still in progress. This report is submitted +L provide the corrective actions being implemented to resolve this issue.

To correct the defiencies identified, the following corrective actions have been completed:

o Revision of applicable procedures / Field Verification Methods.

o Training of personnel to the revised criteria. .

o Validation / inspection of cable tray hangers in accordance with the revised criteria (including those which had been previously field verified and inspected in the initial phase of the program).

8808030162 880726 PDR ADOCK 05000445 g PNU

_ _ . . _ _ _ . , _ _ qC

~ .

.TXX-88546 July 26, 1988 Page 2 of 2 As'a result.of the Cable Tray and Cable Tray Hanger Corrective Action Program (CAP) validation / inspection effort (described above), existing deficiencies were identified, documented, and evaluateo. Modifications required by those

~ deficiency documents will'be completed by September 30, 1988.

Very truly yours, h.b-W. G. Counsil O.

By:

D. R. Wooclan Docket Licensing Manager CBC/grr c - R. D. Martin, Region IV Resident inspectors, CPSES (3) l i