Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-2744, Forwards Endorsements 1 to Nelia Policy N-113 & Maelu Policy M-113 + (ML20151J678)
- ML20151J683 + (ML20151J683)
- ML20151J686 + (ML20151J686)
- IR 05000331/1997011 + (ML20151J687)
- ML20151J689 + (ML20151J689)
- ML20151J694 + (ML20151J694)
- ML20151J700 + (ML20151J700)
- ML20151J710 + (ML20151J710)
- ML20151J715 + (ML20151J715)
- ML20151J723 + (ML20151J723)
- ML20151J725 + (ML20151J725)
- ML20151J727 + (ML20151J727)
- ML20151J728 + (ML20151J728)
- ML20151J731 + (ML20151J731)
- ML20151J733 + (ML20151J733)
- ML20151J740 + (ML20151J740)
- ML20151J744 + (ML20151J744)
- 05000455/LER-1988-004, :on 880506,main Feedwater Pump Tripped Due to Improper Isolation of Electrohydraulic Control Fluid Supply. Caused by Cognitive Personnel Error.Personnel Counseled & Procedures Revised + (ML20151J745)
- ST-HL-AE-5701, Submits 120-day Response to GL 97-01, Degradation of CR Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations. Affidavit Supporting Response to GL 97-01, Encl + (ML20151J755)
- ML20151J758 + (ML20151J758)
- TXX-9716, Forwards Response to GL 97-01, Degradation of CR Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations. Affidavit Supporting Response Encl + (ML20151J761)
- ML20151J764 + (ML20151J764)
- ML20151J767 + (ML20151J767)
- ML20151J772 + (ML20151J772)
- ML20151J776 + (ML20151J776)
- ML20151J781 + (ML20151J781)
- ML20151J782 + (ML20151J782)
- ML20151J783 + (ML20151J783)
- ML20151J786 + (ML20151J786)
- IR 05000155/1997008 + (ML20151J787)
- ML20151J788 + (ML20151J788)
- ML20151J794 + (ML20151J794)
- ML20151J796 + (ML20151J796)
- ML20151J799 + (ML20151J799)
- ML20151J810 + (ML20151J810)
- ML20151J811 + (ML20151J811)
- PNO-III-88-035, on 880303,Univ of Toledo Notified NRC That Extensive Radium Contamination Found in Crawl Space Which Had Been Locked & Posted.News Media Carried Repts of NRC Insp Findings.Independent Evaluation Suggested + (ML20151J815)
- ML20151J822 + (ML20151J822)
- ML20151J831 + (ML20151J831)
- ML20151J836 + (ML20151J836)
- IR 05000528/1988020 + (ML20151J837)
- ML20151J838 + (ML20151J838)
- ML20151J839 + (ML20151J839)
- PNO-IV-88-059, on 880724,unit Shut Down & Cooldown Commenced to Replace Leaking Gaskets for Two Flanges on Pressurizer. Plant Restart Expected to Begin by 880727 + (ML20151J841)
- ML20151J846 + (ML20151J846)
- IR 05000373/1997006 + (ML20151J849)
- PNO-III-88-037, on 880412,approx 1,000 Gallons of Radioactive Water Drained from RHR Sys Piping Into Equipment Room.Spill Occurred When RHR Valves Returned to Normal Positions After Leak Rate Testing.Cleanup of Rooms & Equipment Initiated + (ML20151J857)
- ML20151J861 + (ML20151J861)
- ML20151J866 + (ML20151J866)
- ML20151J872 + (ML20151J872)
- ML20151J874 + (ML20151J874)