Forwards Insp Repts 50-454/97-08 & 50-455/97-08 & NOV
ML20151J700
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/23/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Graesser K
COMMONWEALTH EDISON CO.
Shared Package
ML20151J707 List:
References
50-454-97-08, 50-454-97-8, 50-455-97-08, 50-455-97-8, NUDOCS 9708050235
Download: ML20151J700 (4)


See also: IR 05000454/1997008

Text

. . _ . _ _ _ _ __

g "2 C

UNITED STATES

3 NUCLEAR REGULATORY COMMISSION

,

D

S

[

REGloN ill

801 WARRENVILLE ROAD

g , g/

-

h, usLE. ILUNOIS 60532-4351

,.....

July 23, 1997

Mr. K. Graesser

! Site Vice President

Byron Station

!

' Commonwealth Edison Company

4450 N. German Church Road

l Byron, IL 61010

1

!

SUBJECT: NRC INSPECTION REPORT 50-454/97008(DRP); 50-455/97008(DRP) AND

NOTICE OF VIOLATION

i

Dear Mr. Graesser:

l

On June 12,1997, the NRC completed an inspection at your Byron 1 & 2 reactor

l

l

facilities. The enclosed report presents the inspection results.

t

During this 6-week inspection period, the inspectors observed excellent operator

performance during two Unit 1 shutdowns for equipment repairs. Preparations to reduce

i

power and shut down Unit 1 and Unit 2 due to a missed technical specification (TS)

l

~

surveillance were also well planned and executed. Heightened level of awareness briefings

held prior to all shutdowns continue to be thorough with emphasis on procedural i

compliance, control of personnel in the control room, reactivity control, and lessons  !

learned.

I

Based on the results of this inspection, certain of your activities appeared to be in violation

of NRC requirements. The inspectors identified three violations. The most significant

dealt with preconditioning the 28 diesel driven auxiliary feedwater pump engine by running

the ASME surveillance prior to the slave relay start surveillance. Although the inspectors

considered the preconditioning incident to be isolated due to inadequate test scheduling, I

such an activity might have an adverse effect on the validity of test results. The second

violation involved the failure to perform the corrective actions stated in an LER, and the

third violation involved not utilizing the temporary alteration process for installing a strip

chart recorder attached to a safety-related 125V dc battery charger.

l

The violations discuss above are cited in the enclosed Notice of Violation. The

i circumstances surrounding the violations are described in detailin the enclosed report.

i Please note that you are required to respond to these violations and should follow the

j

!

instructions specified in the enclosed Notice when preparing your response. The NRC will

use your response, in part, to determine whether further enforcement action is necessary

to ensure compliance with regulatory requirements.

!

l

\

k

.

0500B6 QE%$@l%%%!

9708050235 970723

i PDR ADOCK 05000454

l G PDR

l

. . - - - . .. - .. .. _ -- . - _ _ - - _ _ -

  • K. Grzesser -2-

l

!

.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, ,

its enclosure (s), and your response to the Notice will be placed in the NRC Public

l

Document Room (PDR). I

Sincerely,

i

/s/ R. N. Gardner for  !

I

Geoffrey E. Grant, Director,

Division of Reactor Projects i

Docket Nos. 50-454; 50-455 I

License Nos. NPF-37; NPF-66 l

l

Enclosures: 1. Notice of Violation 1

2. Inspection Report 50-454/455-97008(DRP) I

cc w/ encl: T. J. Maiman, Senior Vice President i

Nuclear Operations Division l

D. A. Sager, Vice President, ,

Generation Support l

l H. W. Keiser, Chief Nuclear

l Operating Officer

K. Kofron, Station Manager

D. Brindle, Regulatory Assurance

Supervisor

l 1. Johnson, Acting Nuclear

! Regulatory Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce Commission

Document Control Desk-Licensing

PLEASE SEE P1GN100S CONCURRENCES

DOCUMENT NAME: R :\l N S PR PTS \PO W E R S\BY R O\BY R 97008.D R P

To receive a copy of this document, indicate in the box "C" = Copy without attach /encI

"E" = Copy with attach /enci "N" = No copy

OFFICE Rlli Rlli Rlll h Rlli N

"

! NAME Tongue /co Lanksbury Clayton Grant KNh

,,-

'

DATE 7/ /97 7/ /97 7/2S97 7/6/97

OFFICIAL RECORD COPY

.- _ _ - - _ - . . - - . - - - . . _ . -- -

- K. Greessar -2-

.

'

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response to the Notice will be placed in the NRC Public

Document Room (PDR).

"

Sincerely,

4

Geoffrey E. Grant, Director,

Division of Reactor Projects

,

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosures: 1. Notice of Violation

2. Inspection Report 50-454/455-97008(DRP)

T. J. Maiman, Senior Vice President I

cc w/ encl: 1

Nuclear Operations Division

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear i

Operating Officer l

K. Kofron, Station Manager

D. Brindle, Regulatory Assurance

Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer, Wisconsin l

State Liaison Officer  !

Chairman, Illinois Commerce Commission

Document Control Desk-Licensing

DOCUMENT NAME: R:\l N S PR PT S\PO W E R S\BY R O \BY R 97008. D R P

To receive a copy of this document, indicate in the box "C" = Copy without attach /enci

"E" = Copy with attach /enci "N" = No copy

OFFICE Rlll 6 Rill O Rlll

NAME Tongue /co@h Lanksbury@$ Grant

DATE 7/6/97 7/d/97 7/ /97

OFFICIAL RECORD COPY

v _ - _ _ .

- . . . _~ _

. _ - . . = , .. . . _ . . . - . . - - . . . - .-. .- - .

i

. K. Greesar -3-

.

Distribution:

Docket File w/enci
OC/LFDCB w/enci DRP w/enci

l SRI Byron, Braidwood, Zion w/enct PUBLIC IE-01 w/enct

Project Manager,- NRR w/enci . CAA1 w/enci (E-mail)

A. B. Beach, w/ encl RAC1 (E-Mail) w/enci l

Rill Enf. Coordinator, w/ encl Deputy RA, w/ encl I

Rill PRR w/ encl. DRS (2) w/enci

TSS w/enci DOCDESK (E-mail)

l

l

t

I

l

,

1

l

!

I

l

{

f

,

l l

l

l

l

I

!

!

I

'

l

'

,

I

l

l

l

,

F