r7 Log # TXX-88358
=.
File # 10010 r
C 903.10 7UELECTRIC Ref. # 10CFR50.55(e)
Wmism G. Counsil rmw,ve ro r"*'"'
April 15, 1988 U.-S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 SEISMIC DESIGN OF CONDUlT SDAR:
CP-86-53(SUPPLEMENTALREPORT)
Gentlemen:
On October 21, 1986, we notified you by our letter, logged TXX-6054, of a deficiency involving the seismic design of conduit, which we deemed reportable under the provisions of 10CFR50.55(e). Our latest report on this issue was TXX-88203, dated February 24, 1988.
This report is submitted to update our completion schedule for Unit 1 corrective actions.
In our most recent report on this issue (TXX-88203), we indicated that Unit I corrective actions would be completed by April 30, 1988.
However, corrective actions for Unit I have been rescheduled for completion by September 26, 1988.
Very truly yours,
$7 W. G. Counsil RSB/gj I
c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) j0 l
1 0 8804210173 880415 PDR ADOCK 05000445 i