Interim Deficiency Rept CP-88-28 Re Cracks Found in Several Sections of Tube Steel Utilized in Site Fabrication of Pipe Supports.Util Continuing Evaluation of Mfg Process at Supplier Facility.Next Rept Will Be Submitted by 880715
ML20151J767
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/13/1988
From: Counsil W, John Marshall
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-88-28, TXX-88393, NUDOCS 8804210188
Download: ML20151J767 (2)


Text

__ - _-

u .. ; ..

  1. TXX-88393

=- = Lo$e#10110 Fi C C 903.9 )

HlELECTRIC Ref.#10CFR50.55(e)

April 13, 1988 '

tm.,mox, m a., ,

U. S. Nuclear Regulatory Commission Attn: Document Control Desk i Washington, D. C. 20555

SUBJECT:

COMANCilE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS, 50-445 AND 50-446 TVBE STEEL MANUFACTURING DEFECTS SDAR: CP-88-28 (INTERIM REPORT)

Gentlemen:

On March'14, 1988, we verbally notified your office of a deficiency involving .

cracks found in several sections of tube steel utilized in the site fabrication of lipe supports. Specifically, during the assembly of a pipe  ;

support, a crac( on the internal radius of a piece of tube steel was  ;

identified. Further investigation has identified similar defects on tube -

steel supplied by the same manufacturer and received on the same Receiving inspection Report (RlR).

In addition, some of the tube steel sections under evaluation appear to be undersized.  ;

in order to assess these deficiencies, a metallurgical investigation has been  :

performed to determine if the steel plate used to fabricate tube steel was '

defective. Preliminary results indicate the base material meets the chemical and material properties of the specification and suggests the deficiencies

  • occurred during the manufacturing process, t

We are continuing our evaluation of the manufacturing process at the supplier facility. Additionally, the supplier is examining records in order to establish unusual conditions which might have caused the cracks on the day of manufacture.

[

A hold has been placed on the remaining (uninstalled) tube steel received i under the same purchase order. Corrective action to be taken will depend upon the final results of our investigation. This activity will be completed prior to Unit I and 2 fuel load.

s 8804210188 880413  ;

PDR s

ADOCK 05000445 DCD {) .

400 North Oks Street LB Si De&ss Te as U.41

^

c. >

TXX-88393 April 13, 1988 Page 2 of 2 We will submit our next report on this issue no later than July 15, 1988.

Very truly yours,

[d, 61 [ou w s. L W. G. Counsil

    • ^

By:

J. S. Marshall Generic Licensing Manager HAM /grr c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3)