Forwards Insp Rept 50-155/97-08 on 970430-0616 & Nov. Violations Involved Failure to Follow Procedures During CR Drive Insertion Time Testing
ML20151J764
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 07/22/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Powers K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20151J769 List:
References
50-155-97-08, 50-155-97-8, NUDOCS 9708050247
Download: ML20151J764 (5)


See also: IR 05000155/1997008

Text

l . . ,

  • *

pm Rfo

ug#o

UNITED STATES

g

NUCLEAR REGULATORY COMMISSION

p,

REGloN lli

Y

%

j

801 WARRENVILLE ROAD

g

usLE. ILUNols 60532-4351

,

a...+

July 22, 1997

.

K. P. Powers, Plant General Manager

Big Rock Point Nuclear Plant

Consumers Energy Company

10269 US 31 North

Charlevoix, MI 49720

-

SUBJECT:

NRC INSPECTION REPORT 50-155/97008(DRP)

NOTICE OF VIOLATION

L

Dear Mr. Powers:

16,1997, the NRC completed an inspection at your Big Rock Point Nuclear Plant.

On June

The enclosed report presents the results of that inspection.

j

{

During the 6-week period covered by this inspection, operations, maintenance, and

engineering activities were generally performed in a satisfactory manner. Operability

training, a problem identified in past NRC inspections, was effective in providing operators

with a uniform understanding of how the operability determination process is conducted.

However, the containment equipment inner door was lef t open on May 30, and in spite of

')

continuous tours by operators every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, this condition was not identified until 20

hours later. Also, our review of several CRD surveillance tests identified several that were

left with identified insertion speeds outside of procedural requirements. These events

,

highlight the need to provide continued focus and attention by plant staff to assure that

plant conditions and components remain within procedural requirements.

i

Based on the results of this inspection, two violations of NRC requirements were

identified. The first violation involved a failure to follow procedures during control rod

drive insertion time testing. The second violation involved a failure to take prompt

corrective action when the containment equipment-lock inner door was found open. The

violations are cited in the enclosed Notice of Violation, and the circumstances surrounding

the violations are described in detail in the enclosed report. Please note that you are

required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

{

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

!

6

(fl

i

050037

,

,

lil.lil.lllillll!.Illll.illll.llllll.

lllli

.

.

9708050247 970722

PDR

ADOCK 05000155

0

PDR

.b

  • O

.

K. P. Powers

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosures, and your response will be placed in the NRC Public Document Room (PDR).

Sincerely,

h

'

.

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No. 50-155

License No. DPR-6

Enclosures:

l

1. Inspection Report

No. 50-155/97008(DRP)

2. Notice of Violation

cc w/ encl:

Robert A. Fenech, Senior Vice

President, Nuclear, Fossil

and Hydro Operations

James R. Padgett, Michigan

Public Service Commission

Michigan Department of

Environmental Quality

Department of Attorney General (MI)

\\

\\

l

l

I

. _ _

.

__.

.

_ _ . _ _ _ _ . _ .

_ _ .

_ __ .

_ _.

_>

.

.

K. P. Powers

-2-

i

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosures, and your response will be placed in the NRC Public Document Room (PDR).

,

Sincerely,

!

,

/s/ Ronald N. Gardner for

Geoffrey E. Grant, Director

Division of Reactor Projects

Cacket No. 50-155

License No. DPR-6

Enclosures:

1. Inspection Report

No. 50-155/97008(DRP)

2. Notice of Violation

i

cc w/ encl:

Robert A. Fenech, Senior Vice

President, Nuclear, Fossil

and Hydro Operations

James R. Padgett, Michigan

Public Service Commission

Michigan Department of

Environmental Quality

Department of Attorney General (MI)

Docket File w/enct

OC/LFDCB w/enci

BRP PM, NRR w/ encl

DRP w/enct

SRI BRP, Palisades w/enct

PUBLIC IE-01 w/enct

A. B. Beach, w/encI

CAA1 (E-mail)

Deputy RA, w/ encl

Rlli PRR w/ encl

Rlll Enf. Coordinator, w/ encl

DRS (2) w/ encl

TSS w/ encl

DOCDESK (E-mail)

See attached concurrences

Document: R :\\l ns prpts\\ pow e rs\\ big r\\brp97008. d rp

To receive a copy of this document, indicate in the box "C" = Copy without attach /enci

"E" = Copy with attach /enci "N" = No copy

OFFICE

Rlli

Rlli

Rlli

Rlli

l

NAME

Jackiw:dp

Jickling

Burgess

Gardner/ Grant

i

l

DATE

07/ /97

07/ /97

07/ /97

07/ /97

l

OFFICIAL RECORD COPY

i

l

!

._

..-

-

-

-

-

.

- -

- - - . -

. - -

.

.

K. P. Powers, Plant General Manager

l

,

!

Big Rock Point Nuclear Plant

Consumers Energy Company

10269 US 31 North

Charlevoix, MI 49720

SUBJECT:

NRC INSPECTION REPORT 50-155/97008(DRP)

NOTICE OF VIOLATION

Dear Mr. Powers:

On June 16,1997, the NRC completed an inspection at your Big Rock Point Nuclear Plant.

The enclosed report presents the resul s of that inspection.

t

During the 6-week period covered by this inspection, operations, maintenance, and

engineering activities were generally performed in a satisfactory manner.

Based on the results of this inspection, two violations of NRC requirements were

1

identified. The first violation involved a failure to follow procedures during control rod

drive insertion time testing. The second violation involved a failure to take prompt

l

corrective action when the containment equipment-lock inner door was found open. The

l

violations are cited in the enclosed Notice of Violation, and the circumstances surrounding

the violations are described in detail in the enclosed report. Please note that you are

required to respond to this letter and should follow the instructions specified in the

,

enclosed Notice when preparing your response. The NRC will uso your response, in part,

j

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosures, and your response will be placed in the NRC Public Document Room (PDR).

i

l

l

Sincerely,

i

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No. 50-155

,

License No. DPR-6

!

l

Enclosures:

l

1. Inspection Report

l

No. 50-155/97008(DRP)

2. Notice of Violation

(See attached distribution)

,

Document: R :\\lns prpts\\powe rs\\ big r\\brp97008.drp

i

To receive a copy of this document, indicate in the box "C" = Copy without attach /enci

"E" = Copy with attachlencl "N" = No copy

'

OFFICE

Rill

/

Rlli

M

Rill

Rlli

k

'

,,

h

Jickling

Q

Burgesh

Gardner/GrantD

NAME

Jac

07/f/97 [

07/d /97

07p/97

07/10/97

DATE

OFFICIAL RECORD COPY

- -

-

e,

a

m--

..

.

.

- -

. . .

.

. .

.

. . .

-

. . . - . -

_

. . - . .

..

.

I

!

K. P. Powers

-2-

l-

Distribution:

l

' cc w/ encl:

Robert A. Fenech,' Senior Vice

President, Nuclear, Fossil

and Hydro Operations

James R. Padgett, Michigan

Public Service Commission

Michigan Department of

Environmental Quality

Department of Attorney General (MI)

Docket File w/enci

OC/LFDCB w/enci

BRP PM, NRR w/enci

DRP w/ encl

SRI BRP, Palisades w/enct

PUBLIC IE-01 w/enct

A. B. Beach, w/enct

CAA1 (E-mail)

Deputy RA, w/enci

Rlli PRR w/ encl

Rlli Enf. Coordinator, w/ encl

DRS (2) w/enct

TSS w/ encl

DOCDESK (E-mail)

P

1

i

!'

l

I

1

,

1

I

.

.