ML20151J788
| ML20151J788 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 07/25/1988 |
| From: | Joseph Kelly NRC OFFICE OF SPECIAL PROJECTS |
| To: | Black S NRC OFFICE OF SPECIAL PROJECTS |
| References | |
| NUDOCS 8808030054 | |
| Download: ML20151J788 (6) | |
Text
a progDo UNITED STATES
~,,
NUCLEAR REGULATORY COMMISSION o
c WASHINGTON, D. C. 20555
+... /
s, July 25, 1988 MEMORANDUM FOR:
Suzanne Black, Assistant Director for Projects TVA Projects Division Office of Special Projects FROM:
Janet L. Kelly, Project Engineer Sequoyah Restart Branch TVA Projects Division Office of Special Projects
SUBJECT:
WEEKLY SCHEDULE OF TVA ACTIVITIES - WEEKS OF JULY 25 AND AUGUST 1, 1988 This schedule will be updated and issued each Friday to reflect activities for the forthcoming two-week period.
Please have your staff representative contact Ardel Sanders (492-0795) or Janet Kelly (492-0753) before noon each Thursday to provide your updated input.
Should you have any additional activities scheduled for the future, please add those to your two-week transmittal.
4 Janet L. Kelly, Project Enginee Sequoyah Restart Branch i
TVA Projects Division Office of Special Projects
Enclosures:
As stated
)
foi v
880803o054 880725
.I PDR ADOCK 05000327 R
Copies are telecopied to:
Ralph Shell
- (615 751-4959 Verification
- (615 751-3688 Tom Ippo11to 770-1745 Verification 770-6790 Frank McCoy
- FTS 242-4449 Verification
. FTS 242 6326 I
h
TVA ACTIVITIES WEEK OF JULY 25, 1988
~
DATE SUBJECT NRC PARTICIPANTS LOCATION SUN 7/24-26 Witness Browns Ferry LOP /LOCA "C" Resident Inspectors Browns Ferry Retest MON 7/25-29 OIL Inspection York Browns Ferry 7/25-29 Appendix R Inspection Wescott Sequoyah WED 7/27 Discussion regarding results of TVA's McCoy/Little Erowns Ferry SSFI Inspection 7/27 Browns Ferry Scheduling Meeting Black Browns Ferry 7/27 Operator Licensing Awards ceremony Partlow Browns Ferry THUR 7/28 Enforcenant Conference associated McCoy Sequoyah with UH1 valve inoperability 7/28 Meeting with Resident Inspectors to Little Browns Ferry discuss inspection program i
TVA ACTIVITIES WEE % OF AUGUST 1, 1988 DATE SUBJECT NRC PARTICIPANTS LOCATION MON 8/1-5 Surveillance Improvement Program Castleman Browns Ferry Evaluation 8/1-5 E01 Inspection Teaui begins reviewing Browns Ferry j
procedures off-site THUR 8/4 Commission Meeting - Status of SQN 1,2 Partlow White Flint i
i
4 July 25, 1988 MEMORANDUM'FOR: Suzanne Black, Assistant Director for Projects TVA Projects Division Office of Special Projects FROM:
Janet L. Kelly, Project Engineer Sequoyah Restart Branch TVA Projects Division Office of Special Projects
SUBJECT:
WEEKLY SCHEDULE OF TVA ACTIVITIES - WEEKS OF JULY 25 AND AUGUST 1, 1988 This schedule will be updated and issued each Friday to reflect activities l
for the forthcoming two-week period.
Please have your staff representative contact Ardel Sanders (492-0795) or Janet Kelly (492-0753) before noon each Thursday to provide your updated input.
Should you have any additional activities scheduled for the future, please add those to your two-week transmittal.
Original signed by Janet L. Kelly, Project Engineer Sequoyah Restart Branch TVA Projects Division Office of Special Projects
Enclosures:
As stated DISTRIBUTION Docket" W Projects Reading l
l L
l
{
l Trw
I~
s,...
s DISTRIBUTION FOR TVA ACTIVITIES REPORT FOR NRC FOR WEEKS OF: JULY 25 AND JUGUST 1 6: Docket' File NRC PDR J. Partlow 7-D-24 J. Axelrad 7-D-24 S. Richardson 7-E-23 J. M. Taylor 17-G-13 B. Hayes 3-E-4 W. Parler 15-B-18 F. McCoy RII i
B. D. Liaw 7-D-11 l
J. Scarborough 16-H-3 G. Felgate 16-H-3 P. Gwynn 16-H-3 C. Ader 16-H-3 E. Goodwin J. Donohew R. Auluck M. Sims G. Gears D. Moran P. Cortland J. Kelly TVA-Rockville l
l
[0
'\\ \\
- _ - _ - _