Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151H956 + (ML20151H956)
- ML20151H958 + (ML20151H958)
- ML20151H959 + (ML20151H959)
- ML20151H960 + (ML20151H960)
- AECM-88-0078, Forwards Description & Diagram of Design of Containment Air Lock Seal Air Sys at Plant,Per 880404 Telcon.Info Provided in Support of Review of Plant Air Lock Configuration as Followup to 880404 Discussion + (ML20151H961)
- ML20151H962 + (ML20151H962)
- ST-HL-AE-2612, Responds to NRC Re Violations Noted in Insp Repts 50-498/88-08 & 50-499/88-01.Corrective Actions:New & Revised Emergency Plan Implementing Procedures Issued Since License Obtained Submitted to NRC + (ML20151H963)
- ML20151H964 + (ML20151H964)
- ML20151H965 + (ML20151H965)
- ML20151H967 + (ML20151H967)
- PNO-II-88-043, on 880715,Augmented Insp Team Dispatched to Plant to Review Equipment Failure Events That Were Encountered During Planned Shutdown of Facility,Including Failure of F006 HPCI Valve + (ML20151H968)
- ML20151H969 + (ML20151H969)
- ML20151H970 + (ML20151H970)
- ML20151H971 + (ML20151H971)
- ML20151H974 + (ML20151H974)
- ML20151H975 + (ML20151H975)
- 0CAN078807, Responds to NRC Bulletin 87-002,Suppl 2,dtd 880610,providing List of Names & Addresses of Suppliers & Mfgs from Which Safety or nonsafety-related Ferrous Fasteners Have Been Purchased within Past 10 & 5 Yrs,Respectively + (ML20151H978)
- ML20151H979 + (ML20151H979)
- ML20151H980 + (ML20151H980)
- ML20151H982 + (ML20151H982)
- ML20151H983 + (ML20151H983)
- ML20151H984 + (ML20151H984)
- ML20151H985 + (ML20151H985)
- ML20151H988 + (ML20151H988)
- 05000265/LER-1997-008-05, :on 970629,five Control Rod Drives Did Not Receive Required Scram Insertion Time Testing Prior to 40% Power.Caused by Ineffective Operations.Rods Associated with Nwr Were Scram Timed & Declared Operable + (ML20151H992)
- ML20151H993 + (ML20151H993)
- ML20151H995 + (ML20151H995)
- ML20151H997 + (ML20151H997)
- ML20151J001 + (ML20151J001)
- ML20151J003 + (ML20151J003)
- ML20151J004 + (ML20151J004)
- ML20151J006 + (ML20151J006)
- ML20151J008 + (ML20151J008)
- ML20151J011 + (ML20151J011)
- ML20151J013 + (ML20151J013)
- ML20151J016 + (ML20151J016)
- ML20151J018 + (ML20151J018)
- ML20151J021 + (ML20151J021)
- ML20151J022 + (ML20151J022)
- ML20151J023 + (ML20151J023)
- ML20151J025 + (ML20151J025)
- ML20151J027 + (ML20151J027)
- 05000336/LER-1997-025, Forwards LER 97-025-00 Which Documents Event That Occurred at Mnps,Unit 2 on 910828.Submittal Delayed Due to Inadequate Review of Event at Time of Discovery.Commitments Made by Util,Listed + (ML20151J028)
- ML20151J032 + (ML20151J032)
- ML20151J034 + (ML20151J034)
- ML20151J041 + (ML20151J041)
- 05000336/LER-1997-025-02, :on 910828,discovered Potential of Single Failure of AFW Sys Via Condenser Hotwell make-up Valve. Caused by Failure to Consider Single Failure Scenarios.Night Order Issued to Maintain Condensate Storage Tank at 76% + (ML20151J044)
- ML20151J045 + (ML20151J045)
- ML20151J047 + (ML20151J047)
- ML20151J048 + (ML20151J048)
- ML20151J053 + (ML20151J053)