Responds to NRC Bulletin 88-003, Inadequate Latch Engagement in Hfa Type Latching Relays Mfg by Ge. Relays Not Employed at Plant
ML20151J023
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/11/1988
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CON-NRC-88-037, CON-NRC-88-37 IEB-88-003, IEB-88-3, VPNPD-88-210, NUDOCS 8804210032
Download: ML20151J023 (1)


Text

.,,

O O O Wisconsin Electnc a comr 231 W MICHIGAN,P O. BOX 2046.WLWAUKEE.W153201 (414)277 2345 VPNPD-88-210 NRC-88-007 April 11, 1988 Mr.

A.

Bert Davis, Regional Administrator Office of Inspection and Enforcement - Region III U.

S.

NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Davis:

DOCKETS 50-266 AND 50-301 RESPONSE TO NRC BULLETIN 88-03 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 This letter is in response to NRC Bulletin 88-03, "Inadequate Latch Engagement in HFA Type Latching Relays Manufactured by General Electric (GE) Company."

We have determined that GE type HFA latching relays are not employed at our Point Beach Nuclear Plant.

Accordingly, we conclude that the inspections required by this Bulletin are not applicable to Point Beach.

If you have any further questions or require additional information, please contact my office.

Very truly yours, a

/

(l$v} t[

C.

W.

Fay Vice President Nuclear Power Copies to NRC Resident Inspector NRC Document Control Desk (original)

Subscribed and sworn to before me this l2 th day of April, 1988.

uo h Mg c

Notary Public, St' ate of Wisconsin

\\

o My commission expires: 5-2 7 9n 8804210032 880411 PDR ADOCK 05000266 O