Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Y203 + (ML20137Y203)
- ML20137Y206 + (ML20137Y206)
- ML20137Y209 + (ML20137Y209)
- ML20137Y213 + (ML20137Y213)
- ML20137Y216 + (ML20137Y216)
- ML20137Y217 + (ML20137Y217)
- ML20137Y218 + (ML20137Y218)
- 05000327/LER-1997-005-01, :on 970319,two of Six Tested Main Steam Safety Relief Valves Not within TS Setpoint Tolerance.Appropriate LCOs Entered & Valves Found Outside TS Setpoint Tolerance Adjusted to within TS Tolerance & Retested + (ML20137Y219)
- ML20137Y221 + (ML20137Y221)
- ML20137Y222 + (ML20137Y222)
- ML20137Y228 + (ML20137Y228)
- ML20137Y230 + (ML20137Y230)
- ML20137Y232 + (ML20137Y232)
- 05000498/LER-1997-004, :on 970319,failed to Fully Test 4160 Volt Bus Undervoltage Logic Circuitry by Surveillance Procedures. Caused by Not Recognizing That Failure in One Actuation Scheme.Affected Logic Circuitry Was Tested + (ML20137Y234)
- ML20137Y235 + (ML20137Y235)
- ML20137Y237 + (ML20137Y237)
- ML20137Y241 + (ML20137Y241)
- ML20137Y244 + (ML20137Y244)
- ML20137Y249 + (ML20137Y249)
- 05000254/LER-1986-007-01, :on 860203 & 13,phase a Differential Current Relay on Bus 13-1 Tripped & Actuated Lockout Relay.Probably Caused by Spurious Actuation Due to Vibration.Mod Initiated to Replace Relays W/Relays Less Sensitive + (ML20137Y256)
- ML20137Y258 + (ML20137Y258)
- ML20137Y259 + (ML20137Y259)
- ML20137Y261 + (ML20137Y261)
- ML20137Y263 + (ML20137Y263)
- ML20137Y264 + (ML20137Y264)
- ML20137Y265 + (ML20137Y265)
- ML20137Y266 + (ML20137Y266)
- ML20137Y268 + (ML20137Y268)
- ML20137Y271 + (ML20137Y271)
- ML20137Y272 + (ML20137Y272)
- ML20137Y273 + (ML20137Y273)
- ML20137Y274 + (ML20137Y274)
- ML20137Y276 + (ML20137Y276)
- 05000369/LER-1985-035-01, :on 851030,B&W Fuel Assemblies Determined Incorrectly Stored Side by Side in Spent Fuel Pool.Caused by Inadequate Personnel Review of Tech Spec.Assemblies Placed in Checkerboard Pattern + (ML20137Y278)
- ML20137Y280 + (ML20137Y280)
- ML20137Y281 + (ML20137Y281)
- ML20137Y282 + (ML20137Y282)
- ML20137Y283 + (ML20137Y283)
- B11749, Forwards Amend 15 to FSAR & Responses to Selected Requests for Addl Info + (ML20137Y284)
- ML20137Y285 + (ML20137Y285)
- ML20137Y286 + (ML20137Y286)
- 05000304/LER-1986-003-03, :on 860203,14-day Approval of Temporary Change to Procedure E 015-1 Missed.Caused by Weakness in Administrative Procedure Review.Method of Tracking Approval Requirement Will Be Developed + (ML20137Y289)
- ML20137Y290 + (ML20137Y290)
- 05000352/LER-1985-086, :on 851030,main Control Room Chlorine Isolation & Emergency Fresh Air Sys Actuation Occurred.Caused by Defective Chlorine Analyzer Tape.Tape Replaced.New Chlorine Detection Sys Will Be Procured + (ML20137Y294)
- ML20137Y296 + (ML20137Y296)
- ML20137Y297 + (ML20137Y297)
- ML20137Y301 + (ML20137Y301)
- ML20137Y304 + (ML20137Y304)
- ML20137Y311 + (ML20137Y311)
- ML20137Y312 + (ML20137Y312)
- ML20137Y315 + (ML20137Y315)