Monthly Operating Repts for Mar 1997 for McGuire Nuclear Station Units 1 & 2
ML20137Y266
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/31/1997
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20137Y265 List:
References
NUDOCS 9704230003
Download: ML20137Y266 (10)


Text

. .

e 0FERATING DATA REPORT DOCKET NO 50-369 DATE Aoril 15. 1997 OPERATING STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346

1. Unit Naae: McGuire 1
2. Reporting Period: March I, 1997-March 31, 1997
3. Licensed Thersal Power (MWt): 3411
4. Naseplate Rating (6 toss MWel: 1305i Notes INameplate Rating
5. Design Electrical Rating (Net MWe b  !!B0 (Stoss MWe) calculated as
6. Maxisus Dependable Capacity (Stoss MWel:  !!71 1450.000 MVA : .90 poner
7. Maxinus Dependable Lapacity (Net MWeli 1129 factor per Page lii, B. If Changes Occur in Capacity Ratings (Itess Nuaber 3 Through 71 Since Last NURE6-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net NWel:
10. Reason For Restrictions, if any:

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 744.0 2160.0 134400.0
12. Number Of Hours Reactor Was Critical 0.0 1066.5 97458.4
13. Reactor Reserve Shutdown Hours --0-- --0-- --0--
14. Hours Generator On-Line 0.0 1059.7 96451.1
13. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Gross Thersal Energy Generated (MWH) 0 3487712 304307774 17, 6ross Electrical Energy Generated (MWH) 0 1210732 104500851 IB. Net Electrical Energy Generated (MWH) -2798  !!59226 99885082
19. Unit Service Factor 0.0 49.1 71.8 20, Unit Availability Factor 0.0 49.1 71.8
21. Unit Capacity Factor (Using MDC Net) 0.0 47.5 64.9
22. Unit Capacity Factor (Using DER Net) 0.0 4',.5 63.0
23. Unit Forced Outage Rate 0.0 0.0 12.7
24. Shutdown Scheduled Over Nest 6 Months (Type, Date, and Duration of Each):

Currently Refueling and Steam Generator Replacement 4

25. If Shut Down At End Of Report Period. Estimated Data cf Startup: May 09. 1997
26. Units In Test Status (Prior to Comaercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION 9704230003 970415 PDR ADOCK 05000369 R PDR

GPERATING DATA REPORT DOCKET WD 50-369 UNIT McGuire 1 1 DATE Acril 15, 1997 COMPLETED BY R. A. Willian TELEPHONE 704-382-5346 i

fl0 NTH March,1997 QAl AVERASE DAILY POWER LEVEL D_A1 AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Met) 1 0 17 0 2 0 IB 0 3 0 19 0 0 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 0 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT WAME Muyu utt, 1 +

DATE. ve / id/ w/ -

REPORT MONTH March 1997 COMPLETED BY x. A. williams TELEPHONE t I v e 1 - a es z - d.s e d (1) (2) (3) (4) (5) '

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE

  • O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 97 1 S 744.00 C 1 RC FUELXX END-OF-CYCLE 11 REFUELING OUTAGE ,

t t

t

, (1) (2) (3) (4) .

F Forced Reason- Method: Exhibit G - Instructions t S Scheduled A-Eq11ipment Failure (Explain) 1-Manual for Preparation of Data i B-Maintenance or test 2-Manual Scram Ent W Sheets Event Report (LER For Licensee '

C-Refueling 3-Automatic Scram '

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161))

E-Operator Training & License Examination i F-Administrative (5) i G-Operator Error Exhibit I - Same source  ;

H-Other (Explain) (Explain) r

.j t

i I

f 6

I DOCKET: 50 - 369 i UNIT: McGuire 1 Date: 04/15/97 NARRATIVE

SUMMARY

MONTil: March,1997 McGuire Unit I began the month of March in end -of-cycle 1i refueling and steam generator replacement outage. The unit was in the refueling outage the remainder of the month.

Prepared by: R. A. Williams Telephone:(704)- 382-5346

i I

t l

MONTHLY REFUELING INFORMATION REOUEST I 1. Facility name: McGuire. Unit 1

2. Scheduled next refueling shutdown: Currently Refueline
3. Scheduled restan following refueling: May 1997 Tile PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CliANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN TlilS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

l If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

l 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

l 7. Number of Fuel assemblies (a) 9 in the core: J93 (b) in the spent fuel pool: 791 9

8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
9. Projected date oflast refueling which can be accommodated by present license capacity: March 2006 DUKE POWER COMPANY DATE: April 15.1997 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 i

I l

l I

1 1

1 i

OPERATING DATA REPORT l l

DOCKET NO 50-370 DATE April 15. 1997 OPERATING STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346

1. Unit Name: McGuire 2
2. Reporting Period: March 1, 1997-March 31, 1997
3. Licensed Thersal Power (MWt): 3411
4. Naseplate Rating (Bross MWe): 1305e Notes eNameplate Rating
9. Design Electrical Rating (Net MWe):  !!80 (6 toss MWel calculated as
6. Maxiste Dependable Capacity (6 toss MWe):  !!71 1450.000 MVA : .90 power
7. Maxisua Dependable Capacity (Net MWe): 1129 factor per Page iii,
8. If Changes Occur in Capacity Ratings (Iteas Number 3 Thrcugh 71 Since Last NUREG-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, if any:

This Month Yr.-to-Date Cuaulative

11. Hours In Reporting Period 744.0 2160.0 114696.0
12. Number Of Hours Reactor Was Critical 744.0 2160.0 90502.6
13. Reactor Reserve Shutdown Hours --0-- - - l
14. Hours Generator On-Line 744,0 2160.0 09436.0 l
15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Gross Thereal Energy Generated (MWH) 2070129 6879205 293982115
17. Gross Electrical Energy Generated (MWH) 710452 2393136 102466171
18. Net Electrical Energy Generated (MWH) 678814 2301795 98270040
19. Unit Service Factor 100.0 100.0 78.0
20. Unit Availability Factor 100.0 100.0 70.0
21. Unit Capacity Factor (using MDC Net) 80.8 94.4 75.2
22. Unit Capacity Factor (Using DER Net) 77.3 90.3 72.6
23. Unit Forced Outage Rate 0.0 0.0 7.1
24. Shutdown S:heduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelinn and Steam Generator Reolacement - Sentember 18. 1997 - 100 davn

25. If Shut Down At End Of Report Period. Estinated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL DPERATION

. 4 . . _ . _ _ _ . . _

. _ ~ . . _ . . . _ . . _ . _ . . _ _ _ ~ . . - . . _ . _ . _ _ . _ _ . . _ _ _ _ _ . _ . .

-i I~ .

l

- OPERATING DATA REPORT l l DOCKET NO , 50-370 j l- UNii McGuire 2

! DATE April 15.1997 l COMPLETED BY R.A. Willines I

, TELEPHONE 704-382-5346 i-  ;

.I MONTH March.'1997 f Q,A1 AVERABE DAILY POWER LEVEL Q.A.1 AVERAGE DAILY POWER LEVEL ,

(Me-Net) (Me-Net) 1 1150 17 223 2 1150 1B '223 3  !!50 19 223 .l 4 1145 20 224 ,

i 5 1148 21 453

6. 1148 22 1084 'i l

7 1149 23 1140 8 1149 24 1142 9 1149 25 i144 10 1111 26 1146

!! 1139 27  !!46 12 1145 28 ' 1146 l

J 13 1095 29 1147 it 279 30 1147 ]

1 15 222 31 1145  ;

16 222 i

i 1

UNIT SHUTDOWNS AWD POWER REDUCTIONS DOCKET NO. 50-370.-

UNIT NAME ricuuixt; 2 DATE ve / id/ w/

REPORT MONTH March 1997 COMPLETED BY x. A. williams *

, TELEPHONE ( tus) -suz-33eb z (1) (2) (3) (4) (5) .

R MET-  !

E HOD I

T A OF LICENSE N Y S SHUT EVENT- SYS- CAUSE AND CORRECTIVE ,

O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO "

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE

~

2-P 97- 3-14 F --

A --

HH VALVEX FEEDWATER VALVE 2CF-30 FAILED TO CLOSE IN REQUIRED TIME WHILE-PERF "

VALVE' STROKE TIMING TEST 3-P 97- 3-21 S --

B --

HB VALVEX TURBINE CONTROL VALVE MOVEMENT  !

TESTING  ?

i t

i i

r

?

i (1) (2) (3) (4)

F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee;j C-Refueling 3-Automatic Scram Event Report (LER  !

D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) l

'J l

t i

i i

l

DOCKET: 50-370 UNIT: McGuire 2 Date: 04/15/97

. NARRATIVE

SUMMARY

i MONTH: March,1997 McGuire Unit 2 began the month of March operating at 100% full power. The unit operated at or near 100% power until 03/13/97 at 1700 when the unit decreased power to perform the turbine control valve movement and feedwater containment isolation valve testing. The tusine control valve movement test was aborted at 2228 when #1 governor valve failed to respond per procedure guidance. The unit held power at 23% on 03/14/97 at 0530 to 03/21/97 at 1104 due to feedwater valve 2CF-30 failed to close in required time while performing valve stroke timing test. The unit increased to 69% power and held from 03/21/97 at 1612 to 03/22/97 at 0025 to perform turbine control valve movement test. The unit returned to 100% full power on 03/22/97 at 0905 and operated at or near 100% full power the remainder of the month.

l Prepared by: R. A. Williams Telephone: (704)- 382-5346

1 l

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire. Unit 2
2. Scheduled next refueling shutdown: September 1997 1
3. Scheduled restart following refueling: December 1997 Tile PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee l regarding unreviewed safety questions? I

5. Scheduled date(s) for submitting propored licensing action and supporting information. I
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: l_9J3 9

(b) in the spent fuel pool: 969

8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
9. Projected date oflast refueling which can be accommodated by present license capacity:

December 2003 DUKE POWER COMPANY DATE: April 15.1997 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346