ML20137Y296

From kanterella
Jump to navigation Jump to search
Forwards QA Program Insp Rept 99901007/85-01 on 850610-12 & Notice of Violation
ML20137Y296
Person / Time
Issue date: 10/03/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Oiknine J
PRESCON CORP.
Shared Package
ML20137Y301 List:
References
REF-QA-99901007 NUDOCS 8510070285
Download: ML20137Y296 (2)


Text

O

/ 4 UNITED STATES 8' 'n NUCLEAR REGULATORY COMMISSION

$ WASHINGTON, D. C. 20555

,,,,,# October 3,1985 Docket No. 99901007/85-01 The Prescon Corporation ATTN: Mr. J. Oiknine President 1338 North WW White Road San Antonio, Texas 78220 Gentlemen:

This refers to the inspection conducted by K. R. Naidu and J. Harper of this office on June 10-12, 1985, of your facility at San Antonio, Texas and to the discussions of our findings with you and members of your staff at the conclusion of the inspection. We acknowledge the receipt of your letter dated July 23, 1985 informing us of the corrective action taken to correct certain adverse findings. A separate response to that letter will be sent to you.

The purpose of this inspection was to ascertain the adequacy of your Quality Assurance Program and verify its implementation.

Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. Specifically, you failed to develop and implement a program to evaluate and report defects in accordance with the requirements of 10 CFR Part 21.

The enclosed Notice of Violation is'sent to you pursuant to the provisions of Section 206 of the Energy Reorganization Act of 1974. You are required to submit to this office within 30 days from the date of this letter a written statement containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.

99901007 Yh

s Prescon Corporation October 3, 1985 In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's s Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, ORIGINAL SIGNED BY:

GARY G. ZECH Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1. Appendix A - Notice of Violation
2. Appendix B - Inspection Report No. 99901007/85-01 DISTRIBUTION:

,DMB:lE:09

'VPB Reading DQAVT Reading RVollmer JCollins JStone GHolahan, NRR EMerschoff KNaidu TBurns, BNL

  • See previous concurrences.

VPB:DQAVT SC/VPB:DQAVT BC/VPB:DQAVT DIR:DQAVT KNaidu: sam

  • EMerschoff* GGZech* e BKGrimes

-9/ps/85 9/6/85 9/;3/85 (;gl$f19/85

.