Informs of Concerns Re Earthquake Effects on Structural Integrity & Safety of Facility.Requests Info on Whether Earthquake Caused Seismic Forces at Site in Excess of Forces in Seismic Design for Facility Reactor
ML20137Y213
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/31/1986
From: Eckart D, Iberling J, Seiberling J
HOUSE OF REP.
To: Palladino N
NRC COMMISSION (OCM)
Shared Package
ML20137Y216 List:
References
RTR-NUREG-0887, RTR-NUREG-887 NUDOCS 8603120191
Download: ML20137Y213 (5)


Text

.

Congress of tije V.Initch 6tates Jpouse of Representatibes IEasWngton, D.C. 20515 January 31, 1986 The Honorable Nunzio J. Palladino Chairman Nuclear Regulatory Comission 1717 H Street, N.W.

Washington, D.C.

20555

Dear Mr. Chairman:

As we are sure you are aware, an earthquake struck this mornino in the heart of our congressional districts in northeast Ohio. Of imediate ccncern to us is the effect of this earthquake on the structural integrity and safety of the Perry nuclear power plant in Perry, Ohio.

Please infonn us by10:00 a.m. Monday, February 3 whether this earthquake caused seismic forces at the Perry site in excess of those specified in the seismic design for the Perry reactors. Please indicate the source of data which was used in obtaining the seismic force estimates, as well as a description of the process which was used in converting seismographic data into seismic force estimates.

In addition, please, answer the following questions:

What will be the effect of this event upon the Perry fuel load date?

What was the nature, scope and extent of damage to safety related and non-safety related structures, systems and components? What, if any leaks, occurred in safety and non-safety related systems?

Did the devices which record seismic data perform in accordance with their procurement specifications? Was the seismic data analysis performed in a timely and accurate manner?

At what time was the NRC operations center notified of this event?

At what time was the Commission notified? At what time were the relevant government entities in the Perry emergency planning area notified? Were these comunications conducted in the timely manner specified in the Perry Emergency Plan?

While we recognize that the information we are requesting will necessarily be of a preliminary nature, it is important that such preliminary information be available in order that we may adequately assess the suitability of the Commission's regulations concerning eqrthquake design for the Perry plant.

s6o312o191 86o131 E PDR RES

.~..r 2

t We exgact that your staff will be prepared early next week to brief Members of the Connittees on Energy and Commerce and Interior and Insular Affairs, as well as appropriate staff.

We appreciate your cooperation.

Sincerely, 1

A l

As DENNIS E.

ECX (RT JOHN F. SEIBERLING Member of Cong tss Member of Congress

^

CORRESPONDENCE CONTROL TICKET

=

- SECY NUPSER:

LOGGING DATE 2/5/86 86-0101 0FFICE OF THE SECRETARY Ref. EDO 1386 Denton for Action '

Cys: Stello ACTION OFFICE:

Eno Roe Rehm AUTHOR:

Rep. Dennis E. Eckart, Rep. John F. Seiberling Sniezek GCunningham AFFILIATION:

U.S. House of Representatives Taylor,

Keppler LETTER DATE:

2/4/86 FILE CODE

u. m 3 ADDRESSEE:

Palladino

SUBJECT:

Request the Conan. to seek a review of the data by the ACRS re the earthquake on the Perry Nuclear Power Plant.

ACTION:

Prepare Response for Chairman's Sign and Comm Review...Date due: Feb. 7 DISTRIBUTION:

RF, OCA to Ack. cy: ACRS SPECIAL HANDLING: NONE SIGNATURE DATE:

FOR THE COPNISSION BAC O

~

~

ReeM Op.Ese s

Bete....7 k Y b.

m....J. ~ t;;_.;

k 4

.