Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133J979 + (ML20133J979)
- ZS-2020-0001, Restoration Project Termination Plan FSS Final Report for Phase 4, A41 FSS Release Record - Survey Unit 10221C, Revision 1 + (ML20133K019)
- IR 05000324/2020001 + (ML20133K026)
- ML20133K048 + (ML20133K048)
- ML20133K050 + (ML20133K050)
- ML20133K053 + (ML20133K053)
- ML20133K055 + (ML20133K055)
- ML20133K056 + (ML20133K056)
- ML20133K063 + (ML20133K063)
- IR 05000255/2020001 + (ML20133K066)
- ML20133K067 + (ML20133K067)
- ML20133K069 + (ML20133K069)
- ML20133K071 + (ML20133K071)
- ML20133K072 + (ML20133K072)
- ML20133K073 + (ML20133K073)
- CP-202000312, Transmittal of Revised Emergency Plan (Revision 43) + (ML20133K082)
- ML20133K084 + (ML20133K084)
- ML20133K088 + (ML20133K088)
- ML20133K090 + (ML20133K090)
- PMNS20200520, Closed Public Meeting - Consideration for Resuming FOF Inspections + (ML20133K091)
- ML20133K093 + (ML20133K093)
- ML20133K106 + (ML20133K106)
- LR-N20-0027, Supplement to License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications + (ML20133K108)
- ML20133K109 + (ML20133K109)
- IR 05000528/2020001 + (ML20133K115)
- ML20133K121 + (ML20133K121)
- ML20133K127 + (ML20133K127)
- ML20133K128 + (ML20133K128)
- ML20133K131 + (ML20133K131)
- ML20133K132 + (ML20133K132)
- ML20133K133 + (ML20133K133)
- ML20133K142 + (ML20133K142)
- ML20133K147 + (ML20133K147)
- ML20133K148 + (ML20133K148)
- ML20133K149 + (ML20133K149)
- ML20133K152 + (ML20133K152)
- Press Release-20-026, NRC Seeks Comment on Proposed Rule for Emergency Preparedness for Small Modular Reactors and Other New Technologies + (ML20133K160)
- Press Release-II-20-015, NRC Schedules Virtual Meeting to Discuss 2019 Safety Performance of Vogtle Nuclear Power Plant Operating Units and Units Under Construction + (ML20133K161)
- ML20133K162 + (ML20133K162)
- ML20133K164 + (ML20133K164)
- ML20133K177 + (ML20133K177)
- ML20133K179 + (ML20133K179)
- PNO-I-85-080, on 851017,plant Tripped on Low Level Due to Loss of All Three turbine-driven Main Feed Pumps.Cause Unstated.Reactor Vessel Level Recovered by HPCI & RCIC Injection + (ML20133K180)
- ML20133K182 + (ML20133K182)
- ML20133K185 + (ML20133K185)
- ML20133K187 + (ML20133K187)
- ML20133K189 + (ML20133K189)
- ML20133K192 + (ML20133K192)
- ML20133K193 + (ML20133K193)
- ML20133K196 + (ML20133K196)
- ML20133K199 + (ML20133K199)