|
---|
Category:Exemption from NRC Requirements
MONTHYEARML23339A1342024-01-26026 January 2024 Exemption for Kewaunee Site Restoration ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML20345A2912020-12-16016 December 2020 Letter- Exemption from Annual Force-On-Force Exercise Requirement of Title 10 of the Code of Federal Regulations Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(I)(1) (EPID L-2020-LLE-0213 (COVID-19)) ML20287A4182020-11-13013 November 2020 Exemption from Certain Low-Level Waste Shipment Tracking Requirements of 10 CFR Part 20, Appendix G, Section Iii.E ML20261H5152020-11-10010 November 2020 U.S. Nuclear Regulatory Commission Updated Planned Actions Related to Certain Requirements for Operating and Decommissioning Reactor Licensees During the Coronavirus Disease 2019 Public Health Emergency ML20275A3372020-11-0505 November 2020 Enclosure 1: Safety Evaluation Report ML20140A1302020-05-20020 May 2020 Part 73 Exemption Letter_ 5-19-20 ML20133K1332020-05-0707 May 2020 Part 30-34 Covid Letter - Part 34 Table ML20133K1322020-05-0707 May 2020 Part 30-34 Covid Letter - Part 30 Table ML19197A0181982-11-0303 November 1982 Attachment to E-Mail from Spyle (Entergy) - Big Rock Point, Excess Property Damage Insurance Exemption, Date: 11/3/1982, Docket Nos. 72-43, 50-155, License No. DPR-6 2024-01-26
[Table view]Some use of "" in your query was not closed by a matching "". Category:Graphics incl Charts and Tables
MONTHYEARML24032A2202024-02-0101 February 2024 Licensing Applications Received in 2024 Year to Date ML24023A3152024-01-23023 January 2024 NRC & Agreement State Sunsetted Working Groups - Master List - January 2024 ML24023A3142024-01-15015 January 2024 NRC & Agreement State Working Groups - Master List Active January 2024 ML24008A1712024-01-0808 January 2024 Licensing Applications Received in 2024, Year to Date ML23345A0292023-12-11011 December 2023 Licensing Applications Received in 2023, Year to Date ML23310A3102023-11-0707 November 2023 2023 All Non-major Uranium Recovery, Decommissioning, and Federal Facility Material License Applications Received ML23159A0122023-06-0808 June 2023 Acu CA, No, SE, CR, Geo, Wm Info Needs Items Q3FY2023 ML20065H9422023-04-14014 April 2023 Heightened Oversight and Monitoring ML22018A2232022-03-10010 March 2022 Alphadart 35.10000 Consolidated Technical Analysis ML22200A2692022-02-0202 February 2022 5Q1.2-302, Rev. 31, Proceduradiation Monitoring - Water Sampling Analysis ML22012A3912022-01-11011 January 2022 Scoping and Screening 2.3.3.2 & 2.3.3.4 St. Lucie SLRA - Breakout Questions ML22012A2632022-01-10010 January 2022 Trp 3 - St. Lucie Psl SLRA Breakout Question Reactor Head Closure Stud Bolting ML21168A3582021-09-0909 September 2021 Proposed Technical Specifications (Appendix B) for CoC No. 1008, Renewed Amendment No. 1 ML21168A3572021-09-0909 September 2021 Proposed Technical Specifications (Appendix a) for CoC No. 1008, Renewed Amendment No. 1 ML21168A3552021-09-0909 September 2021 Proposed Technical Specifications (Appendix B) for CoC No. 1008, Renewed Amendment No. 0 ML21173A0792021-07-19019 July 2021 Final Burden Spreadsheet for Information Collection, 10 CFR Part 31, 2021 Renewal ML21195A3922021-07-14014 July 2021 Rims II Summary Table 2.5 Holtec CISF Application ML21246A1662021-07-0909 July 2021 Enclosure to Idaho State University License Renewal Application - Request for Supplemental Information ML21175A0492021-04-28028 April 2021 Rulemaking: Proposed Rule: Advanced Reactor Physical Security, Email from NRC to NEI NRC Comments on Nei'S Summary Table Showing Key Attributes for Eligibility Criteria ML21082A0732021-04-12012 April 2021 Enclosure - Cy 2020 Fuel Cycle Operating Experience Report ML21144A1222021-04-0808 April 2021 SYP-233-Reclassified ML21144A1202021-04-0808 April 2021 RA-432-Reclassified ML21144A1192021-04-0808 April 2021 RA-136-Reclassified ML21116A0412021-04-0101 April 2021 Current U.S. Independent Spent Fuel Storage Installation (ISFSI) Map as of April 22, 2021 ML21011A2632021-03-16016 March 2021 Supplemental Burden Spreadsheet for 10 CFR Part 31, (3150-0016) ML21077A0872021-03-15015 March 2021 Integrated Schedule of Regulatory Activities - March 2021 ML21077A0882021-03-15015 March 2021 Supplement to Integrated Schedule - March 2021 ML21077A0822021-03-0101 March 2021 Summary of Changes to Integrated Schedule - October 2020-March 2021 ML21005A3942020-12-15015 December 2020 NRC Materials Licenses: Standard License Conditions (January 2021) ML20307A1202020-11-10010 November 2020 Final Technical Specifications Appendix a and B for Magnastor Amendment 9 ML20307A1212020-11-10010 November 2020 Proposed Approved Contents for Magnastor Amendment No. 9 ML20315A2942020-11-0606 November 2020 Current U.S. Independent Spent Fuel Storage Installation (ISFSI) Map as of November 6, 2020 ML20293A4232020-10-21021 October 2020 Supplement to Fuel Cycle Program Integrated Schedule October 2020 - MARK-UP ML20293A4212020-10-21021 October 2020 Integrated Schedule of Regulatory Activities - October 2020 ML20293A4222020-10-21021 October 2020 Supplement to Fuel Cycle Program Integrated Schedule October 2020 ML20192A0942020-09-29029 September 2020 OMB 3150-0009, Part 70 Burden Tables ML20233B1452020-08-18018 August 2020 Rev 2 Public Medical Licensee Temporary Exemptions Table During COVID-19 Phe. Updated August 2020 ML20205L3962020-07-28028 July 2020 July 28, 2020, NEI Presentation on Industry Understanding of Proposal on Shielding ML20205L3952020-07-28028 July 2020 July 28, 2020, NEI Presentation on Risk Tool on Spent Fuel Dry Storage ML20174A5542020-07-28028 July 2020 Draft Technical Specifications Appendix B for Magnastor Amendment 9 ML20174A5532020-07-28028 July 2020 Draft Technical Specifications Appendix a for Magnastor Amendment 9 ML20197A3012020-07-21021 July 2020 Enclosure 4: Summary Table for June 23, 2020, Public Workshop on Spent Fuel Performance Margins ML20198M3882020-07-0909 July 2020 Cumulative Effects of Regulation - Updates to Integrated Schedule Chart - July 2020 ML20294A0592020-07-0101 July 2020 Summary of Changes to Integrated Schedule Chart July-October 2020 ML20133K1322020-05-0707 May 2020 Part 30-34 Covid Letter - Part 30 Table ML20133K1332020-05-0707 May 2020 Part 30-34 Covid Letter - Part 34 Table ML20112F1522020-04-21021 April 2020 Supplement to Fuel Cycle Program Integrated Schedule - April 2020 ML20105A3742020-04-14014 April 2020 Fuel Cycle Integrated Schedule of Regulatory Activities ML20104A9312020-04-13013 April 2020 August 2003 - Pilot Project 5 Work Product Plan ML19241A3782020-02-29029 February 2020 Final Environmental Assessment for Rancho Seco Independent Spent Fuel Storage Installation 2024-02-01
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
Industrial Radiography Licensee Temporary Exemptions During the COVID-19 Public Health Emergency 05/07/2020 This table provides a list of 10 CFR Part 34 requirements for the which the NRC may consider expedited requests for temporary exemption. Licensees may seek a temporary exemption from these requirements to address the challenges licensees may face during the COVID-19 Public Health Emergency (PHE). This table may be updated as the NRC identifies additional requirements for which the NRC may consider expedited requests for temporary exemption.
Reg. Description of Exemption Subpart C - Equipment 34.25(b)(1) The requirement in 10 CFR 34.25(b)(1) that the licensee shall have each radiation survey instrument required in 10 CFR 34.25(a) calibrated at intervals not to exceed 6 months.
34.27(c)(1) The requirement in 10 CFR 34.27(c)(1) that the licensee test sealed sources for leakage at intervals not to exceed 6 months.
34.27(e) The requirement in 10 CFR 34.27(e) that the licensee test each exposure device using depleted uranium (DU) shielding and an S tube configuration for DU contamination at intervals not to exceed 12 months.
34.29(a) The requirement in 10 CFR 34.29(a) that the licensee conduct a quarterly inventory to account for all sealed sources and for devices containing depleted uranium.
Subpart D - Radiation Safety Requirements 34.43(d) The requirement in 10 CFR 34.43(d) that licensees provide annual refresher safety training for each radiographer and radiographer assistant at intervals not to exceed 12 months.
34.43(e) The requirement in 10 CFR 34.43(e)(1) that the licensees radiation safety officer or designee observe the performance of each radiographer and radiographer assistant during actual industrial radiographic operation, at intervals not to exceed 6 months.