ML20133K132

From kanterella
Jump to navigation Jump to search
Part 30-34 Covid Letter - Part 30 Table
ML20133K132
Person / Time
Issue date: 05/07/2020
From:
Office of Nuclear Material Safety and Safeguards
To:
L. Rakovan, NMSS/MSST
References
Download: ML20133K132 (1)


Text

Material Licensee Temporary Exemptions During the COVID-19 Public Health Emergency 05/07/2020 This table provides a list of 10 CFR Part 30 requirements for the which the NRC may consider expedited requests for temporary exemption. Licensees may seek a temporary exemption from these requirements to address the challenges licensees may face during the COVID-19 Public Health Emergency (PHE). This table may be updated as the NRC identifies additional requirements for which the NRC may consider expedited requests for temporary exemption.

Reg.

Description of Exemption 10 CFR 30.34 Terms and conditions of licenses 30.34 The license condition requiring that a physical inventory be performed every 6 months 30.34 The requirement in License Condition [number] to perform leak testing every [X]

months or at the frequency specified in the SSD Note: The leak testing requirements specified in the SSD range from 6 months to 3 years.

30.34 The requirement in License Condition [number] to perform surveys 30.34 The requirement in License Condition [number] to exchange dosimetry 30.34 The requirement in License Condition [number] to provide radiation safety refresher training at intervals not to exceed 12 months 30.34 The requirement in License Condition [number] to perform instrument calibration 30.34 The requirement in License Condition [number] to hold Radiation Safety Committee meetings at intervals not to exceed [X] months 30.34 The requirement in License Condition [number] to complete an annual program review at intervals not to exceed 12 months