Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132E438 + (ML20132E438)
- ML20132E439 + (ML20132E439)
- ML20132E440 + (ML20132E440)
- AECM-85-0166, Responds to NRC Re Violations Noted in Insp Rept 50-416/85-09.Corrective Actions:Surveillance Procedures, ESF 125-Volt Battery Bank Svc Discharge Test & Battery Capacity Discharge Test, Revised + (ML20132E441)
- ML20132E444 + (ML20132E444)
- ML20132E445 + (ML20132E445)
- ML20132E447 + (ML20132E447)
- ML20132E453 + (ML20132E453)
- ML20132E456 + (ML20132E456)
- ML20132E458 + (ML20132E458)
- ML20132E461 + (ML20132E461)
- ML20132E462 + (ML20132E462)
- ML20132E463 + (ML20132E463)
- ML20132E467 + (ML20132E467)
- ML20132E468 + (ML20132E468)
- ML20132E469 + (ML20132E469)
- ML20132E471 + (ML20132E471)
- ML20132E473 + (ML20132E473)
- ML20132E475 + (ML20132E475)
- ST-HL-AE-1368, Second Interim Deficiency Rept Re Unanalyzed Seismic Interactions.Initially Reported on 850508.Review Project Continuing.Next Rept Will Be Submitted by 851115 + (ML20132E477)
- ML20132E480 + (ML20132E480)
- ML20132E482 + (ML20132E482)
- ML20132E483 + (ML20132E483)
- ML20132E484 + (ML20132E484)
- ML20132E487 + (ML20132E487)
- ML20132E488 + (ML20132E488)
- ML20132E489 + (ML20132E489)
- ML20132E494 + (ML20132E494)
- 3F0985-19, Responds to Generic Ltr 85-06 Re QA Guidance for ATWS nonsafety-related Equipment.Util Will Install Equipment Per Design Requirements for Diverse Scram Sys & Atws.... Document Will Be Submitted by 851001 + (ML20132E495)
- ML20132E496 + (ML20132E496)
- ML20132E497 + (ML20132E497)
- ML20132E498 + (ML20132E498)
- ML20132E499 + (ML20132E499)
- ML20132E501 + (ML20132E501)
- ML20132E502 + (ML20132E502)
- ML20132E503 + (ML20132E503)
- ML20132E505 + (ML20132E505)
- B11625, Advises That Util Plans to Implement Encl Curves, Representing Planned Means for Compliance w/10CFR50,App G Between 14.0 & 22.0 EFPY When Current Curves for Heatup & Cooldown Become Valid at 14.0 EFPY + (ML20132E509)
- ML20132E511 + (ML20132E511)
- ML20132E514 + (ML20132E514)
- ML20132E515 + (ML20132E515)
- ML20132E516 + (ML20132E516)
- ML20132E517 + (ML20132E517)
- ML20132E520 + (ML20132E520)
- ML20132E521 + (ML20132E521)
- ML20132E522 + (ML20132E522)
- IR 05000409/1985008 + (ML20132E525)
- ML20132E526 + (ML20132E526)
- ML20132E527 + (ML20132E527)
- BECO-LTR-96-104, Forwards Supplemental Pages to Proposed Amend to Standby Liquid Control/Rps/Rod Block Tech Spec + (ML20132E529)
- ML20132E530 + (ML20132E530)