Forwards Insp Repts 50-456/85-22 & 50-457/85-23 on 850429-0503.No Noncompliance Noted
ML20132E517
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/17/1985
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20132E520 List:
References
NUDOCS 8508020010
Download: ML20132E517 (2)


See also: IR 05000429/2005003

Text

.

N;

attip UNITED STATES

[g NUCLEAR REGULATORY COMMISSION

g $ < REGION 818

5 ~j 799 ROOSEVELT ROAD

o g CLEN ELLYN, ILUNO15 601 H

G1f 1 7 585

-

Docket No. 50-456

Docket No. 50-457

Comonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

This refers to the routine safety inspection conducted by Mr. A. A. Varela

of the NRC Region I office on April 29 through May 3, 1985, of activities

at Braidwood Station, authorized by NRC Construction Permits No. CPPR-132

and No. CPPR-133 and to the discussion of our findings with Mr. M. Wallace

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. S. Little, Director

Braidwood Project

Enclosure: Inspection Report

No. 50-456/85022 DRP ;

No. 50-457/85023 DRP

See Attached List For Distribution

8500020010 850717

PDR ADOCK 05000456

G PDR

.

ixa.

. _ _ _ _ -

e

.c

,

-Commonwealth Edison Company

'

2

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

J. F. Gudac, Plant Manager

C. W. Schroeder, Licensing and

Compliance Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

A. A. Varela, NRC, RI

E. Chan, ELD

J. Stevens, NRR

.