ML20132E494

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-341/85-29 on 850601-30.No Violation Noted.Response to Unresolved Items Re Failure to Follow Procedures During Reactor Water Cleanup Pump a Maint & Program for safety-related Valves Required
ML20132E494
Person / Time
Site: Fermi 
Issue date: 07/29/1985
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jens W
DETROIT EDISON CO.
Shared Package
ML20132E498 List:
References
CON-#288-6002 2.206, NUDOCS 8508020002
Download: ML20132E494 (2)


See also: IR 05000341/1985029

Text

. _.-

.

,

O

9.P

.

.

3UL 291985

i

.

0

Docket No. 50-341

,

i

The Detroit Edison Company

A'ITN: Wayne H. Jens

Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. P. M. Byron,

M. E. Parker, D. C. Jones, and R. A. Paul of this office on June 1-30, 1985,

of activities at Fermi 2 authorized by Facility Operating License No. NPF-33

.

and to the discussion of our findings with R. S. Lenart at the conclusion of

the inspection.

1

.

The enclosed copy of our inspection report identifies areas examined during

'

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

,

J

interviews with personnel.

No violations with NRC requirements were identified during the course of.this

inspection,

'

j

Although no violations of NRC requirements were identified during this

'

inspection, we do request that you respond to the unresolved item identified

in the enclosed report. This item is related to your maintenance activities

,

'

and specifically involves the failure to follow procedures during Reactor

Water Cleanup pump "A" maintenance. We believe this issue is significant and

warrants particular attention. Your response is requested within thirty days

of receipt of this letter.

Additionally, we request that you respond to the unresolved item concerning

the program developed to address the serviceability of safety-related valves.

Your response on this issue is also requested within thirty days of receipt of

this letter.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

1

8508020002 850729

PDR

ADOCK 05000341

a

PDR

,

th'\\

.-

,

t

The Detroit Edison Company

2

2 9 1985

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

l

&fYfliT55ft$ bf$ebek50lb5h

1

Charles E. Norelius, Director

Division of Reactor Projects

Enclosure:

Inspection Report

No. 50-341/85029(DRP)

cc w/ enclosure:

L. P. Bregni, Licensing

Engineer

i

P. A. Marquardt, Corporate

Legal Department

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Harry H. Voigt, Esq.

.

Nuclear Facilities and

Environmental Monitoring

Section

R II

RIII

.

RIII[

W

Ch

otimos

Noreli

I

{ 4 ri ht/rr

f

07/24/85

.

- __.

. . - -