ML20132E473
| ML20132E473 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/23/1985 |
| From: | Standerfer F GENERAL PUBLIC UTILITIES CORP. |
| To: | Snyder B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20132E475 | List: |
| References | |
| 0320A, 320A, 4410-85-L-0186, 4410-85-L-186, NUDOCS 8510010094 | |
| Download: ML20132E473 (1) | |
Text
-
ENuclear EurenMer""
Route 441 South Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
(717) 948-8461 4410-85-L-0186 Docunent ID 0320A September 23, 1985 TMI Program Office Attn: Dr. B. J. Snyder Program Director US Nuclear Regulatory Commission Washington, DC 20555
Dear Dr. Snyder:
Three Mile Island Nuclear Station, Unit 2 (TMI-2)
Operating License No. DPR-73 Docket No. 50-320 TMI-2 Recovery Program Estimate Attached for your information is a copy of the TMI-2 Recovery Program Estimate, Revision 3, dated August 30, 1985.
This estimate concludes that the total program cost and schedule has not changed significantly from either Case I of the "TMI-2 Recovery Program Estimate, Revision 2", dated December 30, 1982 or the "TMI-2 Defueling Study", dated August 1984. Activities to defuel the reactor vessel and associated systems, to remove or immobilize radioactive materials, and to place the plant in a safe, interim, monitored storage condition will be completed in September 1988 at a total program cost (1979-1988) of
$965,000,000.
This estimate is based on a much more complete understanding of the work scope than was available in 1982 and gives further confidence in the program schedule and cost estimate.
Sincerely, 8510010094 850923 DR ADOCK 050 0
. R. Standerfer Vice President / Director, TMI-2 FRS/JJB/eml
('
Attachment cc: Deputy Program Director - TMI Program Office, Dr. W. D. Travers l
leN dorpo fibili 'a sfd$ary of the General Public Utilities Corporation G