ML20132E462
| ML20132E462 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/24/1985 |
| From: | Edgeworth P, Moonan W NRC OFFICE OF ADMINISTRATION (ADM), TELEDYNE ENGINEERING SERVICES |
| To: | |
| Shared Package | |
| ML20132E414 | List: |
| References | |
| CON-FIN-D-1338, CON-NRC-03-85-067, CON-NRC-3-85-67 NUDOCS 8510010092 | |
| Download: ML20132E462 (4) | |
Text
-
g
- 1. LU+11 H AL ) 4 0 LOOL P AG g_
ge RAGES AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT I
- 2. A8dENOMENT/wCO4F eCAt EON No.
- 3. EF F ECT 4%rE DAl e.
.. REQutSt1 SON /PU64 CHASE $4EQ. NO.
S. P840Ji C T NO ggf. ppg,,.64,)
,.Two (2) 9/20/85
.RFPA No. NRR-85-067 (s.155ULO ev.
l F. ADMINIST E HED tlY (1, other en.. dre di j
US Nuclear Regulatory Coninission Division of Contracts Washington, DC 20555
- s. N AME. ANO ADDRESS OF CONT R AC1O R (No., stre,e, co..ry, a s.te..d 24P CodeJ g
9A. AMENowENT OF 50LtceT AT TON NO.
Teledyne Engineering Services Attn: Mr. James Flaherty, Vice President 130 Second Avenue em o^T w <sse s2*u s,,
Waltham, MA 00254 10A.
OOsF 8 CATION OF CONTR ACT/OROLH X
NRC-03-85-067 3 6. DATED (SEE iTEN 23) cOcc IF AcitiTY cOoE 9/9/85
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS.OF SOLICITATIONS
~
The abo =e numbered sosichst6an is amended as est forth 6ts stem 14. The hour end date specified for rocsipt of Offer Is estended.
6s not es.
tended.
ONoremiust acknoweedge vuosiot of thes amendment prior to the hour and deto specffied en the so46dtetton or es amended, by one of the following methods:
(el By conweting items 4 and 16.and retsmine copees of the amendment; (b) By actnoweedgin0 voceipt of this amendment on endi copy of the offer submitted; or (c) By esperate letter or teeegram wohich includes e reference to the solicitetson and omendment numbers. F ALLURE OF YOUR ACKNOWLEDG.
MENT TO BE RECEtVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED BAAY RESULT 8N REJECTION OF -YOUR OFFER. ff by vertue of this amendment you desire to change en offer streedy submitted, such change may be made by telegram or letter, provided each tooegram or let,ar me6es reference to the solicitetson and this amendment,and is focsived prior to the opening hour and date specified.
- 12. ACCoutvTING AND APPRODRI ATiON DAT A (lf.vg. dred)
RAD Nn. 7n-14-4n-41-1 Fin. N'o.
D-1338 INCREASE:
$ 100,000
- 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS.
IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.
^~ ECTTRTE R NON N OIN "*"^"' ' ' ""## ** **y, '"' '"^""' "T '
" ' " ' " ' ' ' " * * * " ' " ^ ' ' " ' " ' ' " "
O t
eJ5 O
H t TE
- 4. P R5 A T TH UTH R TY 4 103 0.
C. THe5 5b?PLEMENT AL AGREEMENT e5 ENTEf4EO ENTO Puf45,uANT TO AUTHOR 4T V OFs O. OT HE R ($petely type e,,enodstw.te..
d..thoretyp X
Mutual Aoreement of Parties E. IMPORTANT: Contractor is not, b is required to sign this document and return 3
Copies to the issuing office.
- 14. Oc5CRieTsoM of AwENOuCNT/wCOiF eCAT eoM tore 4,,4 6, UCr.,,,
A,.ds.,.. #.ca.dio,.e44 css.es fc n er.,e..es.ce seer =A.,.
f, 4w,.s The purpose of this mo'dification is to revise the Statement of Work to include task "d", which involves independent inspection, witness of tests and modifications and audits in connection with the above-numbered contract.
Accordingly, the Commission accepts Teledyne Engineering Services' technical and cost proposal dated, September 17, 1985, which is incorporated into this contract by this reference to perform the efforts as described therein.
Therefore, the above-numbered contract is modified as follows:
8510010092 850924 N-03 5-067 PDR (Continued Next Page) g,e,.,,.
- e. -... e.. t
. e...
. e. t
.t in n.~ loa. es
..e,s.....em.i...<a.
.a. in voi..m o ISA. NAME AND T eT LE OF SsGNER (Type ee prf.tj 16A. NAME AND TIT LE OF CONT R ACTING OF F4CER (Type or p.t.fj wa.uer s aaws Pa4J.Edgeworth pm po:rutur / &vMauc
_. c.
1 $8. CON T R ACTO R/OF F E RO R S SC. OATE 58GNEO 368.
Nt 5 AT 5 MERtCA 16C. O TE 5eGNED f/ &
.,,A W}
9 3 /75 BY /
vt
<..e.,nr
..,,.....O,,w..,
//
.1Ah0ARo,0,po,/C....
v
.NSN,T,..... m.,,.....
m.,
RE 0N ON.5A.a
.w Modification No. Two (2) NRC-03-85-067 I.
1.
Section B - Supplies or Services and Prices / Costs, is revised.as follows:
B.1. Brief Descripti6n of Work, is revised to include the following:
"The contractor shall provide the services required to evaluate the inplementation of the TUGC0 Comanche Peak Program Plan" 8.2.
A., is deleted in its entirety and the following is substituted in lieu thereof:
"A.
Total Estimated Cost
$ 411,871 Fixed Fee
$ 41,186 Total Estimated Cost Plus Fixed Fee
$ 453,057 2.
Section C - Description / Specifications / Work Statement, is revised as follows:
C.I.2., entitled, Scope of Work, is revised to add the following paragraph:
"4.
Conduct an audit of the disposition of deficiencies that require modification to piping, pipe support, cable trays designs, installation or both to determine whether the cause of the problem has been satisfactorily resolved and ensure that similar def!ciencies will not reoccur in the future at CPSES, Units 1 and 2.
C..l.3., entitled, Schedule and Level of Effort, is revised to include the following:
Add:
" Task 4-Estimated Level of Effort, FY 85 12.1 staff months Completion Date
?9ecember 31,~1985 C.2., entitled, Meetings and Travel is deleted in its entirety and the following is substituted.in lieu thereof:
"C.2 - Meetings and Travel 1.
Glen Rose, Texas - 2 trips, 5 people for 4 days 4 trips, 5 peple for 5 days t
ModificatiodNo.Two(2) NRC-03-85-067 I
2.
Bethesda, Maryland - 8 trips, 3 people for 3 days 5 trips,1 person for 1. day, 3.
Champaign, Illinois - 2 trips,' 2 people for 2 days 4.
New York - 3 trips, 4 people for 3 days 5.
Cedar Rapids, Iowa tosBethesda 3 trips,1 pers'on for 5 days 6.
Cedar Rapids, Iowa to San Francisco - 1 trip,1 person for 5 days" 3.
Section F - Deliveries and Performance, F.1., entitled, Reporting
_ Requirements is revised to include the following:
"2.
Prior to initiation of task d, the contractor shall provide to the NRC Project Officer a plan for it, including details on sample sizes, and methodology of review'or audit.
Upon approval of each plan by the by the Project Officer, work will coninence.
A monthly report shall be provided to the NRC Project Officer which suninarizes major efforts and significant findings associated with task d.
Upon completion of task d, a Technical Evaluation Report will be provided to the Project Officer which sununarizes the technical effort and all findings.
The Technical Evaluation Report shall be delivered on or prior to December 31, 1985.
4.
Section F.3., entitiled, Duration of Contract Period, is deleted in its e.tirety and the following is substituted in lieu thereof:
" F.3. Duration of Contract Period This contract shall become effective on June 10, 1985 and shall continue to completion thereof, on December 31, 1985."
5.
Section G - Contract Administration Data, Item G.l., entitled, Consideration,
- Estimated Cost, Fixed Fee and Obligation, the following changes are made:
Paragraph 1 - Delete:
"$241,236.00" Insert:
"$453,057.00" Delete:
"$219,306.00" Insert:
"$411,871. 00" Delete:
"$ 21,930.00" Insert:
"$ 41,186.00"
+-
, Modification No. Two (2) NRC-03-85-067 Continued:
Section G.l., entitled Consideration, Estimated Cost, Fixed Fee and Obligation, is revised as follows:
Paragraph 3, is deleted in its entirety and the following is ' substituted in lieu thereof:
"3.
The amount presently obligated by the Government with respect to.
this contract is $341,236.00.
It is anticipated that present funding will enable the contractor to perform through November 15, 1985. The remaining funds will be obligated subject to the availability of FY '86 funds."
All other terms and conditions set forth under this contract remain unchanged.