Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128E972 + (ML20128E972)
- ML20128E974 + (ML20128E974)
- ML20128E976 + (ML20128E976)
- ML20128E978 + (ML20128E978)
- ML20128E981 + (ML20128E981)
- ML20128E983 + (ML20128E983)
- PLA-3913, Advises That Ds Hays (Operator License OP-10759) Tentatively Accepted & Currently Performing Duties Associated W/Another Position within Util Which Does Not Require Reactor Operator License.Hays Will Not Maintain License + (ML20128E984)
- ML20128E988 + (ML20128E988)
- ML20128E989 + (ML20128E989)
- SNRC-1184, Forwards Clarified Responses to Generic Ltr 83-28,Items 2.1.1,2.2.2,4.5.1,4.5.2 & 4.5.3,in Response to NRC .Encl Responses Address Reactor Trip sys,safety-related Equipment,Functional Testing & Testing Intervals + (ML20128E992)
- ML20128E994 + (ML20128E994)
- 05000341/LER-1993-001, :on 930104,HPCI Turbine Exhaust/Exhaust Drain Valve Did Not Fully Open.Caused by Coil in HPCI Turbine Exhaust Valve Open Relay Deenergized.Relay Replaced & Retested to Ensure Proper Function + (ML20128E995)
- ML20128E997 + (ML20128E997)
- ML20128E998 + (ML20128E998)
- ML20128E999 + (ML20128E999)
- ML20128F000 + (ML20128F000)
- 05000282/LER-1993-001-01, On 930105,discovered That Surveillance of Hydrogen Recombiners Did Not Meet TS 4.4.I Requirement That Require Functional Test Every 6 Months.Caused by Procedure Inadequacy.Surveillance Testing Performed + (ML20128F003)
- 05000322/LER-1985-021, :on 850615,bomb Threat Received Over 911 Telephone Number from Unidentified Individual Stating Device Placed in Containment Bldg.Security Alert Declared & Site Evacuated.No Explosive Device Found + (ML20128F004)
- IR 05000348/1993003 + (ML20128F005)
- ML20128F006 + (ML20128F006)
- AECM-85-0168, Forwards Application for Amend to License NPF-29,changing Tech Spec Table 3.3.7.9-1 to Add Four Smoke Detectors in Area 1A12.Fee Paid + (ML20128F008)
- ML20128F009 + (ML20128F009)
- ML20128F010 + (ML20128F010)
- ML20128F013 + (ML20128F013)
- 2CAN029301, Forwards Addl Info Re NRC Review of Generic Ltr 90-06, Resolution of Generic Issue 70, Power-Operated Relief Valve & Block Valve Reliability & Generic Issue 94, Addl Lwop for Lwrs + (ML20128F015)
- ML20128F017 + (ML20128F017)
- ML20128F018 + (ML20128F018)
- ML20128F022 + (ML20128F022)
- ML20128F023 + (ML20128F023)
- ML20128F025 + (ML20128F025)
- ML20128F032 + (ML20128F032)
- IR 05000272/1985009 + (ML20128F033)
- HBL-93-005, Forwards Public Version of Rev 2 to Emergency Plan.Vol 3,Rev 20 Appears at Top of Each Page of Rev to Reflect Incorporation of Emergency Plan Into Hbpp Plant Manuals & Current Sys for Maint of Manuals.W/930202 Release Memo + (ML20128F034)
- ML20128F035 + (ML20128F035)
- ML20128F041 + (ML20128F041)
- ML20128F042 + (ML20128F042)
- ML20128F045 + (ML20128F045)
- ML20128F046 + (ML20128F046)
- ML20128F047 + (ML20128F047)
- ML20128F050 + (ML20128F050)
- ML20128F051 + (ML20128F051)
- ML20128F052 + (ML20128F052)
- ML20128F053 + (ML20128F053)
- ML20128F056 + (ML20128F056)
- ML20128F057 + (ML20128F057)
- ML20128F059 + (ML20128F059)
- PNO-I-85-037A, on 850523,reactor Shutdown Initiated Due to Lubricating Oil Circulation Pump Motor Tripping on Diesel Generator B.Generator Declared Inoperable.Shutdown Will Be Terminated After Oil Circulation Pump Motor Replaced + (ML20128F060)
- ML20128F062 + (ML20128F062)
- ML20128F064 + (ML20128F064)
- ML20128F065 + (ML20128F065)
- ML20128F066 + (ML20128F066)