Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127L504 + (ML20127L504)
- ML20127L506 + (ML20127L506)
- ML20127L507 + (ML20127L507)
- PNO-III-85-049A, on 850621,special Insp Performed to Review Circumstances Re Radiography Source Disconnect on 850617. Source Not Retracted to Fully Shielded Position within Exposure Device.Blood Sample Submitted for Chromosome Study + (ML20127L508)
- ML20127L509 + (ML20127L509)
- ML20127L510 + (ML20127L510)
- ML20127L512 + (ML20127L512)
- ML20127L513 + (ML20127L513)
- ML20127L514 + (ML20127L514)
- ML20127L515 + (ML20127L515)
- ML20127L516 + (ML20127L516)
- 05000440/LER-1992-020, :on 921023,inadequate Reset of Containment Air Lock Door Discovered Resulting in TS Violations.Caused by Drawing Discrepancy.Piping Sys Diagram Being Revised to Properly Identify Pressure Switches + (ML20127L517)
- JPN-93-001, Forwards Rev 6 to FitzPatrick Second Interval IST Program. Rev Contains Changes Which Address Six Open Relief Requests or Anomalies Noted in NRC SE for Rev 5 of program.W/27 Oversize Drawings + (ML20127L518)
- ML20127L520 + (ML20127L520)
- BECO-85-114, Application for Amend to License DPR-35,consisting of Proposed Change 85-08,revising Tech Spec Sections Re Primary Containment & Primary Containment Tests,In Accordance w/10CFR50,App J + (ML20127L521)
- ML20127L525 + (ML20127L525)
- ML20127L526 + (ML20127L526)
- ML20127L527 + (ML20127L527)
- ML20127L528 + (ML20127L528)
- ML20127L529 + (ML20127L529)
- ML20127L530 + (ML20127L530)
- ML20127L531 + (ML20127L531)
- 05000219/LER-1993-001, :on 930101,offsite Power Line Failed.Caused by Lightning Arrestor Failure.Circuit Breaker Manually Opened to Prevent More Power Perturbations Until Arrestor Could Be Repaired + (ML20127L532)
- IR 05000029/1985008 + (ML20127L533)
- ML20127L534 + (ML20127L534)
- ML20127L535 + (ML20127L535)
- ML20127L536 + (ML20127L536)
- 05000334/LER-1992-011-01, :on 921021,discovered Use of Unqualified Relay in Small Break LOCA Analysis.Caused by Failure to Recognize Impact of Unqualified Undervoltage Relays on Small Break Loca.Design Change Implemented + (ML20127L537)
- ML20127L538 + (ML20127L538)
- ML20127L539 + (ML20127L539)
- ML20127L540 + (ML20127L540)
- 05000333/LER-1992-027, :on 920516,CS Isolation Testable Check Valve 14A0V-13A Exhibited Seat Leakage in Excess of TS Limit Due to Misalignment by One Bolt Hole.Valve Bonnet Correctly Aligned W/Valve Body + (ML20127L543)
- ML20127L544 + (ML20127L544)
- ET-NRC-93-3797, Forwards Responses to NRC 920622 Request for Addl Info Related to AP600 Containment Design,Rcs Design & Details on 1/8 Scale Containment Test Facility.Responses Withheld. Proprietary Portion of Document Sent to Westinghouse + (ML20127L546)
- IR 05000261/1985019 + (ML20127L547)
- ML20127L549 + (ML20127L549)
- ML20127L550 + (ML20127L550)
- ML20127L551 + (ML20127L551)
- ML20127L552 + (ML20127L552)
- ML20127L553 + (ML20127L553)
- ML20127L554 + (ML20127L554)
- ML20127L555 + (ML20127L555)
- 05000334/LER-1992-010-01, :on 921019,while Restoring Motor Operated valves,WR-P-1A auto-started & Immediately Shutdown.Caused by Low Sys Pressure.Maint Work Request Initiated to Check Transmitter Calibr + (ML20127L556)
- ML20127L558 + (ML20127L558)
- ML20127L559 + (ML20127L559)
- ML20127L560 + (ML20127L560)
- ML20127L561 + (ML20127L561)
- ML20127L562 + (ML20127L562)
- ML20127L563 + (ML20127L563)
- ML20127L565 + (ML20127L565)
- ML20127L567 + (ML20127L567)