Confirms 921020 Telcon Re Potential Concern W/Shipment of Thermo-Lag Preshaped Conduit Sections to Util.Conduit Sections Did Not Exhibit Voids When Shipped from Vendor Plant.Rept & Remedial Action Will Be Submitted in 45 Days
ML20127L504
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/07/1992
From: Feldman R
THERMAL SCIENCE, INC.
To: Miraglia F
Office of Nuclear Reactor Regulation
Shared Package
ML20127F509 List:
References
NUDOCS 9211240336
Download: ML20127L504 (2)


Text

4 ENCLOSURE 2

~

7 November 1992 HUBIN FELDMAN. P.E.

1"98>0e rif Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852 Attention: Mr. Frank J. Miraglia Deputy Director Office of Nuclear Reactor Regulation

Dear Mr. Miraglia:

The following is in confirmation of our telephone conference of Tuesday, October 20,1992.

I reported an item of potential concern relating to a recent shipment of THERMO-LAG Preshaped Conduit Sections (0.625 +/- 0.125" thickness) to Texas Utilities Electric Company.

On October 18,1992, Thermal Science met with Texas Utilities personnel in St. Louis to discuss this matter. During an onsite cutting operation of Preshaped Conduit Sections for field installation, an inner strata delamination which included voids running the length of the 3 foot conduit section, was observed. It was verbally reported that as of that date several sections, out of approximately 2000 plus shipped to that date, exhibited a similar phenomenon.

The conduit sections did not exhibit this phenomenon when shipped from our plant in St. Louis. This is based on quality control testing and verification of all products prior to shipment, conducted by both TSI and TU's quality control personnel. TU quality control personnel have been onsite at Thermal Science since the onset of the 1992 procurement.

We immediately commenced an examination of the possible cauas of this discrepancy and remedial action that may be appropriate. We are examining the matter thoroughly and our findings at this early stage are indeterminate.

p~

aF $

/' *"

,/

g ) 0 Ob b'

' THERMAL SCIENCEJNC.'N200 CASSENS DR. . ST. LOUIS, MO 63026 (314) 3491233 44 2384 Overseas 209901

  • Telecopier (314) 349-1207

/

/ TelekfDomestic

Mr. Frank J. Miraglit 7 November 1993

, Nuclear Regulatory Commission Page 2 A report on our examination, including remedial action, is presently targeted for completion within 45 days and will be sent to both Texas Utilities and the NRC.

We will keep you informed.

Yours tmly, O E

. ,jh' Rubin Feldman President RF/ mis e