Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000285/1985002 + (ML20127L455)
- 05000412/LER-1992-013, :on 931223,identified SG Blowdown Isolation Due to SG Blowdown Tank High Level.Sg Blowdown Sys Demineralizer Outlet Filter Cleaned + (ML20127L456)
- ML20127L457 + (ML20127L457)
- ML20127L458 + (ML20127L458)
- ML20127L459 + (ML20127L459)
- ML20127L460 + (ML20127L460)
- ML20127L461 + (ML20127L461)
- ML20127L462 + (ML20127L462)
- 05000443/LER-1992-013-01, Forwards LER 92-013-01 Re Tornado Design of Plant Doors. Submittal Documents Root Cause & Corrective Actions Ongoing at Time of LER 92-013-00 Submittal + (ML20127L463)
- BSEP-92-0063, Responds to Request for Addl Info Re Hotside & Coldside Walkdowns & Mgt Actions Re Documented Instruction or Procedure in Connection W/Previous Response to NOV Re Insp Repts 50-324/92-27 & 50-325/92-27 + (ML20127L464)
- ML20127L465 + (ML20127L465)
- ML20127L466 + (ML20127L466)
- ML20127L467 + (ML20127L467)
- ML20127L468 + (ML20127L468)
- ML20127L469 + (ML20127L469)
- 05000443/LER-1992-013, :on 920827,determined That Six Plant Doors Did Not Have Tornado Design to Withstand Differential Pressure, Per Updated Fsar.Caused by Failure to Include Doors in United Engineers & Constructors Spec.Updated FSAR Revised + (ML20127L470)
- ML20127L471 + (ML20127L471)
- ML20127L472 + (ML20127L472)
- ML20127L473 + (ML20127L473)
- 05000423/LER-1992-024-01, :on 921015,ESF Bldg Normal Ventilation Radiation Monitor Declared Inoperable & Temporary Sample Rig Installed.On 921015 & 16,breaker Tripped Open.Caused by Inadequate Installation.Breaker Reset + (ML20127L475)
- ML20127L478 + (ML20127L478)
- 05000354/LER-1992-012-02, :on 921017,RM Skid Declared Inoperable Due to Low Sample Flow Indication on Particulate,Iodine & Noble Gas Monitor Portion of Skid.Caused by Design Deficiency.Design Review of RMS Skid Will Be Performed + (ML20127L479)
- 3F0193-08, Responds to NRC Ltr Re Weaknesses Noted in Insp Rept 50-302/92-26.Corrective Action:Lesson Plan for Emergency Coordinator Training Has Been Revised to Include Review of 1992 Exercise Deficiencies + (ML20127L480)
- ML20127L481 + (ML20127L481)
- ML20127L482 + (ML20127L482)
- 05000445/LER-1992-024, :on 921022,determined That Surveillance for Containment post-accident Water Level Instrumentation Did Not Include Check of Level Sensors.Caused by Personnel Error.Vendor Manual Will Be Amended + (ML20127L483)
- ML20127L484 + (ML20127L484)
- ML20127L486 + (ML20127L486)
- ML20127L487 + (ML20127L487)
- ML20127L489 + (ML20127L489)
- 05000368/LER-1992-007, :on 920923,discovered That Flow Rates Through HPSI Legs Unbalanced & Below Min TS Value.Caused by Vendor (Target Rock) Error.Eight Stock Disc Plus Reworked & Refurbished Discs Installed in HPSI Valves + (ML20127L490)
- ML20127L491 + (ML20127L491)
- ELV-05102, Forwards Responses to NRC 921203 RAI Re Util 920917 License Amend Request Associated W/Implementation of New 10CFR20 Requirements & Revised Proposed TS Associated W/Responses + (ML20127L492)
- ML20127L493 + (ML20127L493)
- ML20127L494 + (ML20127L494)
- ML20127L495 + (ML20127L495)
- ML20127L496 + (ML20127L496)
- ML20127L497 + (ML20127L497)
- ML20127L498 + (ML20127L498)
- ML20127L501 + (ML20127L501)
- ML20127L502 + (ML20127L502)
- ML20127L504 + (ML20127L504)
- ML20127L506 + (ML20127L506)
- ML20127L507 + (ML20127L507)
- PNO-III-85-049A, on 850621,special Insp Performed to Review Circumstances Re Radiography Source Disconnect on 850617. Source Not Retracted to Fully Shielded Position within Exposure Device.Blood Sample Submitted for Chromosome Study + (ML20127L508)
- ML20127L509 + (ML20127L509)
- ML20127L510 + (ML20127L510)
- ML20127L512 + (ML20127L512)
- ML20127L513 + (ML20127L513)
- ML20127L514 + (ML20127L514)
- ML20127L515 + (ML20127L515)