Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127D206 + (ML20127D206)
- ML20127D207 + (ML20127D207)
- 05000482/LER-1985-034, :on 850524,containment Water Level Instrument LF-LI-09 Found in out-of-svc Condition.Caused by Obstruction on Slide Pole Resulting from Insulation Activity.Obstruction Removed & Instrument Returned to Svc + (ML20127D208)
- ML20127D209 + (ML20127D209)
- IR 05000298/1992009 + (ML20127D210)
- TXX-4488, Deficiency Rept SDAR-177 Re Possible Defect in Pipe & Tubular Steel Products Manufactured by Phoenix Steel. Initially Reported on 850422.Evaluation Will Be Completed by 850703 + (ML20127D211)
- ML20127D214 + (ML20127D214)
- ML20127D215 + (ML20127D215)
- ML20127D218 + (ML20127D218)
- IR 05000502/2006003 + (ML20127D220)
- ML20127D222 + (ML20127D222)
- ML20127D223 + (ML20127D223)
- ML20127D225 + (ML20127D225)
- ML20127D226 + (ML20127D226)
- ML20127D227 + (ML20127D227)
- IR 05000454/1985021 + (ML20127D228)
- ML20127D229 + (ML20127D229)
- ML20127D230 + (ML20127D230)
- 05000213/LER-1985-011, :on 850516,manual Trip Followed Drop of Two Control Rods & Initiation of Automatic Load Runback.Cause Not Determined.Onsite Investigation by Vendor Underway + (ML20127D231)
- ML20127D232 + (ML20127D232)
- ML20127D233 + (ML20127D233)
- RBG-21342, Responds to Request for Addl Info,Supplementing Util Re Discussions on Mdr Relays & Optical Isolation Devices.Ltr Provides Final Response to Confirmatory Item (26) of Table 1.4 of SER + (ML20127D234)
- ML20127D237 + (ML20127D237)
- RBG-16-172, Forwards Updated Const Status Repts as of 830930.Info for Inclusion in NUREG-0030.Unit Fuel Load Currently Projected for Apr 1985 W/Commercial Operation by Dec 1985.Unit 2 Remains Not Scheduled + (ML20127D238)
- ML20127D241 + (ML20127D241)
- ML20127D243 + (ML20127D243)
- 05000454/LER-1985-056, :on 850515,CECo Engineering Notified Station That Rupture of Common Blowdown Line to Condenser or high-energy Auxiliary Steam Sys Line Could Produce Unacceptably Harsh Environ.Flowrate Reduced + (ML20127D244)
- ML20127D246 + (ML20127D246)
- ML20127D247 + (ML20127D247)
- ML20127D248 + (ML20127D248)
- ML20127D249 + (ML20127D249)
- ML20127D256 + (ML20127D256)
- ML20127D257 + (ML20127D257)
- ML20127D258 + (ML20127D258)
- ML20127D259 + (ML20127D259)
- ML20127D260 + (ML20127D260)
- ML20127D262 + (ML20127D262)
- ML20127D265 + (ML20127D265)
- ML20127D266 + (ML20127D266)
- ML20127D267 + (ML20127D267)
- ML20127D268 + (ML20127D268)
- B830120, Forwards Updated Const Status Rept as of 821231.Commercial Operation Scheduled for 860501 + (ML20127D269)
- ML20127D272 + (ML20127D272)
- ML20127D274 + (ML20127D274)
- ML20127D275 + (ML20127D275)
- ML20127D279 + (ML20127D279)
- ML20127D280 + (ML20127D280)
- ML20127D282 + (ML20127D282)
- IR 05000271/1985012 + (ML20127D285)
- ML20127D286 + (ML20127D286)
- PLA-1540, Forwards Updated Const Status Rept as of 821231.Info for Inclusion in NUREG-0030 + (ML20127D287)