ML20127D260
| ML20127D260 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/18/1985 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20127D264 | List: |
| References | |
| NUDOCS 8506240178 | |
| Download: ML20127D260 (2) | |
See also: IR 05000278/1985022
Text
e
.,3
JUN 18 1985
9
Docket No.
50-278
.
License No. DPR-56
Philadelphia Electric Company
ATTN: Mr. S. L. Daltroff
Vice President
Electric Production
'
2301 Market Strdet-
Philadelphia, Pennsylvania 19101
Gentlemen:
.
l
Subject:
Inspection 50-278/85-22
~
This transmits the findings of a special safety inspection _ conducted by a -
Regional Inspector and the Senior Resident Inspector on June 10 - 13, 1985 at the
Peach Bottom Atomic Power Station, Delta, Pennsylvania. The inspection con-
- sisted of a rev'iew of the events surrounding an apparent inattentive Unit 3
<
licensed reactor operator as observed by an NRC Regional Inspector at approxi-
mately 6:15 a.m. on June 10, 1985.
,
l
l
These findings were based.on observation of activities, interviews, document
~
reviews, and were discussed at an inspection exit meeting conducted with Mr. R.
S. Fleischmann and other members of your staff on June 13,1985. Areas examined
,
during this inspection _are described in the NRC Region I Inspection Report
i_
which -is enclosed with this letter.
.
Based on the results of our inspection, we are concerned about the apparent
inattentiveness of the on-shift Unit 3 licensed reactor operator and in
,
addition, the NRC is concerned regarding the operator's apparent enticing of
'
the NRC Regional Inspector as documented in the plant staff investigation
4
of this occurrence. An enforcement conference has been scheduled for 10:00
a.m. Friday, June 21, 1985, in the NRC Region I office to further discuss these
concerns. At this conference, you should be prepared to discuss the concerns
identified in the enclosed inspection report and corrective actions taken or
l'
planned.
In addition, the licensed operator involved in this situation is
requested to attend this conference.
The need for and nature of appropriate enforcement action relative to the
issues identified in the enclosed report will be considered after this con-
ference and will be the subject of. separate correspondence at a later time. _No
response to this letter is required.
8
OFFICIAL RECORD COPY
IR PB3 85-22 - 0001.0.0
06/17/85
pf D[
4g
,
-
Philadelphia Electric Company
2
JUN 18 1985
Your cooperation with us is appreciated.
Sincerely,
avhynbD op %
Richard W. Starostecki, Director
Division of Reactor Projects
Enclosure:
NRC Region I Inspection Report No. 50-278/85-22
cc w/ encl:
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station
John S. Kemper, Vice President, Engineering and Research
Troy B. Conner, Jr., Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
A. J. Pietrofitta, General Manager, Power Production Engineering,
Atlantic Electric
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bcc w/encls:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
R. Gallo, Section Chief, DRP
S. Collins, Chief PB No. 2
H. Kister, Chief PB No. 1
W. Russell, A/D, DNFS, NRR
D. Holody, ES, RI
DRP. I
~ R
I
N. I
D:
- RI
Johnson
Florek
Bettenhausen
3al o
s
RSt
6/\\'3rostecki
6//7/85
6//)/85
6//7/85
6q/85
6/\\Q5/85
b/85
0FFICIAL RECORD COPY
IR PB3 85-22 - 0002.0.0
06/17/85
g ol