ML20127D259
| ML20127D259 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 01/06/1993 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Goldberg J FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 9301150142 | |
| Download: ML20127D259 (3) | |
Text
._-
JAN 6 1993
-Docket Nos. 50-335, 50-389 License Nos. DPR-67, NPF-16 Florida Power and Light Company ATTN: Mr. J. H. Goldberg President - Nuclear P. O. Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT:
DOCKET NOS. 50-335 AND 50-389 This acknowledges the receipt of your letter of December 17, 1992, which transmitted Revision 36 to the St. Lucie Physical Security Plan.
Our review of the change has found it to be consistent with the provisions of 10 CFR 50.54(p). Accordingly, it is acceptable for inclusion into the plan.
The enclosure to your letter is being withheld from public disclosure because it contains Safeguards Information and must be protected in accordance with the provisions of 10 CFR Part 73.21.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, I1LkCh ONO
(){\\N (
kC
{\\ Douglas M. Collins, Chief Nuclear Materials Safety and Safeguards Branch s
Division of Radiation Safety and Safeguards cc:
D. A. Sager Site Vice President St. Lucie Nuclear Plant P. O. Box 128 Ft. Pierce, FL 34954-0128 R. E. Grazio, Director Nuclear Licensing Florida Power and Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 (cc. cont'd - See page 2) 150037
] (,.o t 9301150142 930106 PDR ADOCK 05000335 I(O PDR
,4 5
FJoridi_ Power and -Light 2
JAN 6 1993 Company (cc cont'd)
G. J. Boissy Plant General Manager St. Lucie Nuclear Plant P. O. Box 128 Ft. Pierce, FL 34954-0128-Harold F. Reis, Esq.
Newman & Holtzinger 1615 L Street, NW Washington, D. C.
20036 John T. Butler, Esq.
Steel, Hector and Davis 400 Southeast Financial Center Miami, FL 33131-2398 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 Jack-Shreve Public Counsel Office of the Public Counsel
.c/o uThe Florida Legislature 111_ West. Madison Avenue, Roomi812 Tallahassee, FL.32399-1400 Robert G. Nave, Director
. Emergency Management Department of_ Community-Affairs 2740.Centerview Drive-Tallahassee, FL - 32399-2100
'(cc cont'd See page 3)
~
-b 6 o93
'M J
F.lorida Power and Light 3
Company (cc cont'd)
James V. Chisholm County. Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, FL 34982 Charles B. Brinkman Washington Nuclear Operations ABB Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 bcc: K. Landis, Ril J. Norris, NRR NRC' Resident inspector U.S. Nuclear Regulatory Commission 7585 South Highway A1A Jensen Beach,~ FL 33457 Document Control Desk (RG01), 42-P Chief, Safeguards Branch, NRR, 90-24 Region II Licensing File, (50-335)'(50-389), TAB 2 RII:DRJS RII [R S RS RII-MA
- JC' STA etCGUIRF /
LAt $-
_01/0 /93..
01/()D 93 BERRY; [ 6 93 4
/
01/4 /93 1
.