Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126B747 + (ML20126B747)
- PNO-V-80-009, on 800211,during Unloading of Seven 55-gallon Drums,Nrc Inspector Onsite Noticed That Two Drums Rattled. Caused by Vials Containing Radioactive Liquid.No Absorbent Matl Present as Required by DOT Regulations + (ML20126B748)
- ML20126B749 + (ML20126B749)
- ML20126B750 + (ML20126B750)
- ML20126B751 + (ML20126B751)
- IR 05000456/1979015 + (ML20126B752)
- ML20126B753 + (ML20126B753)
- PNO-III-85-043A, on 850530,control Rods F-12 & J-4 Found Stuck During Insp.Caused by Split Pin & Broken Piece of Tube Being Lodged in Guide Tube.Guide Tube Inserts & Internals Will Be Removed & Inspected + (ML20126B754)
- ML20126B756 + (ML20126B756)
- ML20126B757 + (ML20126B757)
- ML20126B758 + (ML20126B758)
- ML20126B759 + (ML20126B759)
- ML20126B760 + (ML20126B760)
- ML20126B761 + (ML20126B761)
- PNO-II-80-032, on 800226,combination of non-nuclear Instrumentation Power & Integrated Control Sys Power Tripped Reactor.Coolant Pumps Stopped,High Pressure Safety Injection Activated & Auxiliary Feed Pumps Activated + (ML20126B762)
- PNO-III-80-039, on 800227,unit Shut Down Because of Tube Leakage in Steam Generator A.Leak Rate Was 1420 Gpd.Licensee Will Conduct Eddy Current Tests + (ML20126B764)
- ML20126B765 + (ML20126B765)
- ML20126B766 + (ML20126B766)
- PNO-II-80-030A, on 800220,util Issued Press Release on Reactor Trip.Westinghouse & Licensee Have Completed Initial Set of Noise Measurement Tests & Will Compare Results W/Normal Operation Testing to Locate Noise + (ML20126B767)
- ML20126B768 + (ML20126B768)
- ML20126B770 + (ML20126B770)
- ML20126B773 + (ML20126B773)
- ML20126B774 + (ML20126B774)
- ML20126B775 + (ML20126B775)
- B11560, Forwards Response to SER (NUREG-1031) Open Item 2.2 Re Diesel Generator Load Acceptance Test After Operation,As Discussed During 850208 Telcon W/A Ungaro.Response Fully Resolves Item + (ML20126B777)
- ML20126B778 + (ML20126B778)
- ML20126B780 + (ML20126B780)
- ML20126B782 + (ML20126B782)
- ML20126B784 + (ML20126B784)
- ML20126B785 + (ML20126B785)
- IR 05000454/1992023 + (ML20126B786)
- PNO-I-80-002, on 800223,observed Two Individuals Climb Protected Area Barrier Fence on East Side of Site. Individuals Eluded Security Force Surveillance.All Onsite Personnel Identified + (ML20126B788)
- ML20126B790 + (ML20126B790)
- ML20126B791 + (ML20126B791)
- ML20126B794 + (ML20126B794)
- ML20126B796 + (ML20126B796)
- ML20126B797 + (ML20126B797)
- ML20126B798 + (ML20126B798)
- PNO-II-80-034, on 800226,small Leak Observed from Reactor Water Storage Tank Cooling Sys.Estimated 270 Gallons of Water Contaminated Ground.Licensee Sampling of Storm Drain Sys Showed No Release.Contaminated Matl to Be Shipped + (ML20126B799)
- ML20126B801 + (ML20126B801)
- ML20126B802 + (ML20126B802)
- ML20126B803 + (ML20126B803)
- 05000334/LER-1992-012-01, :on 921116,discovered That Pressurizer Heaters, Powered from Class 1E 480-volt Buses 8N & 9P,could Trip Emergency Bus Unit Substation.Caused by Inadequate Design Assumption.Trip Setting Under Review + (ML20126B804)
- ML20126B806 + (ML20126B806)
- ML20126B807 + (ML20126B807)
- ML20126B808 + (ML20126B808)
- ML20126B809 + (ML20126B809)
- ML20126B810 + (ML20126B810)
- ML20126B812 + (ML20126B812)
- ML20126B814 + (ML20126B814)
- ML20126B815 + (ML20126B815)