List of results
- ML20126B218 + (ML20126B218)
- ML20126B219 + (ML20126B219)
- ML20126B222 + (ML20126B222)
- IR 05000148/1992001 + (ML20126B223)
- ML20126B224 + (ML20126B224)
- ML20126B225 + (ML20126B225)
- ML20126B226 + (ML20126B226)
- ML20126B228 + (ML20126B228)
- IR 05000382/1992023 + (ML20126B229)
- ML20126B230 + (ML20126B230)
- ML20126B232 + (ML20126B232)
- ML20126B233 + (ML20126B233)
- ML20126B234 + (ML20126B234)
- ML20126B235 + (ML20126B235)
- 3F0685-08, Monthly Operating Rept for May 1985 + (ML20126B236)
- ML20126B237 + (ML20126B237)
- ML20126B238 + (ML20126B238)
- ML20126B239 + (ML20126B239)
- ML20126B240 + (ML20126B240)
- RBG-21152, Interim Deficiency Rept DR-296 Re Tube Steel Supports Furnished by Hub,Inc.Next Rept Will Be Submitted by 850613 + (ML20126B241)
- PNO-I-80-025A, on 800211,40.5 Ci Xe-133 Released Representing 37% Tech Spec for Instantaneous Release.On 800212 Local Emergency Declared in Auxiliary Bldg Again Due to Ion Exchanger.No Release Evident + (ML20126B242)
- ML20126B243 + (ML20126B243)
- ML20126B244 + (ML20126B244)
- ML20126B245 + (ML20126B245)
- ML20126B246 + (ML20126B246)
- ML20126B247 + (ML20126B247)
- ML20126B249 + (ML20126B249)
- ML20126B252 + (ML20126B252)
- ML20126B253 + (ML20126B253)
- TXX-4487, Deficiency Rept SDAR-181 Re Branch Feedwater Line Break Which Could Cause Unacceptable Jet & Whip Interaction W/Containment Spray Headers.Initially Reported on 850515. Evaluation Will Be Complete by 850723 + (ML20126B255)
- IR 05000275/1992032 + (ML20126B257)
- ML20126B258 + (ML20126B258)
- PNO-I-80-031, on 800131,licensee Identified Nine Fuel Assemblies Containing Leaking Fuel Pins.At Least Two Pins Appeared to Have Missing Segments.Cause Not Stated.Damaged Fuel Assemblies Being Replaced + (ML20126B260)
- ML20126B261 + (ML20126B261)
- PNO-II-80-021, on 800208,QC Inspectors Qualified for Inspecting Pipe Hangers Terminated for Cheating on Test That Would Have Expanded Expertise.Licensee Expects Employees to Create Media Interest + (ML20126B262)
- ML20126B264 + (ML20126B264)
- PNO-II-80-022, on 800208,w/both Units Operating,Both Seismic Recorders Activated.Checks Made W/Other Agencies Revealed No Seismic Activity.Licensee Implemented Emergency Procedure.Evidently Caused by Welding Activities + (ML20126B265)
- PNO-I-80-026, on 800125,27 & 0213,pinhole Leaks Found in Transfer Pipe from Condensate Storage Tank During Insp of Pipe.Contaminated Soil Was Removed & Pipe Replaced.Media Interest Expected + (ML20126B267)
- PNO-IV-85-027, on 850609,facility Achieved Mode 1.Plant Presently at 10% Power.Nrc Does Not Plan to Issue Press Release + (ML20126B268)
- ML20126B269 + (ML20126B269)
- PNO-II-80-023, on 800213,during Surveillance Test,Reactor Trip Occurred When Mechanic Accidentally Struck Instrument W/Wrench.Bldg Was Evacuated Due to Increased Radioactive Gas.Individual Has Small Contamination Level on Clothing + (ML20126B270)
- ML20126B271 + (ML20126B271)
- ML20126B272 + (ML20126B272)
- ML20126B273 + (ML20126B273)
- PNO-I-92-075, upon Investigation of Alarm Printed Out on Auxiliary Typewriter on 921213,operators Determined That Cpu for Overhead Annunciator (Oha) Had Failed to Perform, Resulting in Loss of Oha Sys for 1 H & 41 Minutes + (ML20126B275)
- ML20126B276 + (ML20126B276)
- ML20126B278 + (ML20126B278)
- ML20126B279 + (ML20126B279)
- ML20126B280 + (ML20126B280)
- ML20126B281 + (ML20126B281)
- ML20126B282 + (ML20126B282)