ML20126B282
| ML20126B282 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 06/05/1985 |
| From: | Dietz C CAROLINA POWER & LIGHT CO. |
| To: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20126B285 | List: |
| References | |
| RTR-NUREG-0020, RTR-NUREG-20 BSEP-85-1098, NUDOCS 8506140059 | |
| Download: ML20126B282 (1) | |
Text
'
s
~
CD&L Carolina Power & Light Company Brunswick Steam Electric. Plant P. O. Box 10429 Southport, NC 28461-0429 June 5, 1985 FILE:
B09-13510C SERIAL: BSEP/85-1098 Mr. J. M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear-Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT
Dear Mr. Taylor:
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of May 1985.~
Also, as of the January 1985 issue of NUREG-0020, the change in the description of outage 84-038, of which your office was notified last summer, has not yet been made. This outage was initia11y' reported as " forced" but was actually a " scheduled" outage and should be reported as such.
Your assistance in correcting this will be greatly appreciated.
Very truly yours, T
C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/mcg MSC/85-0014 Enclosures cc:
Mr. M. R. Beebe Dr. J. N. Grace Mr. J. L. Harness Mr. C. F. Lassiter 1/ g Ms. D. J. Vicks g
INPO h
\\
8506140059 850605 l
PDR ADOCK 05000324 R
PM J