Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20125A787 + (ML20125A787)
- PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart + (ML20125A788)
- ML20125A791 + (ML20125A791)
- ML20125A793 + (ML20125A793)
- ML20125A795 + (ML20125A795)
- ML20125A796 + (ML20125A796)
- ML20125A798 + (ML20125A798)
- ML20125A799 + (ML20125A799)
- ML20125A801 + (ML20125A801)
- ML20125A802 + (ML20125A802)
- ML20125A803 + (ML20125A803)
- ML20125A805 + (ML20125A805)
- ML20125A806 + (ML20125A806)
- ML20125A810 + (ML20125A810)
- ML20125A811 + (ML20125A811)
- RBG-21-130, Revised Final Deficiency Rept DR-282 Re Lack of Antisiphon Device in Spent Fuel Cooling Lines in Containment & Fuel Bldgs.Initially Reported on 850304.Antisiphon Holes Drilled in Spent Fuel Cooling Sys Supply & Return Pipes + (ML20125A812)
- ML20125A813 + (ML20125A813)
- ML20125A815 + (ML20125A815)
- ML20125A817 + (ML20125A817)
- ML20125A818 + (ML20125A818)
- ML20125A819 + (ML20125A819)
- ML20125A820 + (ML20125A820)
- 05000321/LER-1979-051, Forwards LER 79-051/03L-0 + (ML20125A827)
- ML20125A828 + (ML20125A828)
- ML20125A829 + (ML20125A829)
- ML20125A832 + (ML20125A832)
- ML20125A834 + (ML20125A834)
- 05000321/LER-1979-051-03, /03L-0 on 790726:during Cold Shutdown,While Performing Design Change Request 78-201,control Power Cables to E11-F008 Valve Were Disconnected & Cut W/Valve in Open Position.Caused by Personnel Error.Valve Reconnected + (ML20125A835)
- ML20125A836 + (ML20125A836)
- ML20125A838 + (ML20125A838)
- ML20125A840 + (ML20125A840)
- ML20125A841 + (ML20125A841)
- 05000321/LER-1979-056, Forwards LER 79-056/01T-0 + (ML20125A842)
- ML20125A843 + (ML20125A843)
- 05000321/LER-1979-056-01, /01T-0 on 790803:during Performance of Hanger Rework Project,Discovered Section of Piping Crossfied Not Supported Per Seismic Class I Requirements.Caused by Design Error.Piping Upgraded + (ML20125A847)
- IR 05000225/2005003 + (ML20125A850)
- 05000321/LER-1979-054, Forwards LER 79-054/06T-0 + (ML20125A851)
- 05000321/LER-1979-054-06, /06T-0 on 790802:during Monthly Inventory of Onsite Snm,Discovered Three Detectors Had Been Mistakenly Shipped Off Site for Disposal W/O Authorization.Caused by Improper Tagging.Procedure Changes Submitted + (ML20125A855)
- ML20125A856 + (ML20125A856)
- ST-HL-AE-1254, Final Deficiency Rept Re Effects on Postulated Failure of Reactor Coolant Pump Thermal Barrier HX Combined W/Single Active Failure of Component Cooling Water Isolation Valve. Initially Reported on 850220.Valve Monitors Installed + (ML20125A857)
- ML20125A860 + (ML20125A860)
- 05000282/LER-1979-022, Forwards LER 79-022/03L-0 + (ML20125A861)
- ML20125A863 + (ML20125A863)
- ML20125A867 + (ML20125A867)
- ML20125A871 + (ML20125A871)
- 05000282/LER-1979-022-03, /03L-0 on 790716:bistable in Steam Exclusion Actuation Sys Tripped Three Degrees Above Limit During Surveillance Test.Caused by Drift of Foxboro Bistable Model 63U-CC-OHDR-F.Bistable Inspected & Recalibr + (ML20125A875)
- ML20125A876 + (ML20125A876)
- ML20125A879 + (ML20125A879)
- ML20125A880 + (ML20125A880)
- ML20125A881 + (ML20125A881)
- ML20125A882 + (ML20125A882)