Submits Revision to Re Implementation of 100% QC Overview of Certain safety-related Concrete Activities. Attachment B Has Been Superseded by Later Memo Stating That All Hold Points Are in Effect Until Rescinded in Writing
ML20125A867
Person / Time
Site: Marble Hill
Issue date: 07/18/1979
From: Coughlin J
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20125A869 List:
References
NUDOCS 7908200291
Download: ML20125A867 (2)


Text

_

u 4.i o a.> v u -1 2 7

PUBLIC SERVICE INDIANA July 18, 1979 James Cosg'an Vote P*ews N.st w Mr. Caston Fiore111 United States Nuclear Regulatory Commaissico scgion III 799 Roosevelt Road Docket Nos.: STN 50-546 Clen Ellyn, 1111acis 60137 SIN 50-547 Subj ect: Marble Bill Nuclear Generating Station - Units 1 and 2 PSI Overview Program Centlemen:

This letter supersedes the July 3,1979 letter from our Mr. F. R. Hodges to your Mr. Frank Esukins, and is the formal response as to the method of implementing the "1001 QC overview." The test remains the same. Attach-ment B however has been superseded by a later memo stating that all hold poin s are and will be in effect until recinded by a PSI QC representative in writing.

In accordance with the preliminary commitments made by PSI in the June 26, 1979 meeting (Ref.: Attached Pre-Meeting Attendance List), PSI will estab-lish a 1001 " Overview Program" encompassing safety related concrete activ-ities performed by the Cost E. Newberg Company. The program vill consist of the following:

1.

Cust E. Newberg has upgraded certain work and quality control pro-cedures; based on the revisicos, PSI has instituted a " Hold Point" program consisting of activities that cannot be gone beyond with-out PSI QC verificatico that the activity has been acconolished correctly. This verification will consist of actual physical in-spections and surveillances performed and doctmented in accor-dance with approved procedures.

2.

The "Rold Points" will be transmitted to the Newberg QA Supervisor on a periodic basis or until such time the " Hold Points" are changed or recinded.

3.

Each " sold Point" is predefined (See Attachment B).

100C East Mam Sirest. Pisinfseid. IM= de 317 7 9e?twM/

I

  • h
  • 54 Mr. Gaston Fiorelli July 18,1979 PueUC stava scana 4.

The " Bold Point" program was instituted July 3,1979 in order to " burn in" the system to demonstrate it's effectiveness.

5.

PSIhasaugmentedit'sQCinspectionandengineeringstaff(2QC Engineers and 4 Level 11 Concrete Inspectors) to perform or sur-vey the activities.

6.

PSI has performed and documented an indoctrinstion review and training session of the " Bold Point" program as well as the revised Newberg work and Quality Control procedures.

7.

PSI has implemented the program effective July 3, 1979 - (Ref.:

Attachment C) in accordance with Otr 3.8.

Sincerely, B

1 ')-

W%

ames Coughlin ce President *uclear JC:jb At:achments cc:

E. R. Schweibins, F.E.

-