Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116G478 + (ML20116G478)
- ML20116G479 + (ML20116G479)
- NSD-NRC-96-4789, Forwards AP600 PRA Info on Description of Dvi Line Break Cases.Westinghouse Copyright Notice,Proprietary Info Notice, Application for Withholding & Affidavit Attached Also + (ML20116G483)
- ML20116G489 + (ML20116G489)
- NLS8500071, Forwards Rev 2 to IGSCC Project man-rem Estimates,Providing Explanations for Indicated Changes + (ML20116G492)
- ML20116G495 + (ML20116G495)
- ML20116G496 + (ML20116G496)
- ML20116G499 + (ML20116G499)
- ML20116G508 + (ML20116G508)
- ML20116G512 + (ML20116G512)
- ML20116G514 + (ML20116G514)
- ML20116G518 + (ML20116G518)
- ML20116G520 + (ML20116G520)
- ML20116G522 + (ML20116G522)
- U-602612, Provides Addl Info Re Amend to License NPF-62,revising TS 3.4.11, RCS Pressure & Temp Limits, to Incorporate Specific P/T Limits for Bottom Head Region of Rv,Separate & Apart from Core Beltline Region of Rv + (ML20116G529)
- ML20116G532 + (ML20116G532)
- ML20116G537 + (ML20116G537)
- ML20116G541 + (ML20116G541)
- ML20116G551 + (ML20116G551)
- ML20116G572 + (ML20116G572)
- ML20116G580 + (ML20116G580)
- ML20116G587 + (ML20116G587)
- ML20116G589 + (ML20116G589)
- ML20116G605 + (ML20116G605)
- ML20116G607 + (ML20116G607)
- ML20116G613 + (ML20116G613)
- 05000328/LER-1992-014-01, :on 921007,LCOs 3.6.4.1 & 3.0.5 Were Entered Because of Hydrogen Analyzer Inoperability.Caused by Low Reagent Gas Pressure for Train a Hydrogen Analyzer. Replacement pop-off Valve Ordered + (ML20116G615)
- ML20116G616 + (ML20116G616)
- ML20116G618 + (ML20116G618)
- ML20116G620 + (ML20116G620)
- ML20116G622 + (ML20116G622)
- ML20116G624 + (ML20116G624)
- RBG-37-686, Responds to NRC Re Violations Noted in Insp Rept 50-458/92-21.Corrective Actions:Listed Procurement & Receipt Insp Requirements Will Be Included in Procedure EDP-EQ-22 + (ML20116G625)
- ML20116G626 + (ML20116G626)
- ML20116G630 + (ML20116G630)
- ML20116G631 + (ML20116G631)
- ML20116G634 + (ML20116G634)
- BSEP-96-0294, Requests Changes to Svc/Distribution List for NRC Correspondence & Documents Re Plant + (ML20116G637)
- ML20116G638 + (ML20116G638)
- ML20116G639 + (ML20116G639)
- 05000382/LER-1985-011, :on 850321,several Samples of O & H Concentration in Gas Decay Tank Not Taken.Caused by Misunderstanding Between Personnel.Samples Subsequently Taken.Technicians Given New Instructions + (ML20116G642)
- NRC-96-0087, Provides Response to NRC 960628 Request for Util to Confirm Commitment to Resolve Fuel pool-related Issues Re DER 95-1021,96-0235 & 96-0306.Resolution in Progress + (ML20116G647)
- ML20116G648 + (ML20116G648)
- 05000456/LER-1992-011-06, :on 921007,inadequate Testing Frequency for Afp Start on RCP Bus Undervoltage.Caused by Procedural Deficiency.Instrument Slave Relay Surveillances Increased from Quarterly to Monthly Per TS 4.3.2.1 + (ML20116G655)
- ML20116G658 + (ML20116G658)
- ML20116G662 + (ML20116G662)
- ML20116G670 + (ML20116G670)
- ML20116G671 + (ML20116G671)
- ML20116G683 + (ML20116G683)
- ML20116G688 + (ML20116G688)
- ML20116G691 + (ML20116G691)