Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115C594 + (ML20115C594)
- 05000302/LER-1992-020, :on 920914,determined That Two of Four HPI Valves May Not Function Under Certain Design Basis Conditions.Caused by Insufficently Detailed Instructions. Control Circuits Rewired & Valves Restored + (ML20115C595)
- 2CAN038507, Monthly Operating Rept for Feb 1985 + (ML20115C596)
- ML20115C598 + (ML20115C598)
- ML20115C601 + (ML20115C601)
- 05000298/LER-1996-006, :on 960606,established That 10CFR50 App R Vulnerabilities Existed Due to Errors Incurred During Plant Design Changes.Discrepant Configurations Modified & safe- Shutdown Analysis re-performed for Fire Areas + (ML20115C607)
- ML20115C612 + (ML20115C612)
- 05000277/LER-1992-017, :on 920912,APRM Surveillance Missed Due to Less than Adequate Implementation of Change in Performing Soft Shutdowns.Soft Shutdowns Will Be Evaluated as Plant Evolution/Special Test + (ML20115C614)
- ML20115C615 + (ML20115C615)
- ML20115C617 + (ML20115C617)
- ML20115C629 + (ML20115C629)
- ML20115C634 + (ML20115C634)
- ML20115C635 + (ML20115C635)
- ML20115C638 + (ML20115C638)
- ML20115C659 + (ML20115C659)
- ML20115C673 + (ML20115C673)
- ML20115C679 + (ML20115C679)
- ML20115C680 + (ML20115C680)
- ML20115C683 + (ML20115C683)
- BSEP-96-0245, Provides Plans for Reinspection of BSEP Unit 1 Core Shroud, Per GL 94-03.Reinspection Planned for B111R1 Refueling Outage Scheduled to Begin 961005 + (ML20115C686)
- ML20115C690 + (ML20115C690)
- ML20115C695 + (ML20115C695)
- ML20115C702 + (ML20115C702)
- ML20115C704 + (ML20115C704)
- ML20115C706 + (ML20115C706)
- ML20115C709 + (ML20115C709)
- ML20115C715 + (ML20115C715)
- ML20115C729 + (ML20115C729)
- ML20115C734 + (ML20115C734)
- ML20115C737 + (ML20115C737)
- GO2-84-171, Annual Environ Operating Rept,1983 + (ML20115C739)
- ML20115C743 + (ML20115C743)
- ML20115C764 + (ML20115C764)
- ML20115C768 + (ML20115C768)
- B15775, Submits Description of ISI & Test Program & Requests Relief from Code Requirements for Third 10-yr Insp Interval + (ML20115C772)
- ML20115C784 + (ML20115C784)
- ML20115C790 + (ML20115C790)
- ML20115C794 + (ML20115C794)
- ML20115C808 + (ML20115C808)
- 05000440/LER-1992-018, :on 920708,hourly Fire Watch of Inoperable Fire Barriers Not Performed as Required.Caused by Personnel Error.Counseling & Disciplinary Action Administered + (ML20115C809)
- ML20115C813 + (ML20115C813)
- 05000333/LER-1985-009, :on 850322,three Target Rock Safety/Relief Valves Had Setpoint Values Outside Allowable Tolerances. Possibly Caused by Inadequate Clearances in Laberinth Seal Area or Pilot Seat Leakage.Valves Overhauled + (ML20115C823)
- PY-CEI-NRR-1559, Forwards Addl Info & Addl Change Re 920929 Emergency TS Change Request for RCIC & RWCU Outboard Valves to Address Questions Raised During Recent GL 89-10 NRC Insp on Capability of E51-F064 & G33-F004 Valves + (ML20115C826)
- ML20115C827 + (ML20115C827)
- ML20115C832 + (ML20115C832)
- ML20115C833 + (ML20115C833)
- ML20115C848 + (ML20115C848)
- ML20115C853 + (ML20115C853)
- PM-85-027, Monthly Operating Rept for Feb 1985 + (ML20115C858)
- ML20115C869 + (ML20115C869)
- ML20115C873 + (ML20115C873)