ML20115C737
| ML20115C737 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 09/30/1992 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20115C552 | List: |
| References | |
| NUDOCS 9210200065 | |
| Download: ML20115C737 (10) | |
Text
___ - __
OPERA!!NG DA1A FIFOR1 DOCIEI NO _ _}t M9 DA1E QthttLllulfit,
OPE M ile STATUS
-COMPLETEDPY R.A. Willi ns IElEFn0NE, 704-302-5346
- 1. Unit Nase McGuire 1
- 2. Reporting ieriods septester 1, 1992 September 30,1992
- 3. Licensed Thereal Feuer (MWt):
3411
- 4. Nueplau Fating (Bross MWelt 1305e Notes *Naeeplate Rating
- 5. Design Electrital Rating (Net MWe):
1180 (GrossMWe)cattulatedas
- 6. Maximus Dep.:.Jable Capacity (Gross MWe):
1171 1450.000 MA x.90 power 1.ManteueDependableCapacity(WetMWe):
1129 factor per Page til, 8.IfChangesOcturinCapacityRatingsilleesNueber3Through7)SinceLst NURE6 0020.
Report.GiveReasons:
- 9. Power Level To Which Restricted, if Any (Net MWe):
10.ReasonforPestrictions,ifany 1his $ nth tr.-to-Cate
'Cusulative 11, Hours In Reporting Period 720.0 6575.0 94967.0
- 12. Nusber Of Hours Feactor Was Critical 720.0 4653.7 66647.2
- 13. Reactor Reserve Shutdown Hours
+-0--
--0--
--0--
- 14. Hours Benerator On-Line 720.0 4632.6 65913.5
- 15. Unit Reserve Shutdown Hours -
--0-+
- 16. Gross Thereal Energy Benerated (MWM) 245C774 15M60%
__ 202281757
- 17. Gross Electrical Energy Generated (I,WH1 821620 5230419 69590244
- 19. Net Electrical Energy Generated (MWH) 789618 4997860 66420913
- 19. Unit Service Factor 100.0 70.5 69.4 20.UnitAvailabilityFactor 100.0-70.5 69.4
- 21. Unit Capacity factor (Using HDC Net) 97.1-67.3.
60.7
- 22. Unit Capacity Fattor (Using DER Net) 92.9L 64.4 59.3-
. 23. Unit Forced Outage 1 tate 0.0 29.5 13.9
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
h fuc.14no - Wrch 19_ 140'4 M Anve -
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units In Test Etatus (Prior to Coseercial Operation):
Forecast Achieved 1NiilALCRillCAlliY INii!ALELECTRitiTI
~
COMMERCIAL DPERAT10N 9210200065 921015 Pl>R ADOCK 05000369
.R PDR
e OFEFAllNB DATA FEFORT g
00ttti NO 50-369-UNif McGuire 1-DATE Octt4tr 15.1992 EDMPLETED BY R.A.WillW1 TELEPHDNE 7M-30C-5346 liCNTH En t est+tt.1992 i
El AYERABE DAILf TOWER LEVEL
[1{
AVERAGE DAILY POWER LEVEL inWe Net).
(MWr-Net) 1 1096 17 1094 2-1100 18 1096 3
1101 19 1099 4
1097 20 1094 5
1094 21 1092 6
1094 22 1094 7
1095 23 1093 8
1094 24 -
- 1096 =
9 1094 25 1100 10 1096 26 1104 11 1093 27.
1106 12 1009 28 1103 13 1091 29 1105 14 1092 30
'1116 15 1090 16 1092
_ _ _ =
1 UNIT SHUTDOWNS AND POWER REDUCTIONS UDCKET NO.
50-369 UNIT NAME Mwu lst. 1 DATE 10/13/94 REPORT MONTH September 1992 COMPLETED BY r4. c. sinnur<s TELEPHONE (iusJ-Juz-dzba
- i (1) l 2)
(4)
(5)
E HOD I
i T
A OF LICENSE N
.Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE i
.O P
DURATION O
DOWN REPORT TEM COMPONENT ACTION TO
(
i DATE E
HOURS N
R/X NO.
CODE CODE PREVE!*"I RECURRENCE NO SHUTDG'NS OR REDUCTION S d
i i
f 4
i l
f (1[ Forced (2
(3 (4
[
.. ' ' son-ethod:
xhibit G - Instructions S Scheduled A Jguipment' Failure (Explain) 1-Manual for Preparation of Data B-K'.alntenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling.
3-Automatic Scram Event Report jLER)
D-Regulatory Restrictiory 4-Other (Explain)
File (NUBEG-OA61)
E-Operator Training & License Examination j
F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)
I i
l l
l l
l l
t
MONTHLY RFJUELING INFORMATION REOUEST 1.
Facility names _McGuire.
Unit 1 3.
Scheduled next refueling shutdown: March 1993 3.
Scheduled restart following refueling: May 1191 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT.
TilEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN T!!IS REPORT.
4.
Will refueling or tesumption of operation thereaf ter require a technical specification change or other license amendment?
If ycs, what will thous be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled dr,te ( s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (now or different desig i or
- supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: ill 8.
Present licensed fuel pool c1pacity: 1451 Size of requested or planned increases ---
9.
Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE:
Sectember 15, 1992 Name of
Contact:
R.
A. Williams Phone:
704-382-5346
DOCKET NO:
50-369 UNIT: McGuire 1 DATE:
10/15/92 NARRATIVE
SUMMARY
MONTH: September 1992 McGuire Unit 1 began the month of September operating at 100% full power. The unit operate at or near 100% for the entire month. The. unit end.;d thc month at 1006.
s e
Prepared by:
N. C. Simmons Telephone:
704 382-5263
OPERA 11N6 DATA REFORT DOCttiN3 50 370 DATE October 15. 1992 QPERATINGSTATUS_
COMPLETED 2V R. Ai niillins -
TELEPHONE 704 3'2 5346
- 1. Unit Nase McGuire 2
- 2. Reporting Feriod Septesber 1,1992 September 30,19ft
- 3. Licensed 1hersal Fever IMWt):
3411
- 4. Nastplate Rating (Stoss MWe):
1305 Notes #Nastplate Rating
- 5. Devan Electrical Rating (Net MWe):
1190 (C;ost MWel taltulated as
- 6. Manisus Dependable Capacity (6 toss MWr):
1171 1450.000MVAi.90 power
- 7. Maxieue Dependable Capacity (Net MWe):
1129 factorperFageill,
- 9. If Changes Ottur in Capatity Patings titres Nusber 3 through 7) Since Last fEEG-0020.
Report. Give Reasons
- 9. Power Level to Which Restricted, if Any (Net NWe):
- 10. Reason For Restrictions, if any
'This Month Yr.-to-0 ate Cumulative
- 11. Hours la Reporting Feriod 720.0 6575.0' 75263.0 s
- 12. Nusber Of Hours Feattor Was Critical 720.0 4005.9 57207.4
- 13. Reactor Reserve Shutdoah Hours
- --0--
--0--
- 14. Hours Generator On-Line 720.0 3935.2 562B9.1.
__15. Unit Reserve Shutdown Hours
--0 --
--0
--0**
- 16. Gross Thereal Energy 6enerated (MWH) 2449036 12876391 193B92B21-17, 6 toss Electrical Energy Benerated (M E 035160 4450407 64289322
- 18. Net Electrical Energy Generated (MWHi 803633 426B001 61628412
- 19. Unit Service fatter 100.0 59.9 74.8
- 20. Unit Availability Factor 100.0 59.9 74.8
- 21. Unit Capacity Fatter (Using MDC Net) 98.9 57.2 71.5
- 22. Unit Capacity Fatter (Using DER Net) 94.6 54.8 69.4
,23.UnitForcedOutageRate 0.0 5.6 '
7.9
- 24. Shutdown Scheduled Over Next 6 flonths (Type, Date, and Duration of Each):
NONE~
- 25. If Shut Down At End Of Peport Period. Estiested Date of Startup:
- 26. Units in fest Status (Prior to Consercial Operation):
Forecast-Achieved-IN111AL CRlilCAllii-IN!ilALELECTRICITY COMMERCIALOPERAi!0N
. -. -. - - - _.. - _ _ ~. -
. -.. - ~. - -.. -..
I 4
{
i OPERAllNS NTA REPORT L
4 I
4 r
DDCLEI NO 50370 UN!I McGuire 2 MTE hiper 15. 1992 I
COMPLETED H R.A. Williant r
itllPHONE 704-392 5346 3
4
- l 90 NTH Bentenber,1992 i
g AVERABE CA!LY F0WER LEVEL M
AVERABE DAILY F0WER LEVEL-
[
(MWe-Net)
(MWe-Net) 1 5119 17 1114 2
1120 18 1116 3
1122 19 1108 4
1119 20 1114 k
kil 6
1115 22 1116 7
1116 23
-1115 81 1115 24
!!!5 9
_,1116
- 25 1117 l
10 1117 26 1117-11 1113 27 1128 12 1100 28 1125 13 1109
- 29 1122 14 1112 1123 i
15
-1112 16 1113 6
.y+..,,,
3,,,,,.,v--
-n y : e p.y.
..w y,
-w,,
pcny,,,,,-mwy,,-+w w w,- we,e g
++,e-,,
5w..,m e, w -,
-,r ew t-
% e - ec o- --w e, % e n e-
<-e ww i w nw.w w
+--w.
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 l
UNIT NAME Mu,u 1 H1:, z DATE I Ff.of32 i
REPCRT MONTH - September 1992 COMPLETED BY r4. c. sinr.ur s I
TELEPHONE teve}-Juz-dzda i
t (1) 2)
3 (4)
(5)
E HOD T
A OF LICENSE' N
Y S
SHUR EVENT SYS-CAUSE AND CORRECTIVE l
O P
DURATION O
DOWN REPORT TEM COMPONENT ACTION TO F
DATE E
~ HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE j
[
NO SHUTDOWNS OR REDUCTION S
1
[
1 i
I r
l i
4 i
l (1)-
(2)
(3)
(4)
F Forced Reason-Method:-
Exhibit G - Instructions B-Mainf_mentFailure(Explain)
'1 A-Equi 1-Manual for Preparation of Data S Scheduled-r enance or test 2-Manual Scram Entry Sheets For Licensee l
C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Rgstriction 4-Other (Explain)
File (NUREG-Ol61) i E-Operator Training.& License Examination i -
F-Administrative (5) i
!^
G-Operator Error'(Explain)
Ex-hibit I - Same Source H-Other (Explain) l i
1 1
4 b
t
?
liOETHLY REFUELINQ_lNFORMATION REOUEST 1.
Facility name: McGuire, Unit 2 3.
Scheduled next refuelli.g shutdown: June 1993 3.
Scheduled restart following refueling: Aucust 19 M TiiE PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CilANGE OR LICENSE AMENDMENT.
T!!EREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN TilIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will thece be?
If no, has reload design and core configuration been reviewed by Safety Review Ccmmittee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Import".it licensing considerations (new or different design or Nn% 1er, unroviewed design or performance analysis methods,
~
significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: in (b) in the spent fuel pool: 241 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE:
Seotember 15, 1992 Name of
Contact:
R.
A.
Williams Phones 704-382-5364
_.J
UNIT: McGuire 2 DATE:
10/15/92 NARRATIVE
SUMMARY
MONTil:
September 1992 McGuire Unit 2 began the month of September operating at 100% full power. The unit nparated at or near 100% for the entire month.
The unit ended the month at 100% full power.
n a
Prepared by:
N. C. Simmons Telephone:
704 382-5263
- _ _ _ _ _ _ - _ _ _ - - _ - - _ _ _ _ _ _ _ _ -