y OPERATING DATA REPORT DOCKET NO. 50-397 UNIT WNP-2 3/1/85 DATE u W Son COMPLETED BY TELEPHONE (509) 377-2501 ext 2486 OPERATING STATUS ekuay M

1. REPORTING PERIOD:

GROSS HOURS IN REPORTING PERICO:

3323 1095

2. CURRENTLY AUTHORIZED POWER LEVEggi:

uAx. DEPENO. CAPACITY (MWe Net):

DESIGN ELECTRICAL RATING (MWo.Neti:

MAX. DEPEND. CAPACITY (MWe-GROSS:)

1I40 NONE

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

I

- 4. REASONS FOR RESTRICTION (IP ANYl:

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 0

0 0

6. REACTOR RESERVE SHUTDOWN HOURS..................

445.0 1047.8 1446.3

7. HOURS GENER ATOR ON LINE....................

0 0

0

8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH)..........1,403,500 3,251,500 4,465.128 459.410 1.084,070 1.511,000
10. GROSS ELECTRICAL ENERGY GENERATED (MWH)...
11. NET ELECTRICAL ENERGY GENERATED (MWH)
12. REACTOR SERVICE FACTOR...........

74.6%

80.4%

83.7%

13. REACTOR AVAILABILITY FACTOR,........
14. UNIT SERVICE F ACTOR,............................

66.2%

74.0%

77.9%

15. UNIT AVAILABILITY FACTOR.............
15. UNIT CAPACITY FACTOR (Using MDC)
17. UNIT CAPACITY FACTOR (Using Demgn MWe)
18. UNIT FORCED OUTAGE RATE......

- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MCNTHS (TYPE DATE. AND CURATION OF EACH):

Annual maintenance outage (M3) 4/15/85 for 60 days.

20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO CCMMERCIAL CPERATION):

FORECAST ACHIEVED INITI AL CRITICALITY -

INITIAL ELECTRICITY COMMERC!AL OPER ATION k

Generator Name Plate.1,231,/00 KVA 0 0.975 P.F.

he e, m a iss;;iz

y

.'e a

=

AVERAGE DAILY UNIT POWER LEVEL-4 DOCKET NO. 50-397 WNP-2 g

DATE 3/01/85 COMPLETED BY L.B. Hutchison TELEPHONE (509) 377-2501 ext. 2486

' MONTri February 1985 DAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0

1 -

0 37 0

2-495 18 0

3 964 19 4

0-999 20 2

1070

-5 21 413 M71 a

22 7

-1003 1031 23' 1079 g'

1068 24 --

950 1080

9 2s 1072 ja 1076 26-1074 11 27 1072 1077-12 1072'

~

m 13_

71 9 0

I 14 0

15

'~

0

- is -

l INSTRUCTIONS P wer leve in MWe-Net for each day in the repor:ing month. Compute to the car s w. e megawatt These figures will be.used to plot a graph for each reporting month. Nete that when maximum dependable capacity is used for the t:et electrical nting of the-unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be

footnoted to explain the apparent anomaly.

00 @ NO.

50-397 LNIT NAVE : WNP-2 DATE. 3/01/85 LNIT SHUTDOWNS / REDUCTIONS

.. COMPLETED BY L. B. Hutchison.

REPORT PERI 6 FEB 19 85 TELEPHONE (509). 377-2501 ext. 2486 -

mmth, year W E,M M N N: LER NUM3ER SYSTEN N. CAUSE & CuMMECTIVE ACTION TO FREVENT. FECUMGlT 85 1/31/85 F

119.47 A

3 85-007 EB RELAYX F Outage caused by_ inadvertent operation of a. unit lockout relay, was concluded a' fter modifications--

of relay to prevent future occurrences (see LER 85-007) 85-05 2/06/85 S

0.42 B

1 -

Tripped main generator via unit emergency' trip to verify revision of. relaying logic.-

85-06 2/13/85 F

107.15 G

3 85-016 CA INSTRU E Perturbation in ~RPV water level reference' and

'7( variable. legs as a result' of an ' error while-performing a-Tech Spec instrument surveillance 4

on a level trans'mitter resulted in a reactor.-

scram at 100% power. The plant was: returned t-to service.after a 4 day delay due to other unrelated problems (See LER 85-016),

I I

l SLM4ARY l

. TYPE REASON METHOD SYSTEM & COMP 0 TENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error-2-Manual: Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of-D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training Reduced Load Licensee Event Report 8

& License Examination 9-Other-(ER) File (NUREG-0161) 1

e o

,_l Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 p/

~/

March 6,1985 Docket No. 50-397 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

Subject:

NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for February 1985 as required by our Technical Specifications 6.9.1.6.

Very truly yours O. Mqrtin (M/D 927M)

JDM/pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A.D. Toth - NRC, WNP-2 Site l