y OPERATING DATA REPORT DOCKET NO. 50-397 UNIT WNP-2 3/1/85 DATE u W Son COMPLETED BY TELEPHONE (509) 377-2501 ext 2486 OPERATING STATUS ekuay M
- 1. REPORTING PERIOD:
GROSS HOURS IN REPORTING PERICO:
3323 1095
- 2. CURRENTLY AUTHORIZED POWER LEVEggi:
uAx. DEPENO. CAPACITY (MWe Net):
DESIGN ELECTRICAL RATING (MWo.Neti:
MAX. DEPEND. CAPACITY (MWe-GROSS:)
1I40 NONE
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
I
- 4. REASONS FOR RESTRICTION (IP ANYl:
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 0
0 0
- 6. REACTOR RESERVE SHUTDOWN HOURS..................
445.0 1047.8 1446.3
- 7. HOURS GENER ATOR ON LINE....................
0 0
0
- 8. UNIT RESERVE SHUTDOWN HOURS
- 9. GROSS THERMAL ENERGY GENERATED (MWH)..........1,403,500 3,251,500 4,465.128 459.410 1.084,070 1.511,000
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)...
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)
- 12. REACTOR SERVICE FACTOR...........
74.6%
80.4%
83.7%
- 13. REACTOR AVAILABILITY FACTOR,........
- 14. UNIT SERVICE F ACTOR,............................
66.2%
74.0%
77.9%
- 15. UNIT AVAILABILITY FACTOR.............
- 15. UNIT CAPACITY FACTOR (Using MDC)
- 17. UNIT CAPACITY FACTOR (Using Demgn MWe)
- 18. UNIT FORCED OUTAGE RATE......
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MCNTHS (TYPE DATE. AND CURATION OF EACH):
Annual maintenance outage (M3) 4/15/85 for 60 days.
- 20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO CCMMERCIAL CPERATION):
FORECAST ACHIEVED INITI AL CRITICALITY -
INITIAL ELECTRICITY COMMERC!AL OPER ATION k
Generator Name Plate.1,231,/00 KVA 0 0.975 P.F.
he e, m a iss;;iz
y
.'e a
=
AVERAGE DAILY UNIT POWER LEVEL-4 DOCKET NO. 50-397 WNP-2 g
DATE 3/01/85 COMPLETED BY L.B. Hutchison TELEPHONE (509) 377-2501 ext. 2486
' MONTri February 1985 DAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0
- 1 -
0 37 0
2-495 18 0
3 964 19 4
0-999 20 2
1070
-5 21 413 M71 a
22 7
-1003 1031 23' 1079 g'
1068 24 --
950 1080
- 9 2s 1072 ja 1076 26-1074 11 27 1072 1077-12 1072'
~
m 13_
71 9 0
I 14 0
15
'~
0
- is -
l INSTRUCTIONS P wer leve in MWe-Net for each day in the repor:ing month. Compute to the car s w. e megawatt These figures will be.used to plot a graph for each reporting month. Nete that when maximum dependable capacity is used for the t:et electrical nting of the-unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be
- footnoted to explain the apparent anomaly.
00 @ NO.
50-397 LNIT NAVE : WNP-2 DATE. 3/01/85 LNIT SHUTDOWNS / REDUCTIONS
.. COMPLETED BY L. B. Hutchison.
REPORT PERI 6 FEB 19 85 TELEPHONE (509). 377-2501 ext. 2486 -
- mmth, year W E,M M N N: LER NUM3ER SYSTEN N. CAUSE & CuMMECTIVE ACTION TO FREVENT. FECUMGlT 85 1/31/85 F
119.47 A
3 85-007 EB RELAYX F Outage caused by_ inadvertent operation of a. unit lockout relay, was concluded a' fter modifications--
of relay to prevent future occurrences (see LER 85-007) 85-05 2/06/85 S
0.42 B
1 -
Tripped main generator via unit emergency' trip to verify revision of. relaying logic.-
85-06 2/13/85 F
107.15 G
3 85-016 CA INSTRU E Perturbation in ~RPV water level reference' and
'7( variable. legs as a result' of an ' error while-performing a-Tech Spec instrument surveillance 4
on a level trans'mitter resulted in a reactor.-
scram at 100% power. The plant was: returned t-to service.after a 4 day delay due to other unrelated problems (See LER 85-016),
I I
l SLM4ARY l
. TYPE REASON METHOD SYSTEM & COMP 0 TENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error-2-Manual: Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of-D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training Reduced Load Licensee Event Report 8
& License Examination 9-Other-(ER) File (NUREG-0161) 1
e o
,_l Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 p/
~/
March 6,1985 Docket No. 50-397 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Subject:
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for February 1985 as required by our Technical Specifications 6.9.1.6.
Very truly yours O. Mqrtin (M/D 927M)
JDM/pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A.D. Toth - NRC, WNP-2 Site l
Ms. Dottie Sherman - ANI, Farmington, CT i