ML20115C709

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1985
ML20115C709
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/28/1985
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8504180513
Download: ML20115C709 (5)


Text

.

U * ;-

' OPERATING DATA REPORT rrN DOCKET NO; 50-348 DATE March 3, 1985-COMPLETED BY J. D. Woodard TELEPHONE (70s) agg-5156

- OPERATING STATUS Notes

- I' ' Unit'Name: J seph M.' Farley - Unit 1 February, 1985

.3 Reporting Pen. d.

1) Cumulative data since e

2652

- 3. Licensed Thermal Power (MWt):

12-1-77, date of 860-L 4. Nameplate Rating (Gross MWe):

commercial operatiori.

R29

5. Design Electrical Rating (Net MWe):

860.9-

6. Maximum Dependable Capacity (Gross MWe):

'816.5

7. Maximum Dependable Capacity (Net MWe):

- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

N/A-N/A

9. Power Level To Which Restricted. lf Any (Netge):
10.' Reasons For Restrictions. If Any:

This M$ nth Yr.-to-Date Cumulative 672 14r16 63.528

!!. Hours in Reporting Period 672.0 1416.0

-43,545.0

12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0

'13.1 Reactor Reserve Shutdown Hours

~

1416'.o 42,440.4

14. Hours Generator On.Line 672 O
15. Unit R'eserve Shutdown Hours 0.0
0. 0 -

0.0 1,782.144 3,755,232-107.6ss_807-

16. Gross Thermal Energy Generated (MWH) 578,406 1,222,436 34.316.750
17. Gross Electrical Energy Generated (MWH) 549,550 1,161,420 32.290.466
14. Net Electrical Energy Generated (MWH) 100.0 100.0 66.8
19. Unit Service Factor

.100.0 100.0 66.8

20. Unit Availability Factor -

100.2 100.5 63.7

. il. Unit Capacity Factor IUsing MDC Net) -

98.6 98.9 61.3

22. Unit Capacity Factor (Using DER Net) 0.0 0.0 12.8
23. Unit Forced Outage' Rate
24. Shutdowns Scheduled Oser Next 6 Months tType. Date,and Duration of Eacht:

Refueling / maintenance-outage, 4/5/85, approximately 5 weeks.

N/A

25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status iPrior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY.

08-06-77 08-09-77 08-20-77 08-18-77

=

. INITIAL ELECTRICITY 12-01-77 12-01-77 COMMERCIAL OPER ATION 8504180513 850228 ~

("/77 )

DR ADOCK 05000345 P DR,..

=,

O O

U,.

2.

UNITSilulDOWNS AND POWER RElHIC110NS DOCKET NO.

5'0-348 UNIT NAblE J.M. Farley - Onit 1-DA'IE March 5. 1985 REPORT Af0Niil February COMPl.ETED BY. J. D Woodard __

TEl.LPilONE (20s) 899-5156 e.

a

.$ 3

'h j$'5 Licensec

[v, h,

Cause i russective No.

Dale g

3g 2g5 Even 3, g pu

. Actiim so yE e@!

Repent #

u F

~~

=

to u Pscvens' Recussence o

6 THERL WERE NO UNI' rSHU FDOWNS Ol t SIGb IFICANT POWER REDUCTIONS DUR [NG THE M01FIH OF FEBRUARY.

I 2

3 4

1:: 17.ns ed Reason; hicehod:

Exhibis G -Instructions..

S: Stheduled A-Fquipmens Failure (Explain) 1 Alanual-

- for Pacparation of Data in Maintenance oiTest 2 Manual Scram.

Enity Sheces f n Iiccusee C Itefueling

3. Automatic Scram.

Eveni Repius (i.ER) File (NUREG-D Regidatosy Resisiccion 4 Oaher (Explain) 0161)

L-Opesator Trainingi license Examination F Adudaisitative 5

G Opesaliimal liasos (lixplain) 19/ e7)

II Othei (Explain) thinbit I Sanne Sou:ce

. DOCKIT NO.

50-348 I

. UNIT-DA7I March 5, 1985 J. D. Weodard COMPLETED SY TELEPHONE (205) 899-5156 February, 1985 410NTil DAY AVERAGE DAILY F0WER LEVEL DAY AVERAGE DAILY P0tVER !.EVEL 15tWe Net)

(51We Net) 820 g7 820 2-13 819-

~

3 824' 39 g,g 818 571

g 4

816 816 21 5

819 813 6

n 820 7

23 813 813 8

821

g 822 7
5-811 809

'V 10 821 26 818 812 7

820 12 2.3 816 13 820 3

820

. l4 30 821

);

15 823 II M UCDONS On this form::. list the sveruse d:ly unit puwer Icvelin AIWe Net for e:ch d:y in the reporting inonth. Campute to

, the ne:re.t whole me;sw,at, (997)

O-

r r

-JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1.

NARRATIVE

SUMMARY

OF OPERATIONS-FEBRUARY, 1985 There were no unit shutdowns or significant power reductions during the month of February.

The following major safety-related maintenance was performed in the month of February:

1.

Performed annual maintenance on IB diesel generator.

2.

Performed miscellaneous corrective and preventive maintenance on other diesel generators.

'k Malling Address Al;b m2 PowIr Comp 1ny 6CO North 18th Str.et Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6000 R. P. Mcdonald b

Senior Vice President Flintndge Building Alabar11a Nwer

..v..,1 March 11, 1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the February 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very tru y

(

R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) f6W

  • lo