' OPERATING DATA REPORT rrN DOCKET NO; 50-348 DATE March 3, 1985-COMPLETED BY J. D. Woodard TELEPHONE (70s) agg-5156
- OPERATING STATUS Notes
- I' ' Unit'Name: J seph M.' Farley - Unit 1 February, 1985
.3 Reporting Pen. d.
- 1) Cumulative data since e
2652
- 3. Licensed Thermal Power (MWt):
12-1-77, date of 860-L 4. Nameplate Rating (Gross MWe):
commercial operatiori.
R29
- 5. Design Electrical Rating (Net MWe):
860.9-
- 6. Maximum Dependable Capacity (Gross MWe):
'816.5
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
N/A-N/A
- 9. Power Level To Which Restricted. lf Any (Netge):
- 10.' Reasons For Restrictions. If Any:
This M$ nth Yr.-to-Date Cumulative 672 14r16 63.528
!!. Hours in Reporting Period 672.0 1416.0
-43,545.0
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 3,650.0
'13.1 Reactor Reserve Shutdown Hours
~
1416'.o 42,440.4
- 14. Hours Generator On.Line 672 O
- 15. Unit R'eserve Shutdown Hours 0.0
- 0. 0 -
0.0 1,782.144 3,755,232-107.6ss_807-
- 16. Gross Thermal Energy Generated (MWH) 578,406 1,222,436 34.316.750
- 17. Gross Electrical Energy Generated (MWH) 549,550 1,161,420 32.290.466
- 14. Net Electrical Energy Generated (MWH) 100.0 100.0 66.8
- 19. Unit Service Factor
.100.0 100.0 66.8
- 20. Unit Availability Factor -
100.2 100.5 63.7
. il. Unit Capacity Factor IUsing MDC Net) -
98.6 98.9 61.3
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 12.8
- 23. Unit Forced Outage' Rate
- 24. Shutdowns Scheduled Oser Next 6 Months tType. Date,and Duration of Eacht:
Refueling / maintenance-outage, 4/5/85, approximately 5 weeks.
N/A
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status iPrior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY.
08-06-77 08-09-77 08-20-77 08-18-77
=
. INITIAL ELECTRICITY 12-01-77 12-01-77 COMMERCIAL OPER ATION 8504180513 850228 ~
("/77 )
DR ADOCK 05000345 P DR,..
=,
O O
U,.
2.
UNITSilulDOWNS AND POWER RElHIC110NS DOCKET NO.
5'0-348 UNIT NAblE J.M. Farley - Onit 1-DA'IE March 5. 1985 REPORT Af0Niil February COMPl.ETED BY. J. D Woodard __
TEl.LPilONE (20s) 899-5156 e.
a
.$ 3
'h j$'5 Licensec
[v, h,
Cause i russective No.
Dale g
3g 2g5 Even 3, g pu
. Actiim so yE e@!
Repent #
u F
~~
=
to u Pscvens' Recussence o
6 THERL WERE NO UNI' rSHU FDOWNS Ol t SIGb IFICANT POWER REDUCTIONS DUR [NG THE M01FIH OF FEBRUARY.
I 2
3 4
1:: 17.ns ed Reason; hicehod:
Exhibis G -Instructions..
S: Stheduled A-Fquipmens Failure (Explain) 1 Alanual-
- for Pacparation of Data in Maintenance oiTest 2 Manual Scram.
Enity Sheces f n Iiccusee C Itefueling
- 3. Automatic Scram.
Eveni Repius (i.ER) File (NUREG-D Regidatosy Resisiccion 4 Oaher (Explain) 0161)
L-Opesator Trainingi license Examination F Adudaisitative 5
G Opesaliimal liasos (lixplain) 19/ e7)
II Othei (Explain) thinbit I Sanne Sou:ce
. DOCKIT NO.
50-348 I
. UNIT-DA7I March 5, 1985 J. D. Weodard COMPLETED SY TELEPHONE (205) 899-5156 February, 1985 410NTil DAY AVERAGE DAILY F0WER LEVEL DAY AVERAGE DAILY P0tVER !.EVEL 15tWe Net)
(51We Net) 820 g7 820 2-13 819-
~
3 824' 39 g,g 818 571
- g 4
816 816 21 5
819 813 6
n 820 7
23 813 813 8
821
- g 822 7
- 5-811 809
'V 10 821 26 818 812 7
820 12 2.3 816 13 820 3
820
. l4 30 821
);
15 823 II M UCDONS On this form::. list the sveruse d:ly unit puwer Icvelin AIWe Net for e:ch d:y in the reporting inonth. Campute to
, the ne:re.t whole me;sw,at, (997)
O-
r r
-JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1.
NARRATIVE
SUMMARY
OF OPERATIONS-FEBRUARY, 1985 There were no unit shutdowns or significant power reductions during the month of February.
The following major safety-related maintenance was performed in the month of February:
1.
Performed annual maintenance on IB diesel generator.
2.
Performed miscellaneous corrective and preventive maintenance on other diesel generators.
'k Malling Address Al;b m2 PowIr Comp 1ny 6CO North 18th Str.et Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6000 R. P. Mcdonald b
Senior Vice President Flintndge Building Alabar11a Nwer
..v..,1 March 11, 1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the February 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very tru y
(
R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)