OrkRAIING CATA REPORT 6

e 4.

  • e
  • ~

DOCKET NO. 50 - 352 DATE MARCH 15,1985-COMPLETED SY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION -

GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS 1.' UNIT NAME: LIMERICK UNIT 1 1 NOTES: UNIT 1 IS IN STARTUP ESTING. 1 I

i

. 2. REPORTING PERIO0s FEBRUARY, 1985 l

FACILITY OPERATING LICENSE I

't i

3. LICENSED THERMAL POWERIMWT):

165 i

NPF-27, ISSUED 10/26/04, RE-1 I

I

4. NAMEPLATE RATING (GROSS MWE) 1092 I.

STRICTS POWER LEVELS NOT TO I

l l

5. DESIGN ELECTRICAL RATING (NET MWE)*

1055 I

EXCEED 55 OF THE RATEQ POWER. I I

i

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWEls l

ELECTRIC OUTPUT PROM THE UNIT l e

i 1

7. MAXIMUM DEPENDABLE CAPACITY (NET MWEls I

WAS NOT YET ACHIEVED.

I S. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REP T GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY INET MWEls
10. REASONS FOR RESTRICTIONS IF ANY:

8504180527 850228 A

THIS MONTH YA-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 0

0 0

' 12. NUMBER OF HOURS REACTOR WAS CRITICAL 282.3 1,022.4 1,060.1

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR DN-LINE 0.0

__ _'O.0 0.0

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
13. GROSS THERMAL ENERGY GENERATED (MWHI 22,634 94,970 94,970
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0

0

18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0

~0

~19. UNIT SERVICE FACTdR 0.0 0.0 0.0

' 20. UNIT AVAILABILITY FACTGA 0.0 0.0 0.0

21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 0.0
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 0.0

'23. UNIT FORCED OUTAGE RATE 0.0 0.0 0.0

- 2h SHUTDOWS SCHEDULED OVER NEXT 6 MONTHS (TYPE 'OATE, AND DURATION OF EACH):

25. IF SHUT 00WN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPs

-23. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85

  • L

-t6 COMMERCIAL OPERATION 4RD QTR 85

/

0 DEPENDENT ON RECEIVING FULL POWER LICENSE.

J

' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 352 UNIT LIMERICK UNIT 1 DATE MARCH 15,1985 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH FEBRUARY 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

'(MWE-NET) 1 0

17 0

2 0

18 0

3-0 19 0

4 0

20 0.

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

14 0

15 0

16 0

l o

s t.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352

+

g UNIT NAME LIMERICK UNIT 1 DATE MARCH 15,1985 REPORT MONTH FEBRUARY, 1985 COMPLETED SY PHILADELPHI A ELECTRIC COMPANY 3

W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR'

' TELEPHONE t215) 841-5022

~

l l

i I

l METHOD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE

'l I TYPE I DUR A TION I RE A SON I SHUTT ING DOWN 1 EVENT l CODE I CODE-l ACTION TD i

NO.I DATE I (111 (HOURSil (2) i REACTOR (3) l REPORT #

-l-(4) l (5) l PREVENT RECURRENCE I

I

.I I

I I

I

'l i

I i

1 -

1 I

I I

I I

(1)

(2)

(33 (4)

F - FORCED

' REASON METHOD EXHIBIT G - INSTRUCTIONS 5 - SCHEDULED A - EQUIPMENT FAILURE (EXPLAINI 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - M ANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT ( LERI D - REGULATORY RESTRICTION.

4 - OTHER (EXPLAIN)

FILE (NUREG-01613 E - OPERATOR TRAINING + LICENSE EXAMIN ATION F - ADMINISTRATIVE (5)

G - OPERATIONAL. ERROR (EXPL AINI H - OTHERIEXPLAINI EXHIBIT I - SAME SOURCE.

4 1

9:

  • /.;

Docket No. 50-352 Attachment to Monthly r

Operating. Report for February, 1985 LIMERICK GENERATING STATION UNIT l February 1 through Februcry 31, 1985-I.'

Marrative' Summary of Operating Experiences 4

. Lime' rick Unit'l~ began the month ~in the hot' shutdown mode following a reactor scram on January 31, 1985.

Cold

-shutdown was ' achieved.on February 2, 1985.

On February.17, follow'ing a short outage to correct deficiencies-causing Licensee Event Reports, the plant entered the startup mode to continue low power (5%)

testing.

Final control ' tuning' was performed on the Reactor Core Isolation Cooling L(RCIC) and High Pressure Coolant Injection -(HPCI) Systems'.

On February 28, a Reactor. Core' Isolation Cooling (RCIC)~

System manual start and vessel injection were successfully completed.

Low power-(5%) testing was complete cnd a reactor shutdown was initiated.

II.

' Challenges to Relief Valves Du' ring the month, there were no challenges to the. main steam system' safety / relief valves.

SLZ' a.

a

n,

, _ _y,_

t---

..e - e

/

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (2151841-4000 March 15, 1985 Docket No. 50-352 Director

. Office of Resource Management US Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Limerick Generating Station Monthly Operating Report Gentlemen:

Enclosed is the monthly operating report for Limerick Unit 1 for the month of February, 1985 forwarded pursuant to Technical-Specification 6.9.1.6.

Very truly yours, e

R. II. Logue Superintendent Nuclear Services

' Attachment cc:

Director, Office of Inspection & Enforcement, USNRC (12 copies)

Dr.

T.

E. Murley, NRC Mr. Stan P. Mangi, PA Dept. of Envir. Resources Mr.

P. A.' Ross, NRC (2 copies)

INPO Records Center See Attached Service List ZE3*f

'lI

a s. :.- av-cc: -Judge Helen F. Hoyt Judge Jerry Harbour Judge Richard F. Cole Troy B. Conner, Jr., Esq.

Ann P. Hodgdon, - Esq.

Mr. Frank R. Romano Mr. Robert L. Anthony Ms. Phyllis Zitner Charles W. Elliott, Esq.

Zori G. Ferkin, Esq..

Mr. Thomas Gerusky Director, Penna. Emergency Management Agency Angus Love, Esq.

David Wersan, Esq.

Robert J. Sugarman, Esq.

Martha W. Bush, Esq.

Spence W.

Perry, Esq.

Jay M. Gutierrez, Esq.

Atomic Safety & Licensing Appeal Board Atomic ~ Safety & Licensing Board Panel Docket & Service Section (3 Copies)

James Wiggins Timothy R. S. Campbell January 16, 1985

__. - -... _..