m
~'$
a t
VIRGINIA POWEP. COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH February YEAR 1985 APPROVED:
N l
SE2+
8504180588 850228 PDR ADOCK 05000338 R
(
7.
- n e
+
OPERATING DATA REPORT DOCKET NO. 50-338 -
DATE 03-06-85 COMPLETED BY Joan N. Lee-TELEPHONE (703) 894-5151 X252 u
OPERATING STATUS
~
{'2 1.
Unit Name:
North Anna 1 2.
Reporting Period:
February, 1985 L3.. Licensed Thermal Power (Wt):
2775
!4.
Nameplate: Rating-(Gross MWe):
947 5.
. Design Electrical Rating (Net MWe):
907
- 6. -Maximum Dependable Capacity (Gross NWe):
937 7.
Maximum Dependable Capacity (Net NWe):
890
- 8. :If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reason, N/A 9., Power Level To Which-Restricted, If Any (Net NWe):
N/A 10.: Reasons For Restrictions, If Any.
N/A This Month Yr.-to-Date Cumulative
- 11.. Hours In Reporting Period 672 1416 58,644
~12.
Number of Hours Reactor Was Critical.
672 1416 39,787.7 113.'-Reactor Reserve Shutdown Hours 0
0 3,084.2 14.-
Hours Generator On-Line 672 1388.8 38,501.0-
- 15. Unit Reserve Shutdown Hours.
0 0
0-
- 16. -Gross Thermal Energy Generated (MWH) 1,818,107 3,793,111 100,657,773
-17.
Gross Electrical Energy Generated (MWH) 615,814 1,284,152 32,656,337-J18.. Net Electrical Energy Generated (MWH).
585,498 1,220,800 30,836,778
- 19. Unit Service Factor 100.0 98.I 65.6
- 20. Unit Availability Factor 100.0 98.0 65.7 121.- Unit Capacity Factor (Using MDC Net) 97.9 96.9 58.7:
22.'. Unit Capacity Factor (Using DER Net) 96.1 95.0 57.6 23 '. Unit Forced Outage Rate 0
1.9 13.0,
- 24. -Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
1 (25. -If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. l Units In Test Status (Prior to Commercial Operation):
Forecast Achieved
. INITIAL CRITICALITY j^
INITIAL ELECTRICITY
. COMMERCIAL OPERATION
....... x.
_-.,...,--__,.._.___.._.._.-__.a...__.
e AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-338 UNIT NA-1 DATE 03-06-85 COMPLETED BY Joan N. Lee TELEPHONE 703-894-5151X252' MONTH February, 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 895 17 898 2
882 18 897 3
896 19 881 4
893 20 894 5
895 21-886 6
895 22 888 7
896 23 824 8
893 24 810 f
9 893 25 804 10 897 26 846 11 896 27 887 12 896 28 568 13 895 29 14 895 30 15 897 31 16 899 i
INSTRUCTIONS On this format,. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
.l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-338 UNIT NAME North Anna 1 DATE 03-06-85 REPORT MONTH Februa ry, 1985 COMPLETED BY Joan Lee TELEPHONE (703) 894-5151 X2527.
l 2
No.
Date Type Duration Reason Method of Licensee System Component Cause &' Corrective (Hours)
Shutting Event Code Code Action to 3
4 5
Down Reactor Report #
Prevent Recurrence Ramped down for Load following.
85-01 850202 S
H 5
Unit returned to 100% power.
85-02 850219 S
H 5
Ramped down for load following.
Unit returned to 100% power.
85-03 850223 S.
H 5
Ramped down for load following.
Unit returned to full power.
85-04 850224 S
H 5
Ramped down for load following.
Unit returned to full power.
Ramped down for load following.
85-05 850224 S
H 5
Unit returned to 100% power.
85-06 850226 S
H 5
Ramped down for load following.
Unit returned to 100% power.
4 1
2 3
Exhibit F - Instructions F: Forced Reason:
Method:
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 K-Other (Explain)
Exhibit H - Same Source
- s.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-338-UNIT NAME North Anna 1 DATE 03-06 REPORT MONTH February, 1985 COMPLETED BY.
Joan Lee TELEPHONE (703) 894-5151 X2527 l
2 Ms.
Date Type Duration Reason Method of Licensee System Component Cause_& Corrective (Hours)
Shutting Event Code Code Action to 3
4; 5
Down Reactor Report #
Prevent Recurrence Ramped unit down to 30% power 85-07 850228 F
A 5
due to secondary Chemistry problems caused by condenser' tube leaks. Ended this month with unit at 30% power.
1 i
l i
1 2
3 4
F: Forced Reason:
Method:
Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File i
D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error:(Explain) 5 H-Other (Explain)-
Exhibit H - Same Source e
1
.S Page 1
of
-1 4
UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO.
50-338 REPORT MONTH February UNIT NAME NA-1 YEAR
'1985 DATE 03-06-85 COMPLETED BY Joan Lee
- No entries this month.
m 9
o 4
ev,,. -
.e
-.-e,,,-w...,e, y,
--e e-
C:
VIRGINIA POWER-NORTH ANNA POWER STATION' UNIT NO.
1 NONTH. February
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating
~
experiences for this month which required load reductions or resulted in-significant non-load related incidents.
DATE TIME DATA February 1, 1985' 0000 Began this month with Unit I at 100% power.
February 2, 1985-0116 Commenced Rampdown to approximately 840 MW for Turbine Valve Freedom test.
0216 Stabilizing at 850 MW. 90% power.
0450 Competed Turbine Valve Freedom test.
Commenced ramp up to 100%.
0540 Stabilized at 98% for estorimetric.
0600 calorimetrie complete - unit at 100%
power.
February 19, 1985 0021 Commenced rampdown to 850 MW for load following.
l 0055 Continuing rampdown to 750 MW for load l.
following.
l-0203 Commenced increase approximately 15 - 20 MW 0215 Stabilized power at 800 MW. 88% power.
0221 Commenced ramp up to 850 MW. 90% power.
0229 Gassed Vet 0403 Unit I to 100% power.
l-23, 1985 0026 Commenced Rampdown for load following February L
0124 Unit at 77% - 750 MW
\\
0130 Stabilized power at 75%.
730 MW per System Operator.
I f-
VIRGINIA POWER NORTH ANNA POWER STATION UNIT NO.
1 MONTH
'Februa ry
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DATE TIME DATA February 23, 1985 0215 Commenced rampdown of another 100 MW per
' System Operator 0252 Stabilized power to 640 MW. 68% power..
0542 Commenced ramp up to 100% per System Operator.
0657 Stabilized power at 90% 'for ~ calorimetric.
0719 calorimetric complete.
0805 Unit 1 at 100% power.
g
- February 24, 1985 0104 commenced rampdown for load following Approximately 200 MW.
0207 Unit at 764 NW continuing rampdown to 640 MW per System Operator.
0254 Stabilized at 640 MW - 67% power.
0658 Commencing ramp up to 100% power 0803 Unit at 87% - 822 MW 0830 Stabilized power at 90% for calorimetric.
0912 calorimetric complete. Unit I at 100%
power.
2235 Commenced rampdown to 640 MW for load following.
February 25, 1985 0054 Stabilized power at 650 MW - 68% pcwer per System Operator.
2
r :'
-9 VIRGINIA POWER NORTH ANNA POWER STATION UNIT NO.
1 MONTH- 'Februa ry
SUMMARY
OF OPERATING EXPERIENCE, Listed.below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load.related incidents.
DATE TIME DATA February 25, 1985_
0600 Commenced ramp up to 100% power.
0753 Stabilized power at 90% for. calorimetric..
0901 calorimetric complete. Unit at 100% power.
February 26, 1985 0006 Commenced rampdown of 200 MW for load Following.
0123 Stabilized power at 78% - 735 MW 0500 Commenced ramp up to 100%
0707 Stabilized power at 98% for calorimetric.
0723
.CalorimetricJ complete. Unit at 100%
power.
Febrauray 28, 1985 1106 Commenced ramping Unit down to 30% due to secondary Chemistry problems.
1411 Unit 1 at 30% power.
2400 Ended this month with Unit I at 30%
power.
3
n OPERATING DATA REPORT-DOCKET NO.
50-339 DATE.
03-06-85 COMPLETED BY Joan N. Lee TELEPHONE (703) 894-5151 X252 OPERATING STATUS Notes:
-1.
Unit Name:
North Anna 2 2.
Reporting Period:
February, 1985 3.
Licensed Thermal Power (MWt):
2775
- 4. -Nameplate Rating (Gross MWe):
947
~
c5.
Design Electrical Rating (Net MWe):
907 6.
Maximum Dependable _ Capacity (Gross NWe):
939 7.
Maximus Dependable Capacity (Net MWe):
890 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reason N/A
'9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
~
1. Reasons For Restrictions, If Any:
N/A 0
This Month Yr.-to-Date Cumulative l
- 11. Hours In Reporting Period 672 1416 36,912
- 12. Number of Hours Reactor Was Critical 672 1416 27,206.4 l
13.
Reactor Reserve Shutdown Hours 0
0 3,985.8 L
- 14. Hours Generator On-Line 567.8 1311.8 26,716.9
- 15. Unit Reserve Shutdown Hours 0
0 0
l.
- 16. Gross Thermal Energy Generated (MWH) 1,328,924 3,392,260 68,892,501 17.
Gross Electrical Energy Generated (MWH) 436,557 1,132,553 22,829,818
- 18. Net Electrical Energy Generated (MWH) 412,077 1,074,469 21_A43.731 l
19.
Unit Service Factor 84.5 92.6 72.4
- 20. Unit Availability Factor 84.5 92.5-72.4 l
- 21. Unit Capacity Factor (Using MDC Net) 68.9 85.3 65.9
- 22. Unit Capacity Factor (Using DER Net) 67.6 83.7 64.6
- 23. Unit Forced Outage Rate 15.5 7.3 12.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved l
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
m~
y-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-339 UNIT NA-2 DATE 03-06-85 COMPLETED BY Joan N. Lee TELEPHONE 703-894-5151X252 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWe-Net)
(NWe-Net) 1 883 17 844 2
887 18 881 3
887 19 883 4
405 20 883 5
0 21 884 6
0 22 894 7
0 23 891 8
0 24 893 9
197 25 865 10 457 26 894 f
11 882 27 891 12 842 28 883 l
I 13~
494 29 14 210 30 15 209 31 16 219 INSTRUCTIONS On this format, list the average daily unit power level in NWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l c
m_
e
, - - - - + - --
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-339 UNIT NAME North Anna 2 DATE 03-06-85 REPORT MONTH February-COMPLETED BY Joan Lee TELEPHONE (703) 894-5151 X2527,
l 2
Ms.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours)
Shutting Event Code Code Action to 3
4 5
Down Reactor Report #
Prevent Recurrence 85-03 850204 F
104.2 A
5 Ramped Unit 2 off liae due to tube rupture in 'C' water box (S/G Chemistry problems).
i Repairs made and Unit 2 returned to full power.
1 i
85-04 850212 S
H 5
Ramped down for load following.
Unit returned to full power.
85-05 850213 S
A 5
Commenced Unit 2 rampdown due to j
secondary Chemistry problems. 'C' waterbox out of service. Repairs made. Unit returned to full pover.
85-06 850225 S
H 5
Ramped down for load following.
Unit returned to full power.
Ended this month with Unit 2 at il 100% power.
j 1
2 3
4 l
F: Forced Reason:
Method:
Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other j
G-Operational Error (Explain) 5 H-Other (Explain)
Exhibit H - Same Source 9
p.
~s Page 1
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO.
50-339 REPORT MONTH February UNIT NAME NA-2 YEAR 1985 DATE 03-06-85 COMPLETED BY Joan Lee 85-03 F
'(1)
On February 4, 1985 at 1544 Unit 2 was ramped off line due to tube rupture in 'C' waterbox (S/G Chemistry problems).
Repairs made. and Unit 2 returned on line February 8. 1985 at 2347.
O
^
4
~
O VIRGIPIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO.
2 NONTH February
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DATE TIME DATA February 1, 1985 0000 Began this month with 100% power.
February 4, 1985 0610 MW decreasing - Vacuum decreasing. Suspect
'C' waterbox (tube rupture) investigating.
0625 Placed h'ogger in service ramped down
~
approximately 3%.
0630 Commenced flooding 'C' waterbox.
0640 Unit at 98% power - 862 MW 0850 Commenced rampdown to 30% power due to S/G Chemistry problems.
1110 Stabilized power at 30% - 230 MW 1445 Commenced ramping Unit 2 off line due to S/G Chemistry problems.
1544 Unit 2 off line.
February 8, 1985 1242 Latched turbine 1258 Turbine at 1800 RPM 2333 Unit 2 in Mode 1 2347 Unit 2 on line February 9, 1985 0039 Stabilized power at 30% for chemistry hold.
30% - 249 MW.
February 10, 1985 1205 Commenced ramp up to 100%
1 e
-TJ VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO.
2 MONTH February
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence:is a summary of operating experiences for this month which required load reductions or resulted in signific.ent non-load related incidents.
t DATE TIME DATA February 10, 1985 1505 Stabilized power at 75% - 700 W 1713 Holding power at 90% for start-up of 2H,EDG.
1726 Re-commenced power increase to 100%
1916 Unit 2 at 100% power.
February 12, 1985 0005 Commenced rampdown of 200 W for load following.
0117 Stabilized power at 785 W. 75% power.
0450.
Commenced ramp up to 100% power.
0610 stabilized power at 98% for calorimetric.
0740 calorimetric complete - Unit at 100% power.
February 13, 1985 0809 Commenced Unit 2 rampdown due to secondary Chemistry problems 'C' waterbox out of service.
0955 Stabilized power at 50% - 515 W.
1320 Commenced rampdown to 30%.
i 1415 Stabilized power at 30% - 208 W.
f,.
February 16,,1985 2345 Commenced ramp up to 100% power.
L February 17, 1985 0023 Unit 2 at 62% power 540 W.
0235 Stabilized power at 90% for calorimetric.
f 0310 calorimetric complete. Commenced ramp up to 100% at 3% per hr.
2
c.
10 4
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO.
2 MONTH February
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DATE TIME DATA February 17, 1985 0430 Unit 2 at 100% power.
February 25, 1985 0110 Commenced Unit 2 rampdown for load following 0238 Stabilized power at 82% - 800 MW 0530 Commenced ramp up to 100% power.
0611 Stabilized power at 90% for calorimetric.
0635 calorimetric complete. Commenced ramp up to 100%.
0644 Unit at 100% power.
February 28. 1985 2400 Ended this month with Unit 2 at 100% power.
3
U
..etavistr==r
- mlurcpe,ororsapur, r r
_ l :EYa$siora MfR*l-g mant virginia 23Le f
March 15, 1985 wweemmaroeuen
- Mr. Maurice R. Beebe Serial No.85-182
' Office of Resource Management' N0/JHL:acm U. S.-Nuclear Regulatory Commission Docket Nos. 50-338 Washington, D. C. 20555 50-339 License Nos. NPF NPF-7
Dear Mr. Beebe:
Enclosed is the Monthly Operating Report for North Anna Power Station Unit Nos. I and 2 for the month of February, 1985.
Very truly yours,
( 'n N
W. L. Stewart Enclosure-(3 copies) cc:
Mr. J..M. Taylor, Director (12 copies)
-Office of Inspection and Enforcement Mr.- J. Nelson Grace (1 copy)
Regional Administrator Region II Mr. M."W. Branch NRC Resident Inspector North Anna Power Station i
I E 2. Y
!/o