, j; OPERATING DATA REPORT ~
DOCKET NO.
50-263______
DATE-3 i-85____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 QPERATING STATUS INotes i
- 1. Unit Name : ________________________MonticeLto l
l
~2. Reporting period: ___________________ FEBRUARY-1 l
- 3. Licensed Thermal Power (MWt): ____________1670 1
1 4.LNamepLate Rating (Gross ~MWe):
_____________569 1
1.
- 5. : Design Electrica L Rating (Net MWe): _____545.4 l
l
-6.EMaximum Dependable Capacity (Gross MWe):.__564 1
l 7.0 Maximum Dependable Capacity (Net MWe): ____536 l__________________________l-
- 18. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give~ Reasons:
'9.' Power-Level To Which-Restricted, If Any (Net'MWe): ___N/A___________________
- 10. Reasons For Restrictions, If Any: __N/A________*_____________________________.
This, Month Yr.-to-Date Cumulative i
ii. Hours In Reporting Period
_____672
_____i 416
____119809 4
12; Number Of Hours Reactor Was Critical
___672.0
___ 990.5
__.90905.9
- 13, Reactor Reser va Shutdown Hours
_____0.0
______0.0
_____940.7 14.-Hours Generator On-Line
..__672. 0 ^
___ 925.6-
__ 88928.6
- 15. Unit l Reserve Shutdown Hours
_____0.0
.______0.0
_______0.0 16.. Gross Thermal Energy Generated (MWH)
_1110492
_ 1450735
_142684549 17.: Gross Electrical Energy Generated (MWH) __382240
__ 498677
__45683730 L
.18.- Net Electr ica l Energy Generated (MWH)
__368512
__ 477809
__43652692 19.Junit Service Factor
__100.0%
___ 65.4%
____-74.2%
- 20. Uni t Ava i lab i li ty Factor -
- __100.0%
___ 65.4%
____ 74.2%
~21. Unit Capacity Factor (Using MDC Net)
__102.3%
___ 63.0%
____ 68.0%
=22. Unit Capacity Factor"(Using DER Net)
__100.5%
___ 61.9%
____ 66.8%
'23. Unit Forced Outage Rate 0.0%
0.4%
5.2%
, 24.. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- 25. If-Shut.Down At End Of Report Period, Estimated Dat'e Of Startup:____________
- 26. Units In Test-Status (Prior to Commercial Operation): N/A
' Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION DR ADOCK 05000263;-
P24 8504180592 850228 PDR l
?!
1
- - c.
- *'*
AVERAGE DAILY UNIT POWER LEVEL DOCK ET ' NO.
50-263______
UNIT 'Monticello__
DATE.
3-1-85____
COMPLETED BY A. L..Myrabo l
' TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______-
j DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
__________553____________
17
__________554____________.
i 2
__________555____________
18
__________555____________
3
__________552____________
49
__________555____________
1 I
4'
__________551____________
20
__________555____________
5
__________553____________
21
__________553____________
'6
__________519____________
22
__________556____________
7
__________557____________
23
__________457____________
8
__________553____________
24
__________545____________
i 9.
.__________554____________
25
__________557____________
10
__________553 26
__________547____________
11
__________554____________
27
__________553____________
12
__________555_________.___
28
__________553 13
__________555____________
29 14
__________553____________
30 Lis
__________554____________
31 16
__________546____________
INSTRUCTIONS-On this. format, _ List the average daily ynit power Level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
d
-, e e,r,,
,.,. * ~ -
,y
.-v
<1
~
U ' i * * *;
- NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE l
i DOCKET NO.
50-263______
DATE 3-1-85____
COMPLETED BY A..L.
Myrabo
-TELEPHONE 612/295-5151 MONTH ______ FEBRUARY _______
2-1-85 to Power Operation.
2-28-85 SPENT FUEL STORAGE UPDATE Fuel assemblies in core 484 Fuel assemb Lies in spent fuel storage pool 952 Licensed capacity 2237 Date of'Last refueling that can be 1995 discharge with present capacity Note: Power operation defined as essentially 100% of rated power except for weekend Load drops for speci fied survei L Lance test ing.
4 DOCKET NO. 50-263 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME haticello DATE 1-85 COMPLETED BY A. LU Mvr=hn REPORT MONTH FEERUAR_Y TELEPHONg 612/295-5151 l
i ce 3
s=
8
. -rgo E%
Cause & Correceive
.=I =
E y EX ls.censee No..
Date 3-5E 4
.355 Esens s?
~5?
Auion to.
d3 5
~ 5. g Repaws =
nb
.E '
Prevent RecuracA'e. -
v e
- d NONE I
2 3
4 Method:
l Exhibis G. Instructions F: Forced Reason.
I-Manual for Psepasasiam of Data S: S.:hedaded A-Equipsnent FailureIExplaint Bataintenance of Tes 2-mnual Scram.
Ensey Sheeis for Licensee 3-Automatic Scram.
Event Repews ILER) File (NUREG-C. Refueling D.Regulatiny Restriction 4 Other (Explain) 0161)
E.Operstar Training i License Examinasiam 5'
F.AJnunistrative Exhibis 1 - Same Simree G Operatismal Esso IExplaial 19!77) iI Oiher (Esplaini
T"U l
..xm
'l
~
OPERATING-DATA REPORT-REVISION ONE DOCKET NO.
~50-263______
'DATE 2-5-8 5L___
COMPLETED BY A. L. Myrabo TELEPHONE 412/295-5151 E
LOPERATING STATUS.
INotes 1
.i. Unit Name : ________________________Monticalto i
I
. arting period: ___________________ JANUARY.
I i
- 3. Licensed Thermal Power (MNt): ____________1470 l
1
- 4. Namep late Rat ing (Gr'oss hWe): _____________569 i
'l
-5.. Design Electrical Rating (Net NWe): _____545.4 i
I L
- 6. Maximum Dependable Capacity (Gros : MWe): __564 l
I
- 7. Maximum Dependable Capacity (Net-MWe): ____536 l__________________________l
- 8. If Changes 0ccur_in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: __ Low pressure turbine wheels removed in 1982 were replaced in the 1984 refueling outage.
Capacity returned to normal _____
- 9. Power Level To Which Restricted, If Any (Net MWe): ___N/A___________________
- 10. Reasons For Restrictions, If Any:
__N/A_____________________________________
i i
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
_____744
_____ 744
____119137
- 12. Number Of Hours Reactor Was Critical
___318.5
.___ 318.5
__-90233.9
- 13. Reactor Reserve Shutdown Hours
_____0.0
______0.0
_____940.7-14.: Hours Generator On-Line
___253.6
___ 253.6
__ 88256.6
- 15. Unit-Reserve Shutdown Hours
_____0.0
______0.0
_______0.0
- 16. Gross Thermal Energy Generated (MWH)
_ 340243 340243
_141574057
- 17. Gross' Electrica L Energy Generated (MWH) __116437
__ 116437
__45301490 i:
18._ Net Electrical Energy Generated.(MWH)
__109297
__ 199297
__43284180
~f l.
- 19. Unit Service Facto'r
__ 34.1%
___ 34.1%-
____ 74.1%
- 20. Unit Availability Factor
__ 34.1%
___ 34.1%
____ 74.1%
- 21. Unit Capacity Factor (Using MDC Net)
.__ 27.4%
___ 27.4%
____ 68.3%l
- 22. Unit Capacity' Factor (Using DER Net)
__ 27.5%
___ 27.5%
____ 68.0%
23.' Unit Forced Outage Rate 1.6%
1.6%
5.3%
'24.' Shutdowns. Scheduled Over Next 12 Months (Type, Date, and Duration of'Each) p
- 25. If-Shut Down At End Of Report Period, Estimated Date Of Startup:____________
l
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved l
INITIAL' CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION r
i l
f wv
-+w-t
Ip
. ~ '
Northem States Power Company 414 Ncollet Mall Minneapolis, Minnesota $5401 Telephone (612) 330-550o March 7, 1985 Director, Office of Resource Management U S Nuclear Regulatory Commission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report Feb ruary, 1985 Attached are tvcive copies of the Monthly Operating Report for February,1985 for the Monticello Nuclear Generating Plant.
Also attached is Rn. vision one to the January, 1985 Monthly Operating Data Report.
g David Musolf Manager of Nuclear Su ort Services
\\
DMM/MMV/ dab c: Regional Administrator-III NRC NRR Project Manager, NRC NRC Resident Inspector MCA ggGYp gG Attn J W Ferman gj Attachment 9ts 4 31 titC Cod
[
'[ /