Initial Part 21 Rept Re ABB Pneumatic Timers in Control Circuits for EDG Svc Water Pumps & Reactor Bldg Cooling Fans Exhibiting Early time-out.Significant Disagreement Exists Between Util & Vendor Over Testing Requirements
ML20115C715
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/13/1992
From:
ENTERGY OPERATIONS, INC.
To:
NRC
References
REF-PT21-92 NUDOCS 9210200052
Download: ML20115C715 (1)


Text

_ _ _ - - -

- - - - ~ ' ' ' ' ' ' ' ' _ _ _ - _ _ _ _ _ - - - - - - - - - - -

's

  • r Datn October 13, 1992 NRC Operations Center Arkansas Naclear One b$

+jset:

10CFR21 Initial Notification b v.

$.c -

snaas Nuclear One pre;;.u.ced from ABB model ITE62-L colid state relays for A

use as replacements for-existing pneumatic timers in control circuits for Emergency 1;iesel Generators,. Service : Water pumps and Reactor Build.ine g

Cooling fans.

One purchase order favoked ANSI C37.90.1.

Duri a

-Q post-installation testing of the modification to the Reactor Buildi.-

v '-

coolet fan controls, oue t4mer exhibited an early - time sut.

It wai returned to the manu'actures testing but tb> c mm of its failure could not be determined.

ANO ret.-

1 several ether e.eieys of this model which g,s were tested by ABB.

These es reveales that th time period for relay actuation was influenced by _ the presence Oad M.ition-ofnoise from-induc tive load evitching.

Pecat.se of the un} r,aictability of the timer setpoints, c i ty in the presence of relay switching that can occur ou 4:

tb DC syo,

'hilm - the relays are timing (such as during saf-ty system on sation), a substantial safety hazard could have been created by tha

. h argency Diesel Generstc ra being overloaded had these timing rolsys been instr.11ed.

Relays of this model are currently instaCed in Unit 1 RB Cooling Fan controls; however, this particular application 'h.m been evaluated am* determined not' to cause a safety - concern.

There is a significant disagre.ement between Ano and the vendor - over the testing -

4 requirements regarding naise-immunity and surge withstand capability for acceptability per the ANSI specification, It is AN0's position that the ABB Model ITE62-L timer relays departed from s

the technical requirements of a procurement document in that they faf, ad to-g A

repecability standards s stablished in ANSr.C37.90.1..Tha departuta tant

[y court!tuted a defect in that. a substantial safety hazard could have been created by installation and use of these relays.

Therefore, this conoition is reportabis per 10CD21 aad apyrcpriate documentation wil.)

follow.

For additional information regarding - this report, contac.t Dick Scheide at 501-964-8618.