Proposed Tech Specs Re Emergency Diesel Fuel Oil Storage Requirements
ML20115C832
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/09/1992
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20115C815 List:
References
NUDOCS 9210200104
Download: ML20115C832 (27)


Text

_

o .

A1TACHMENT (1)

UNIT 1 TECIINICAL SPECIFICATION REVISED PAGES 3/4 7-36 3/481 3/48-3 3/4 8 6 3/48-7 B3/48-1

$$h02SSo0k N'b k7 P

y rq A -a" 3/4.7- PLANT SYSTEMS' SURVEILLANCE REQUIREMENTS -(Continued)~

3. Verifying that each high pressure pump starts (sequentially) to maintain the Fire Suppression Water System pressure t 80 psig.
g. At least once per REFUELING INTERVAL by: (1) performing a flow test of the system in accordance with Chapter 5. Section 11- of the Fire Protection Handbook, 14th Edition, published by the-National Fire Protection Association, and (2) perfonning a system-functional test which includes simulated automatic actuation of-the system throughout its operating sequence and cycling each valve in the flow path that is not testable during plant operation throuC at least one complete cycle of full travel.

4.7.11.1.2 The fire pump diesel engine shall be demonstrated OPERABLE:

a. At least once per 31 days by verifying:
1. The diesel fuel oil day storage tank contains at least 174 gellons of fuel, and --
2. The diesel starts from ambient conditions and operates for at least 30 minutes. This test shall be performed on e STAGGERED TEST' BASIS with the test required by Specification 4.7.11.1.1.b.
b. At least once per ~ biys by verifying that a sample of diesel fuel from the fuel stvage tank, obtained in accordance with .

ASTM-D270-65,-is withi :% acceptable limits specified in -

Table 1 of ASTM 0975 / hen checked for. viscosity, water and sediment. F/ ,

c. .At least once per 18 months by: ,
1. Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's-recommendations for the class of service, and-
2. Verifying the diesel starts from ambient conditions.on the auto-start signal and operates for 1'20 minutes while loaded -

with the fire pump.

.k CALVERT CLIFFS - UNIT 1- 3/4 7-36 AmendmentNo.gg _

3/4.8 ELECTRICAL POWER SYSTEMS

{ 3/4.8.1 A.C. SOURCES Operating LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite transmission aetwork and the onsite Class IE Distribution System consisting of either:
1. Two 500 kV offsite power circuits, or as necessary
2. The 69 kV SMECO offsite power circuit described in the January 14, 1977 Safety Evaluation and one 500 kV offsite power circuit; -

and -

b. Two separate and independent diesel-generators (one of which may be a swing diesel generator capable of serving either Unit 1 or Unit 2) with: A c;ld

( 1. aratehfue anks containing a minimum volume of 375 gallons of fuel for each diesel generator, av

2. A queo Q Stora ibdependent l AA/ storage-ta..a cach e6da ge SyJ+.tyLgonsisting ning 6 kJnimdm v0 umc ;f

~

I =

y $ g_g- IM50 gal _lons of feel , tad e s - - - u _i- t

3. A mrate fuel transfer pumo for each diesel generator.

APPLICABILITY: H0 DES 1, 2, 3 and 4.

ACTION:

a. With two offsite circuits of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unless the diesel -generators are already operating. Restore at least two 1

(I.

CALVERT CLIFFS - UNIT 1 3/4 8-1 AmendmentNo.%$$

INSF.itT A (for Technical S >ecification i 3.8.1.1.b.2)

n. No. 21 Fuel Oil Storage Tank containing a minimur. volume of 74,000 gallons of fuel oil, and
b. No.11 Fuel Oil Storage Tank containing a minimum volume of 32,000 gallons of fuel oil, and

3/4.8 ELECTRICAL MWER SYSTEMS

(~ LIMMING CONDITION FOR OPERATIOM (Continued) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be it, at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least two diesel generators to OPERABLi status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

n n- -

w

f. Wi thane-Di es el-fuel-O H-S t orage-T an k-inoperabl e;-d emons tra t e-the

('mv OPERABIHTY-of-the-remaining tank-by4--1)-perforsing+trve444ance (

/ Sp/ ace. W.cqui reme n t-4,8 rirh 2 rad-( v erffying-36,500-g all ons )-wthin-one hour-and--at-least-once per-8-hours tMfBTftW7 and-2) Tertfying. 1' 6 46 .

. wgg 3 the flowpath-from-the-OPERASLE-fuel-ofi - iterege-tank-to-the- I ciesel-generators within-one-hourr-Restore-two-storage-tankt-to-

-OPERAELE-status within 22 hour2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />s-or-be-4n-at-Isast-HOT-STANDBY- l l

  • ithin-the-next-6-hours and in c0tn3HIROWlLWithin the-fo14cwing 30-haun.--(tv)Tfr-!f tM tInk-ft-ino v ga14en atternatu-fuel soune onstter)perable -maint44n-an-8,000- i l

Th14-ACTION-Statement-is-not-app 1'exhle for the following.

.cond i t i on t :--1)--wh aHH-Diese l-fuel--Ott-S tora ge-Tan k-is tooperabWuring-the-period-from-Apr tt-i-through-Septembe. .due to-the-higher probabtitty of-turnado occurrences-during-this time frame-and-2)-when-two-DtE5Et Fuei oli storage lanks are inoperable f. TION-statement-e-is-applicable-for-these gg conditions,-

/MS f TNS(RTd m~~

SURVEILLANCE REQUIREMENTS

.x 4.8.1.1.1 Each requireJ independent circuit between the offsite transmission network and the orsite Class 1E Distribution System shall be:

a. Demonstrated OPERABLE, as follows:
1. For each 500 kV offsite circuit, at least once per 7 days by verifying correct breaker alignments and indicate 1 power availability.

i l

(

CALVERT CLIFFS - UNIT 1 3/4 8-3 AmendmentNo.Jgd

1 INSERT 11 (for Technical Specificatian 3.8.1.1 Action f.)

With No. 21 Fuel Oil Storage Tank inoperable, during the period from:

1. Qgtober 1 to March 31, demonstrate the OPERAlllLilT of No.11 Fuel Oil Storage Tenk by: 1) performing Surveillance Requirement 4.8.1.1.2.a.2 (verifying -

74,(XX) gallons) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and 2) verifying the flow path frc.n No.11 Fuel Oil Storage Tank to the dicsci g4 .ierators with'a one hour. Restore No. 21 Fuel Oil Storage Tank to OPERAllLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least IlOT STANI]I!Y within 'hc next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLI) SIIUTl)OWN-within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

2. April 1 to September 30. demonstrate the Ol'ERAllllJIY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a witnin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least onec per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. Restore No. 21 Fuel Oil Storage Tank to OPERAllLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at icast IlOT STANDilY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SilUTDOWN wi.hin the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

-4 NRC 92039.X

-8 a INSERT C (New Action Statement 3.8.1.1.g)

g. With No. 11 Fuel Oil Surage Tank inoperable, demonstrate the OPERAltliflY of No.21 Fuct Oil S; ors;c Tank by: 1) perforrning Surveillance Requircrrent 4.8.1.1.2.a.2 (verifying 74,000 gallons) within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and
2) verifying the flow path fiorn No. 21 Fuel Oil Storage Tank to the dictcl generators within one hour. Restore the No.11 Fud Oil Storage Tank to OPERAllLE status within 7 days or be in at least IIOT STANI)llY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD M'.UTl)OWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

P i

t t

u

- NRC92039.X __

t

,,,n ,- , , , , , , . . , , - - , - - , , , , . , . .,. -, -,,,--r . . - . , , , -

4 e 3/4.8 ELECTRICAL POWCR SYSTEMS ,

[ 3/4.8.1 A.C. SOURCES

  • Shutdow.1 LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, +.he following A.C. electrical power sources shall be OPERABLE:
a. One circuit between the offsite transmission network and the onsite Clast 1E Distribution System, and
b. One diesel g rator with:

g/ fd

, .r;.r

1. A fu tank containing a minimum volume of 37 gallons of f

caddshA 6A AN g 2.

Siggg_jyit,em ontainin@'-e-minimum-volume-of-u seRTh , N M ~*

3. A fuel transfer pump.

APPLICABILITY: H0DE3 5 and 6.

ACTION:

i_

a. With less than the above minimum required A.C. electrical power sources OPERABLE for reasons other than the perfonnance of Surveillance Requirement 4.8.1.1.2.d.1 on No.12 diesel generator:
1. Imediately* suspend all operations involving CORE ALTERATIONS, positivn reactivity changes, movement of irradiated fuel and movement of heavy loads over irradiated fuel, and
2. Immediately initiate corrective actions to restore the minimum A.C. electrical busses to OPERABLE status, and
3. Establish containmcr.t pe.netration closure as. identified in Specification 3.9.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

(

Performance of ACTION a. shall not preclude completion of _ actions to establish a safe conservative position.

3/4 8-6 CALVERT CLIFFS - UNIT 1 AmendmentNo.1$

- . _- ~__. - . . - ...-.. -.~.-

l I

1 INSERT I) (for Technical Specincation 3.8.1.2.b.2) i

a. No. 21 Fuel Oil Storage Tank containing a minimum volume of 74,(XX) gallons of fuel oil, and
b. No.11 Fuct Oil Storage Tank containing a minimum volume of 32,(XX) gallons of fuel oil,'and I

4 i

)

s - +-,~ -e ,ya e- m m ,w ... , r ~e,p-- - , ,

i 4 a 3/4.8 ELECTRICAL POWER SYSTEMS

(~ LIMITING CONDITION FOR OPERATION (Continued)

b. With less than the above mininium r quired A.C. electrical power sources OPERABLE for the performance of Surveillance Re 4.8.1.1.2.d.1 on No.12 emergency diesel generator:** "quirement -
1. Verify either two 500 kV offsite )ower circuits or a 500 kV offsite power circuit and the 69 (V SMECO offsite power circuit are available and capable of being used. This availability shall be verified prior to removing the OPERABLE emergency diesel generators and once per shift thereafter,
2. suspend all operations involving CORE ALTE1ATIONS, positive reactivity changes, movement of irradiated fuel and movement of heavy loads over irradiated fuel, .

~

3. Have established contain.aent penetration closure as identified i' Specification 3.9.4,
4. An emergency diesel generator shall be OPERABLE and aligned to provide power to the emergency busses within seven days.
5. Within two weeks prior to the planned unavailability of an OPERABLE emergency diesel generator, a temporary diesel generator shall be demonstrated available.

..m.,

6. A temporary diesel generator shall be demonstrated available by starting it at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
7. If ACTIONS b) 1 through b) 6 are not met, restore compliance with the ACTIONS within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or resture an OPERABLE emergency diesel generator within the next 4 hoars.

notd JJASERT E. -+

SURVEILLANCE REQUIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirtments of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2.a.5.

m The provisions of ACTION b) are no longer applicable following the installation of two additional emergency diesel generators.

CALVERT CLIFFS - UNIT 1 3/4 8-7 Amendment No. Jfs

- _ _ - _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - . _ - _ _ - _ _- _ _ _ _ _ _ _ _ - - _~

__ _ - . . ._. __. _.- _ . _ . _ _ _ _ . . _ _. ___. - . _ _ _ ._ _ s 4

  • INSERT E (New Action Statement 3.8.1.2.c and d)
c. With No.11 Fuci Oil Storage Tank inoperable, demonstrate the OPERAlllLI'lY of No.21 Fuel Oil Storage Tank by: 1) performing Surveillance Requirement 4.8.1.1.2.a.2 (verifying 74,000 gallons) within one hour; and 2) verifying the flow path from No. 21 Fuci Oil Storage Tank to the diesel generator within one hour.
d. With No. 21 Fuel Oil Storage Tank inoperable, restore No. 21 Fuel Oil Storage Tank to OPEllAlli,E status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or suspend all operations involving CORE AllfERATIONS, positive reactivity changes, movement of irradiated fuel and movement of heavy loads over irradiated fuel.

4 gwvy-_ prr-sr e e --r+1-- y-- 9'*-'wwg-m- p eer---s'-*r, e &=--fr-e-*ywmpi+=-w'~ei-n+r*-u-ag -

yymmwg-en--pr- yfWs-e'-

i 3/4.8 ELECTRICAL POWER SYSTEMS

( RAS E., i The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be svailable to supply the safety related equipment required for 1) the safe l shutdown of the facility and 2) the mitigation and control of accident conditions within the facility. The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the Adc/ requirements of 10 CFR Part 50, Appendix A General Design Criteria 17.

The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the levr ' of degradation. The OPERABILITY of the power 1ources are consistent wi' , the initial condition assumptions of the accident analyses and are based upon maintaining at lecst one of each of the onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an 3ssumed loss of offsite power and single failure of the other onsite A.C. source.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that

1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the facility states, t The ACTION requirements for LCOs 3.8.1.2 and 3.8.2.2 are associated with the perfonnance of Surveillance 4.8.1.1.2.d.1 on No.12 emergency diesel generator with Unit 1 shutdown and Unit 2 at power. This requires that No.

l 31 emergency dic el generator be aligned to Unit 2. The actions specified reduce the probability of a loss of offsite power by requiring the availability of two offsite power circuits. A temporary diesel is available which has sufficient capacity to carry all required shutdown loads. This ACTION only applies to the perfonnance of Surveillance 4.8.1.1.2.d.1 on No. 12 emergency diesel generator. Perforu nce of Surveillance 4.8.1.1.2.d.1 on No.11 emergency diesel generator would not violate the LCOs for 3.8.1.2 and 3.8.2.2 because the No. 12 emergency diesel generator may be aligned to either unit.

l l

l >

CALVERT CLIFFS - UNIT 1 B 3/4 8-1 AmendmentNo.)$

INSERT F (new paragraph for IIASES 3/4.8)

Tne OPEllAlllLI'lY of No. 21 and No.1I Fuel Oil Storage Tanks ensure that at least 7 days of fuel oil will be reserved below the internal tank standpipes for operation of one diesel generator on each unit, assuming one unit under accident conditions with a diesel generator load of 3,000 Kw, and the i

opposite unit under normal shutdown conditions with a diesel generator load of 2,500 Kw.  !

1 Additionally, the OPEllAlllLI'lY of No. 21 Fuel Oil Storage Tank ensures that in the event of a loss of offsite power, concurrent with a loss of the non. bunkered fuel oil storage tank (tornado / missile i l

event), at least 7 days of fuel oil will be available for operation of one diesel generator on each unit, assurning both diesel generators are loaded to 2,500 Kw. j

'lix OPEllAllllJlY of the fuel oil day tanks ensures that at least one hour of diesel generator operation is available without makeup to the day tanks, assuming the associated diesel generator is loaded to 3,250 Kw.

l l

l NRC 92039X i

.:,.,.. . - , - . ~ - . _ - , -- -, -,-,-.- . . _ _ . -

- . :- . a:- -

V ATTACllMENT (2) k UNIT 2 TECIINICAL SPECIFICATION t i REVISED PAGES 3/4736 3/481 ,

3/483 -

3/486 3/487 B3/48-1 m

j 4

/

1 3/4.7 PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

{

3. Verifying that each high pressure pumo starts (sequentially) to maintain the Fire Suppression Water System pressure ,

t 80 psig.

g. At least once per REFUELING INTERVAL by: (1) perfonning a flow test of the system in accordance with Chapter 5 Section 11 of the Fire Protection Handbook,14th Edition, published by the National Fire Protection Association, and (2) perfonning a system functional test which includes simulated automatic actuation of the system throughout its operating sequence and cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel.

4.7.11.1.2 _ The fire pump diesel engine shall be demonstrated OPERABLE: ,

a. At least once per 31 days by verifying:
1. The diesel fuel oil day storage tank contains at least 174 gallons of fuel, and .
2. The diesel starts from ambient conditions and operates for at least 30 minutes. This test shall be perfonned on a STAGGERED TEST BASIS with the test required by Specification 4.7.11.1.1.b.
b. At least once per.92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTM-D270-65, is with the acceptable limits specified in Table 1 of ASTM 0975 4' hen checked for viscosity, water and sediment. BI
c. At least once per 18 months by:
1. Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recomendations for the class of service, and
2. Verifying the diesel starts from ambient conditions on the auto-start signal and operates for 120 minutes while loaded with the fire pump.

l-i l

(.

CALVERT CLIFFS - UNIT 2 1/4 7-36 Amendment No. $7

+

3/4.8 ELECTRICAL POWER 'YSTEMS

( 3/4.8.1 A.C. SOURCES Operatino LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E Distribution System consisting of either:
1. Two 500 kV offsite power circuits, or as necessary
2. The 69 kV SHECO offsite power circuit described in the January 14, 1977 Safety Evaluation and one 500 kV offsite power circuit; -

and -

b. Two separate and independent diesel generators (one of which may be a swing d'a el generator capable of serving either Unit 1 or Unit 2) witt ed, da I gparate h fue tanks containing a minimum volume of 1.

3751ga11ons of fuel for ee:h diesel generator, o I4cn k $1 s.TTA ->A separate fuel transfer pump for each diesel generator.

APPL.ICABILITY: H0 DES 1, 2, 3 and 4.

ACTION:

a. With two offsite circuits of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by perfonning Surveillance Requirement 4.v.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; ind 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, unless the diesel generators are already operating. Restore at least two l~

CALVERT CLIFFS - UNI 7 2 3/4 8-1 Amendment No. J47 i

1 1

INSERT A (for Technical Specification 3.8.1.1.b.2) i

a. No. 21 F6cl Oil Storage Tank containing a minimum volume of 74,0(X) gallons of fuel  !

i oil, and ,

l

b. r No.11 Fuel Oil Storage Tank containing a minimum volume o 32,00() gr.llons c,f fuel .

l oil, and I

f I

l l

l ..

t

.. . . = . - - .

3/4.o ELECTRICAL POWER SYSTEM 3 LIMITING CONDITION FOR OPERATION (Continued) i

{

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least  ;

two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from  ;

time of initial loss or be in at 1:ast HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.  !

&W r vm j

f. Wi4h-ene-Diese14uel-0WStorage-?ank-inoperable;-demonstcate-the '

SPE RABILITY1f-the-remaining-+. an k-by:-1)-per femingiury e tiitnce-Requirement-4,&.4ci,Aa 2-(veHfying-3&r500-gallons)-within-one 7'Pf "" hour-and-at-least- mee-per-B-hours-thereafter,,--andJ)--verifying- ,

M, theJ4owpath-fra < e-OPERABLE-fusi titi storave-tank-to-the  !

JN5dRT d diesel-gener4torf o 'tik-one-hourr-Restore-two-storage-tanks-to 1

.CPERABLE-ststus , M2 tours-dr-be-tn at-least-H0T-STANDBY  !

% within-the-rext 6-aours-and-in-COLD-SHUTDOWN-within-the-following 1(

30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />,-(#7TEs-I-f-the-tenk-ts-inoperable; maintatran u,v00 gallon 11 ternate-fuel source onstter) not apalicahle /or the-fol4owing This conditionra-._1)_when #21_ is.llissel-Fuel-Of1-Storage-Tank-is ACTIOM.itatement inope ra bl44u r4 ag-the-period-from-April-1-through-Sep tembe r-30 duwto-the-higher-probabHity of ternade-occurrences-during-this timeJrawandJ) when two-Diesel-fuel-Oli-Storage Tanks are t

SURVEILLANCE REQUIREHENTS 4.8.1.1.1 Each required independent circuit between the offsite transmission network and the onsite Class 1E Distribution System shall be: -

a. Demonstrated OPERABLE, as follows:
1. For each 500 kV offsite circuit, at least once per 7 days by verifying correct breaker alignments and indicated power availability.

(

CALVERT CLIFFS - UNIT 2 3/4 8-3 Amendment No. J,4%

INSEitT II (for Technical Specineation 3.8.1.1 Action f.)

With the No. 21 Fuel Oil Storage Tank inoperable, during the period from:

1. October 1 to March J.1. demonstrate the OPERAEILITY of the No.11 Fuel Oil Storage Tank by: 1) performing Surveillance Requirement 4.8.1.1.2.a.2 (verifying 74,0(X) gallons) within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereaftert and 2) verifying the Dow path from the No.11 Fuel Oi! Storage Tank to the diesel generators w; thin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Restore No. 21 Fuel Oil Storage Tank to OPERAllLE itatus within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least I!OT STANDilY witnin the next 5 hourt, and la COLD SIIVrDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
2. APJjij 1 to September ~,0. demonstrate the OPERAlllLITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. Restare No. 21 Fuel Oil Storage Tank to OPERABLE status ,

within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at ! cast !!OT !TTANDilY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SilUTDOWN within the following 3C hours.

- NRC72039.X

- .- , , , - _ ~ . . . - . . . - . . . - . ,

INSERT C (New Action Stateinent 3.8.1.1.g)

g. With No.11 Fuct Oil Storage Tank inoperable, demonstrate the OPERAlllLI'IY of-No.21 Fuel Oil Storage Tank by 1) performing Surveillance Requirement 4.8.1.1.2.a.2 (verifying T4,000 gallons) within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and 2) verifying the flow path from No. 21 Fuel Oil Storage Tank to the diesel generators within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Restore No.11 Fuel Oil Storage Tank to OPERAllLE status with5 7 days or be in at least Il0T STANDilY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SIIUTi>OWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. .

E NRC 92039X ~

4. .

3/4.8 f_LECTRICAL POWER SYSTEMS f 3/4.8.1 A.C. SOURCES Shutdo_s l

LIMITING CONDITION FOR OPERATION l

3.8.1.2 As a minimum, the following A.C. clectrical power sources shall be l OPERABLF:

l

a. One circuit between the offsite transmission network and the onsite Class IE Distribution System, and
b. One diesel ge ca.to with: l ll d a7y
1. A hfuel Tn containing a minimum volume o 75 gallcns of consi b

'\2.

Md A

LS t on-e fue ,

contafn%

nd "

o Win h inimum-vol 27JJens ,

  • 3. A fuel transfer pump.

APPLICABILITY: H0 DES 5 and 6.

ACTION:

a. With less than the above minimum required A.C. electrical power sources OPERABLE for reasons other than the perfonnance of

?.rveillance Requirement 4.8.1.1.2.d.1 on No.12 diesel generator:

1. Imediately' suspend all operations invo'. eing CORE l ALTERATIONS, p gsitivt reactivity changes, 6.70vement of

.rradiated fuel and movement of heavy loads over irradiated fuel, and L

2. Imediately initiate correr.tive actions to restore the minimum A.C. electrical power sources to OPERABLE status, and l 3. Establish containment penetration closure as identified in l Specification 3.9.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

L i

l Performance of ACTION a. shall r.ot preclude completion of ~ actions to

\- establish a safe conservative position.

CALVERT CLIFFS - UNIT 2 3/4 8-6 Amendment No. M1

4 *. .

INSEl(T I) (for Tuhnical Specification 3,8.12.li.2)

a. No. 21 Fuel Oil Storage Tank containing a minimum volume of 74,(XX) gallons of fuel oil, and
b. No. I11 uci Oil Storage Tank containing a minimum volume of 32,000 gallons of fuct oil, and  ;

i c

h 0

h

, ,, -~~.-,.~..,L,,,. . . , . . , , , . - . _ , - , _ , . _ , . . ,,, ,. _-, , .,-~,L,,, , - , _ , - , ,.7m.,m.---,-,-~,.m...._, , , - - ,,s., ,i.,_._.,~,, ,--

4 . _ _.. _. . _ _ . _ . -

_.s.. . - - -

6 3/4.8 ELECTRICAL POWER SYSTEMS

( LIMITING CONDITION FOR OPERATION (Continued,

b. With less than the above minimum required A.C. electrical power sources OPERABLE for the perforulance of Surveillance Requirement 4.8.1.1.2.d.1 on No. 12 emergency diesel generators" y .
1. Verify either two 500 kV offsite )ower circuits or a 500 kV offsite power circuit and the 69 (V SMECO of fsite power circuit are available and capable of being used. This availability shall be verified prior to removing the Oi'LRABLE emergency diesel generators and once per shift thereafter,
2. Suspend all operations involving CORE ALTERA110NS, psitive reactivity changes, movement of irradiated fuel and, movement of heavy load!. over irradiated fuel, ,
3. Have established containment penetration closure as identified in Specification 3.9.4,
4. An emergency diesel generator shall be OPERABLE and .sligned tc, provide power to the emergency busses within seven days.
5. Within two weeks prior to the planned unavailability of an OPERABLE emergency diesel generator, a temporary diesel generator shall be demonstrated available.
6. A temporary diesel generator shall be demonstrated available by starting it at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
7. If ACTIONS b) I through b) 6 are not met, restore compliarece 3 with the ACTIONS within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or restore an OPERABLE

/)cfd N emergency diesel generator within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

~llM67iTE > a SURVEILLANCE REQUIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for Requirement 4.8.1.1.2a.5.

l The provisions of ACTION b) are no longer applicable following the ir.:,tallation of two additional emergency diesel generators.

CALVERT CLIFFS - UNIT 2 3/4 8-/ Amerdment No. $)

o *> .

INSERT E (New Action Statement 3.8.1.2.c and d)

c. With No.11 Fuel Oil Storage Tank inoperable, demonstrate the OPERAllllllY of No.21 Fuel Oil Storage Tank by: 1) performing Surveillance Requirement 4.8.1.1.2.a.2 I (verifying 74,(x4 gallons) within one hour; and 2) verifying the flow path from No. 21 Fuel-Oil Storage Tank to the dicsci 3 :ncrator within one hour.

l 1

d. With No. 21 Fuel Oil Storage Tank inoperable, restore No. 21 Fuel Oil Storage Tank to l

.I OPERAllLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or suspend all operations involving CORE Alli'ERATIONS, positive reactivity changes, movement of irradiated fuel and movement of  !

heavy loads over irradiated fuel, r-t w~'n v v - - - , , . . . . . . y . . . . - _ . _ , _ , , , , , , _.g 3 , v'4 p , w. 7,-y,

3/4.8 LLECTRICAL POWER SYSTEMS

( arSu j

The OPERABILITY of the A.C. and D.C. power sources and associated '

distribution systems during operation ensures that se Nient power will be available shutdowntoofsupply the safety)related the facility equipment and 2 the mitigation requirwofforaccident and control 1) the safe conditions within the facility. The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the N/\ requirements of 10 CFR Part 50, Appendix A. General Design Criteria 17.

D EW F;' ~>

The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation connensurate with the level of degradation. The OPERABILITY of the power sources are consistent with the initial condition assumptions of the accident analyses and are based upon maintaining at least one of each of the onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of the other onsite A.C. source.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that

1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the facility status.

Y The ACTION requirements for LCOs 3.8.1.2 and 3.8.2.2 are associated with the perfomance of Surveillance 4.8.1.1.2.d.1 on No.12 emergency diesel generator with Unit 2 shutdown and Unit 1 at power. This requires that No.

21 emergency diesel generator be aligned to Unit 1. The actions specified reduce the probabilicy of a loss of offsite power by requiring the availability of two offsite power circuits. A temporary diesel is available which has sufficient capacity to carry all required shutdown loads. This ACTION only applies to the perfomance of Surveillance

. 4.8.1.1.2.d.1 on No.12 emergency diesel generator. Performance of Surveillance 4.8.1.1.2.d.1 on No. 21 emergency diesel generator would not -

violate the LCOs for 3.8.1.2 and 3.8.2.2 because the No. 12 emergency diesel generator may be aligned to either unit.

k l

CALVERT CLIFFS - UNIT 2 B 3/4 8-1 Amendment No. #p

l 1

\

INSEltT F (new paragraph for llASES 3/4.8)

'Ihe OPEllAllllflY of No. 21 and No.11 Fuel Oil Storage Tanks ensures that at least 7 days of fuel oil will be reserved below the internal tank standpipes for operation of one diesel generator on cach unit, assuming one unit under accident conditions with a diesel generator load of 3,(XX) Kw, and the opposite unit under norrnal shutdown condition with a diesel generator load of 2,5(X) Kw.

Additionally, the OPEllAltilIIY of No. 21 Fuel Oil Storage Tank ensures that in the event of a loss l l

of of fsite power, concurrent with a loss of No.11 Fuel Oil Storage Tank (tornado /rnissile event), at least 7 days of fuel oil will be availhhle for operation of one diesel generator on each unit, assuming both diesel generators are loaded to 2,$tKJ Kw.

The OPEllAllllJIY of the fuel oil day tanks ensures that at least one hour of diesel generator operation is available without rnakeup to the da; tanks, assurning the associated diesel generator is loaded to 3,250 Kw.

l l

NRC 92039.X

'J

e 3 r '.

Ai 1 ACHMENT (3) l

! FUEL OIL STORAGE TANKS AND DISTRIBUTION DIAGRAM i

FUEL OIL STGRAGE FUEL OILSTORAGE i

! "ANK 11 TANK 21 l  : t i . i >

l

! i***"'  !, '

! ->c4 _

+44 - -

l r

I L

i vomane ! 1I j

ommes : 1P i7 }r, l Jk  !\ /\ 4k i  !

yw x: ', *

?

su nmunn m;m.sn sua

( f ca puwe ': il7 ne m R ,

6 tuuvem sums DS BUpsty eaEacem to 4 [

2 e

) L M _ , s EPR EF"LV *GALTR P g g f r ' ~

  1. # v y y JL li v v

/ JL v v JL

= t l

! II i g- q- g- [

i 3-

. . I II II if r Toco m ot Tooe rteten vo oanuetet DmYTanut11 OmvTanR 4 Omr Tilsm2s I

_ _ _ _ _ _ _ . __ _ _ _ _ _ _ .