Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113B346 + (ML20113B346)
- ML20113B358 + (ML20113B358)
- ML20113B367 + (ML20113B367)
- ML20113B370 + (ML20113B370)
- ML20113B371 + (ML20113B371)
- ML20113B374 + (ML20113B374)
- 05000277/LER-1996-006-01, :on 960522,Unit 2 RPS Power Supply Unexpectedly Lost.Caused by Human Performance.Rps Bus Supply Restored & Operator Involved in Event Coached on self-checking Practices.W/Undated Ltr + (ML20113B378)
- ML20113B380 + (ML20113B380)
- ML20113B386 + (ML20113B386)
- ML20113B387 + (ML20113B387)
- 05000327/LER-1996-005-02, :on 960526,ESF Actuation Occurred Resulting in DG Start.Cause Unknown.Diagnosed Condition,Reset Start Signal & Secured Actuated Equipment + (ML20113B391)
- ML20113B394 + (ML20113B394)
- ULNRC-03395, Forwards Response on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Per NRC Ltr + (ML20113B395)
- ML20113B399 + (ML20113B399)
- ML20113B401 + (ML20113B401)
- RBG-20350, Informs of Review of Shift Staffing in Light of Operating Experience on Shift,In Response to a Schwencer to Wj Cahill.Current Training & Exam Plans Continue Toward Fully Qualified six-shaft Rotation + (ML20113B407)
- 05000352/LER-1996-012, :on 921103,identified Improper Fuse Sizing. Caused by Personnel Error.Approved Design Change Re Proper Fuse Coordination & Reviewed Modifications Associated W/Fuse Ratings + (ML20113B410)
- ML20113B426 + (ML20113B426)
- 05000454/LER-1984-042-02, :on 841031,data Sheet Incomplete for Surveillance 4.7.10.3.1 Not Accounting for electro-manual Pilot Control for Valve.Caused by Typo.River Screen House CO2 Sys Walked Down & Procedure Revised + (ML20113B432)
- ML20113B443 + (ML20113B443)
- ML20113B458 + (ML20113B458)
- ML20113B473 + (ML20113B473)
- 05000272/LER-1985-006, :on 850320,containment Sump in-leakage Identified as Svc Water Leak on Containment Fan Coil Unit 13 Motor Cooler.Caused by Leak from Head Gasket.Motor Cooler Replaced.Reported Per IE Bulletin 80-24 + (ML20113B482)
- ML20113B508 + (ML20113B508)
- ML20113B510 + (ML20113B510)
- ML20113B517 + (ML20113B517)
- ML20113B522 + (ML20113B522)
- ML20113B523 + (ML20113B523)
- NRC-96-0057, Responds to Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 from Insp Rept 50-341/96-02.Fee Paid + (ML20113B530)
- 05000255/LER-1984-026, :on 841207,valve Leakage Allowed Second Safety Injection Tank to Drain Below Min Level,Exceeding Tech Spec Limit.Caused by Inaccurate Level Indication.Instrument Recalibr + (ML20113B541)
- ML20113B542 + (ML20113B542)
- PLA-2371, Monthly Operating Repts for Nov 1984 + (ML20113B552)
- ML20113B557 + (ML20113B557)
- 05000334/LER-1985-006, :on 850221,reactor Trip Occurred.Caused by Personnel Error in Operation of Main Feedwater Regulating Valves.Guidance on Operation & Transfer of Regulation Valves from Manual to Automatic Developed + (ML20113B565)
- ML20113B566 + (ML20113B566)
- ML20113B569 + (ML20113B569)
- ML20113B573 + (ML20113B573)
- ML20113B576 + (ML20113B576)
- ML20113B577 + (ML20113B577)
- ML20113B583 + (ML20113B583)
- ML20113B584 + (ML20113B584)
- ML20113B586 + (ML20113B586)
- ML20113B589 + (ML20113B589)
- ST-HL-AE-5396, Submits Special Rept of Plugging of SG Tubes as Result of eddy-current Testing Indications + (ML20113B595)
- PY-CEI-NRR-2064, Forwards Annual Financial Repts & Certified Financial Statements for Licensees.Also Encl Is Form 10-K,Annual Rept to Us Securities & Exchange Commission,For FY95 + (ML20113B597)
- ML20113B598 + (ML20113B598)
- ML20113B600 + (ML20113B600)
- ML20113B602 + (ML20113B602)
- ML20113B603 + (ML20113B603)
- JPN-96-031, Forwards Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B to 10CFR50,App J at Plant + (ML20113B607)
- ML20113B608 + (ML20113B608)