ML20113B370

From kanterella
Jump to navigation Jump to search
Potential Significant Deficiency Rept SD-67 Re Improper Installation of Conduit Seal for Rosemount Pressure Transmitters.Initially Reported on 841214.Investigation Incomplete.Next Rept Will Be Submitted by 850501
ML20113B370
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/14/1985
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
F0713A, F713A, SD-67, NUDOCS 8504110158
Download: ML20113B370 (2)


Text

I-o IFFIMTIES o*""*'

"'"" S**" suoi. Benn. conn.ci cui

.".."..m..o.,,

j P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 (203) 666-69 M

C '*
  • ,',"J "

y L

L March 14,1985 Docket No. 50-423 F0713A Dr. Thomas E. Murley Regional Administrator Region i U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Reference:

(1)

W.

G. Counsil letter to T.

E. Murley, F0658A, dated January 11,1985.

Dear Dr. Murley:

Millstone Nuclear Power Station, Unit No. 3 Reporting of Potential Significant Deficiencies in Design and Construction:

Improper Installation of Conduit Seal for Rosemount Pressure Transmitters (SD-67)

In a December 14, 1984 telephone conversation between your Mr. T. Rebelowski and our Mr. R. E. Lefebvre, Northeast Nuclear Energy Company (NNECO) reported a potential significant deficiency in trie construction of Millstone Unit No. 3 as required by 10CFR50.55(e).

The potential significant deficiency involved four (4) Rosemount differential pressure transmitters with improper conduit installations.

The Rosemount instruction manual requires a qualified thread sealant be applied where the conduit enters the transmitter. This sealant (in this case, grafoil tape sealant) was not used for these transmitters and is necessary to prevent moisture from accumulating in the terminal side of the transmitter housing during accident conditions.

Further investigation determined that all Rosemount transmitters which utilize a Litton Veam connector had conduit installed without the grafoil tape thread scalant, as required. All Category i Rosemount transmitter conduit seals will be reworked by NNECO on a post-turnover basis.

l 8504110158 850314 PDR ADOCK 05000423 s

PDR g g p ( h-

c 8

9 -

Our architect-engineer, Stone & Webster Engineering Corporation, is in the process of reviewing all instrumentation installations which utilize a Litton Veam conduit connector to determine if a qualified thread sealant was used. As such, we are not able to provide a final report at this time. We will provide you with an update on this matter by May 1,1985.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY f

,l Alitev W. G. Counsil '

Senior Vice President cc:. Mr. 3. M. Taylor, Director Division of Inspection and Enforcement O. S. Nuclear Regulatory Commisison Phillips Building 7920 Norfolk Avenue -