Interim Deficiency Rept DER 85-05 Re Nonsegregated Bus Fire Penetrations W/O Proper Taping on Bus Conductor within Firestop Area.Initially Reported on 850219.Final Rept Will Be Submitted by 850405
ML20113B374
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/19/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-32173-TDS, DER-85-05, DER-85-5, NUDOCS 8504110161
Download: ML20113B374 (3)


Text

o .wnw Arizona Nuclear Power Project, e"'. U P O tsot 52034 e PHOENIX. ARIZONA 85072-2034 l

March 19, 1985I ANPP-32173-TDS/PJC U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attentior.: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Pro.jects Subj ect: Interim Report - DER 85-05 A 50.55(e) Potentially Reportable Deficiency P.clating To Nonsegregated Bus Fire Penetrations Without Proper Taping On The Bus Conductor File: 85-019-026; D.4.33.2

Reference:

Telephone Conversation between A. Hon and T. Bradish on February 19, 1985

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the ref-crenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that this information will be finalized by April 5, 1985 at which time a complete report will be submitted.

Very truly yours, A #

((, g[ (U1 0 alLC E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/PJC/nj Attachnint cc: See Page Two 8504110361 950319 PDR S ADOCK 00000520  %)

PDR t ZE 27

pus- j l

l D. F. Kirsch Acting Director

., ANPP-32173-TDS/PJC DER 85-05 Page Two cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J. R. Bynum J. M. Allen D. Canady A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman M. L. Clyde M. Matt T. J. Bloom D. N. Stover J. D. Houchen J. E. Kirby Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339

,, INTERIM REPORT - DER 85-05 POTENTIALLY REPORTABLE DEFICIENCY s . ARIZONA NUCLEAR POWER PROJECT (ANPP)

PVNGS UNITS 2 & 3

-I. Potential Problem

. Nonsegregated bus fire penetrations do not have the proper taping on the bus conductor within the firestop area. The lack of tape results in an installation that is not in accordance with the manufacturer's approved fire seal design and, therefore, is suspect.

The-problem was identified in Unit I by NCR SE-5260 (superseded by EER 84-PB-002), A similar problem is thought to exist in Units 2 and 3. The Unit i deficiency is being evaluated under Potentially Reportable Occurrence No. 1-85-0031,- issued by ANPP Operations.

II. Approach To and Status Of Proposed Resolution Bechtel Engineering is currently evaluating the quantity of com-bustibles within 20 feet of the fire penetrations to determine if a fire could degrade the penetrations.- This evaluation will determine reportability and technical justification for corrective action.

III. Projected Completion of Corrective Action and Submittal of the Final Report.

The complete evaluation and final report are forecast to t' completed by April.5, 1985.

.