AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 352 UNIT LIMERICK UNIT 1 DATE DECEM8EA 14.1984 l

COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (2151 841-5022 MONTH NOVEMBER 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

16 0

i l

l 5

d I

i d

]

8501220032 841130 PDR ADOCK 05000352 ph R

PDR l

- 4 l

b\\

er

i OPERATING OATA REPORT DOCKET NO. 50 - 352 DATE DECEH8ER 14,1984 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (2151 841-5022 OPERATING STATUS

1. UNIT NAME LIMERICK UNIT 1 i NOTES: UNIT 1 IS IN STARTUP TESTING. l l

1

3. REPORTING PERIOD NOVEMBER, 1984 l

FACILITY OPERATING LICENSE l

1 I

3. LICENSED THERMAL PdWER(MWT) 165 i

NPF-2T, ISSUED 10/26/84, RE-l 1

I

4. NAMEPLATE RATING (GROSS MWEl s 1092 l

STRICTS POWER LEVELS NOT TO l

I I

1055 l

EXCEED SE OF THE RATED POWER. I

5. DESIGh ELECTRICAL RATING (NET MWEls I

i l

ELECTRIC OUTPUT FROM THE UNIT l O. MAXIMUM DEPENDABLE CAPACITY (GRCSS MWEls l

1 l

WAS NOT YET ACHIEVED.

l T. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH Tl SINCE LAST REPORT, GIVE REASONS
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEls
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH VR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 0

0 0

13. NUMBER OF HOURS REACTOR WAS CRITICAL 0

0 0

13. REACTOR RESERVE SHUTDOWN K)URS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 0.0 0.0 0.0
15. UNIT RESERVE SHUTDOWN HDURS 0.0 0.0 0.0
10. GROSS THERMAL ENERGY GENERATED (MWHI O

O O

1T. GROSS ELECTRICAL ENERGY GENERATED (MWHI O

O O

18. NET ELECTRICAL ENERGY GENERATED (MWHI O

O O

19. UNIT SERVICE FACTOR 0.0 0.0 0.0
20. UNIT AVAILABILITY FACTOR 0.0 0.0 0.0
21. UNIT CAPACITY FACTDR (USING MDC NET)

-0.0-0.0 0.0

22. UNIT CAPACITY FACTDR (USING DER NET) 0.0 0.0 00
23. UNIT FORCED OUTAGE RATE 0.0 0.0 0.0
20. SH JTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACHis
25. IF SHUTDOWN AT END OF REPORT PERIDO, ESTIMATED DATE OF STARTUP 12/19/84
20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONis FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 INITIAL ELECTRICITY 3/30/85 COMMERCIAL OPERATION 3RD QTR 85

. ~.

..y UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352 UNIT NAME LIMERICK UNIT 1 DATE DECEMBER 14.1984 REPORT MONTH NOVEMBER, 1984 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY

(.

W.M.ALDEN ENGINE ER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 l

l l

8 l METHOD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE I

lTYPElDURATIONIREASONISMJTTING DOWNi EVENT I CODE I CODE l ACTION TO NO.i DATE I (1)l (HOURSil (2) l REACTDR (3) 1 REPORT # 1 (4) l (5) l PREVENT RECURRENCE 1

I I

I I

I I

I I

I I

1 -

1 I

i 1

I I

(1)

(2)

(3)

(4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS

'S - SCHEDULED A - EQUIPMENT FAILtRE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA 3,/- MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TkAINING + LICENSE EXAMIN ATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE s

ABBP'

.\\

Docket No. 50-352 Attachment to Monthly Operating Report for November, 1984 LIMERICK GENERATING STATION NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES NOVEMBER, 1984 UNIT 1 Limerick Unit 1 was in the initial fueling mode at the beginning of November with 180 fuel assemblies loaded.

Fuel loading continued to completion on November 13.

Control rod friction and scram time testing followed fuel' loading and was completed successfully on November 18.

Final vessel assembly was then begun in preparation for the operational hydrostatic test.

This included removal of steam line plugs and installation of the moisture separator and steam dryer.

The vessel was heated with an Residual Heat Removal (RHR) pump and the head placed and tensioned.

The vessel hydrostatic test commended on November 27 and continued through the end of the month.

Other activities involving operations during the month included work off of preoperational test exceptions and completion of surveillance tests required prior to criticality.

Since all operations were conducted prior to initial criticality, there were no challenges to the main steam system safety / relief valves during this reporting period.

SLZ

.p >

[

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 m e4i.4 December 14, 1984 Docket No. 50-352 Director Office of Resource Management US Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Limerick Cenerating Station Monthly Operating Report Gentlemen:

Enclosed is the monthly operating report for Limerick Unit 1 for the month of November, 1984 forwarded pursuant to Technical Specification G.9.1.6.

Very t ly you s, A

_ l]

I Lj v^y' W. T.

Ullrich Superintendent Nuclear Generation Division Attachment Director, Office of Inspection & Enforcement, USNRC (12 copies) cc:

Dr. T.

E.

Murley, NRC Mr. Stan P. Mangi, PA Dept. of Envir. Resources,

Mr.

P. A.

Ross, NRC (4 copies)

INPO Records Center See Attached Service List

/ /