ML20113B426

From kanterella
Jump to navigation Jump to search
Potential Significant Deficiency Rept SD-75 Re Nonconforming Terminations in Equipment Supplied by CVI Corp.Initially Reported on 850213.S&W in Process of Developing Insp & Repair Program.Next Rept Will Be Submitted by 850612
ML20113B426
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/15/1985
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
F0698A, F698A, SD-75, NUDOCS 8504110181
Download: ML20113B426 (2)


Text

.

/

NORT5 EAST tfTILETIES

  • a*' o"'"" S*'*a Sa' B""a c=" cut f

tw ccuenevcut uma me no.ca cow-

'E "~

HARTFORD, CONNECTICUT 06141-0270 c

)

L g

g etwe veura n=ce cow-(203) 666-6911 avwast ucu aswaavcow-March 15,1985 Docket No. 50-423 F0698A Dr. Thomas E. Murley Regional Administrator Region I

(

U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Dr. Murley:

Millstone Nuclear Power Station, Unit No. 3 Reporting of Potential Significant Deficiencies in Design and Construction:

Nonconforming Terminations in CVI Corporation Equipment (SD-75)

In a February 13, 1985 telephone conversation between your Mr. T. Rebelowski and our Mr. R. K. McCarthy, Northeast Nuclear Energy Company (NNECO) reported a potential significant deficiency in the construction of Millstone Unit No. 3 as required by 10CFR50.55(e).

The potential significant deficiency involves improper terminations found in equipment supplied by CVI Corporation. Termination deficiencies include crimps which were unacceptable per vendor's instructions, terminations crimped with the wrong tools, multiple conductors crimped in one lug, and incorrect lug size used.

l The subject terminations appear in the following safety-related equipment at Millstone Unit No. 3:

l o

HVQ* ACUS 1 A, IB, 2A, IB - Engineered Safety Features Building self contained air conditioning units.

l o

HVR*PNLFLT 1 A, IB - Auxiliary Building filtration units.

o HVR*PNLFLT 2A,2B - Fuel Building filtration units.

o HVR*PNLFLT 3A, 3B - Supplementary Leak Collection and Release System filtration units.

8504110181 850315 PDR ADOCK 05000423 S

PDR i

m A,

o Our. architect-engineer, Stone & Webster Engineering Corporation, is in the process. of developing an inspection and. repair program to correct this deficiency. We will provide you with an update on this matter by June 12,1985.

Very truly yours, j-

. NORTHEAST NUCLEAR ENERGY COMPANY

/.khu~

W. G. Counsil Senior Vice President

{

i cc:

Mr. 3. M. Taylor, Director Division of Inspection and Enforcement

. U. S. Nuclear Regulatory Commission Phillips Building.

7920 Norfolk Avenue i

Bethesda, MD 20814 4

x

- - -