ML20113B426
| ML20113B426 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/15/1985 |
| From: | Counsil W NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| F0698A, F698A, SD-75, NUDOCS 8504110181 | |
| Download: ML20113B426 (2) | |
Text
.
/
NORT5 EAST tfTILETIES
- a*' o"'"" S*'*a Sa' B""a c=" cut f
tw ccuenevcut uma me no.ca cow-
'E "~
HARTFORD, CONNECTICUT 06141-0270 c
)
L g
g etwe veura n=ce cow-(203) 666-6911 avwast ucu aswaavcow-March 15,1985 Docket No. 50-423 F0698A Dr. Thomas E. Murley Regional Administrator Region I
(
U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
Dear Dr. Murley:
Millstone Nuclear Power Station, Unit No. 3 Reporting of Potential Significant Deficiencies in Design and Construction:
Nonconforming Terminations in CVI Corporation Equipment (SD-75)
In a February 13, 1985 telephone conversation between your Mr. T. Rebelowski and our Mr. R. K. McCarthy, Northeast Nuclear Energy Company (NNECO) reported a potential significant deficiency in the construction of Millstone Unit No. 3 as required by 10CFR50.55(e).
The potential significant deficiency involves improper terminations found in equipment supplied by CVI Corporation. Termination deficiencies include crimps which were unacceptable per vendor's instructions, terminations crimped with the wrong tools, multiple conductors crimped in one lug, and incorrect lug size used.
l The subject terminations appear in the following safety-related equipment at Millstone Unit No. 3:
l o
HVQ* ACUS 1 A, IB, 2A, IB - Engineered Safety Features Building self contained air conditioning units.
l o
HVR*PNLFLT 1 A, IB - Auxiliary Building filtration units.
o HVR*PNLFLT 2A,2B - Fuel Building filtration units.
o HVR*PNLFLT 3A, 3B - Supplementary Leak Collection and Release System filtration units.
8504110181 850315 PDR ADOCK 05000423 S
PDR i
m A,
o Our. architect-engineer, Stone & Webster Engineering Corporation, is in the process. of developing an inspection and. repair program to correct this deficiency. We will provide you with an update on this matter by June 12,1985.
Very truly yours, j-
. NORTHEAST NUCLEAR ENERGY COMPANY
/.khu~
W. G. Counsil Senior Vice President
{
i cc:
Mr. 3. M. Taylor, Director Division of Inspection and Enforcement
. U. S. Nuclear Regulatory Commission Phillips Building.
7920 Norfolk Avenue i
Bethesda, MD 20814 4
x
- - -